Filtered by: District: District 9 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 78470 | HamiltonDistrict 9 | Removal and replacement of SN 033-0005 carrying IL 14 over a creek in McLeansboro. | — | Executed | Kieffer Bros. Construction Co., Inc. $324,050 · | ||
| Jan 19, 2018 | 78544 | JacksonDistrict 9 | Removal of two structures (SN 039-0015, SN 039-0051) over abandoned Illinois Central Golf railroad and construction of a 12' X 10' box culvert and bike path, 3 miles west of Carbondale. | — | Executed | E. T. Simonds Construction Company $1,927,198 · | ||
| Jan 19, 2018 | 78577 | FranklinJeffersonDistrict 9 | Crack sealing on 6 structures on I-57 in Franklin and Jefferson Counties. | — | Executed | E. T. Simonds Construction Company $110,873 · | ||
| Jan 19, 2018 | 78592 | WilliamsonDistrict 9 | 8.8 miles of roadway improvement including guardrail and culvert liner on IL 148. | — | Executed | E. T. Simonds Construction Company $3,348,417 · | ||
| Jan 19, 2018 | 78597 | SalineDistrict 9 | Concrete shoulders, traffic signals and pavement markings at the intersection of IL 13 and Old IL 13 in Harrisburg. | — | Executed | Brown Electric, Inc. $228,251 · | ||
| Jan 19, 2018 | 78614 | FranklinJeffersonDistrict 9 | Cleaning and painting 9 bridges on I-57. | — | Executed | ERA-Valdivia Contractors, Inc. $1,214,294 · | ||
| Jan 19, 2018 | 78616 | WilliamsonDistrict 9 | Roadway improvement on IL 37 from south of IL 148 to Pulleys Mill. | — | Executed | Southern Illinois Asphalt Co., Inc. $214,032 · | ||
| Jan 19, 2018 | 78620 | FranklinDistrict 9 | Addition of a non-automatic transfer switch and associated conduit and cabling at the West Frankfort pump station in West Frankfort. | — | Executed | F. W. Electric, Inc. $29,450 · | ||
| Jan 19, 2018 | 78621 | HamiltonJeffersonWilliamsonDistrict 9 | Cleaning and painting portions of 3 structures. | — | Executed | Thomas Industrial Coatings, Inc. $165,153 · | ||
| Jan 19, 2018 | 78625 | VariousDistrict 9 | Weed spraying along various routes. | — | Executed | The Daltons Inc. $160,542 · | ||
| Jan 19, 2018 | 99593 | JacksonDistrict 9 | Resurfacing on FAS 919 (Grant City Road) from Vercliff Drive to Boskydell Road. | — | Executed | E. T. Simonds Construction Company $564,376 · | ||
| Mar 9, 2018 | 46489 | VariousDistrict 9 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and installing new pavement marker at various locations throughout District 9. | — | Executed | STF, LLC d/b/a Traffic Control Company $159,925 · | ||
| Mar 9, 2018 | 78149 | JeffersonDistrict 9 | Removal and replacement of bridge SN 041-0036 carrying IL 37 over Atchison Creek, 8 miles south of IL 148. | — | Executed | E. T. Simonds Construction Company $1,588,926 · | ||
| Mar 9, 2018 | 78264 | WhiteDistrict 9 | Replace two single span structures with multiple barrel reinforced concrete box culverts on IL 141 2 miles west of New Haven (SN 097-0064 and SN 097-0029). | — | Executed | E. T. Simonds Construction Company $1,039,225 · | ||
| Mar 9, 2018 | 78459 | PopeDistrict 9 | 60 feet of milling, filling and diamond grinding to correct the profile at the north levee gate on IL 146 in Golconda. | — | Executed | E. T. Simonds Construction Company $56,974 · | ||
| Mar 9, 2018 | 78493 | AlexanderDistrict 9 | Repairs to the navigational and aerial lighting of the structure carrying four lanes of I-57 over the Mississippi River connecting Alexander County, IL and Mississippi County, MO (SN 002-0022) | — | Executed | Brown Electric, Inc. $435,062 · | ||
| Mar 9, 2018 | 78557 | UnionDistrict 9 | Full depth pavement replacement and ADA sidewalk upgrades at the intersection of IL 146 and Main Street in the City of Anna. | — | Executed | E. T. Simonds Construction Company $261,463 · | ||
| Mar 9, 2018 | 78579 | SalineDistrict 9 | Bridge repairs on SN 083-0048 and approach correction repairs on SN 083-0062 just north of Harrisburg. | — | Executed | E. T. Simonds Construction Company $350,766 · | ||
| Mar 9, 2018 | 78580 | WilliamsonDistrict 9 | 0.09 miles of pavement repair of the whitetopping and installation of radar detection equipment at IL 37 and Old IL 13. | — | Executed | Samron Midwest Contracting, Inc. $95,440 · | ||
| Mar 9, 2018 | 78589 | MassacDistrict 9 | Repairs to navigational and aerial lighting on bridge SN 064-0035 carrying four lanes of I-24 over the Ohio River connecting Massac County, IL and McCracken County, KY. | — | Executed | Brown Electric, Inc. $925,094 · | ||
| Mar 9, 2018 | 78628 | WilliamsonDistrict 9 | Culvert replacement across six lanes of traffic on IL 148, 1.1 miles north of IL 13 near the City of Energy (SN 100-7042). | — | Executed | Sierra Bravo Contractors, LLC $179,791 · | ||
| Mar 9, 2018 | 78629 | UnionDistrict 9 | Crack routing and sealing the centerline joint on IL 127, from the Jackson/Union county line to IL 146. | — | Executed | Huff Sealing Corporation $46,247 · | ||
| Mar 9, 2018 | 98820 | FranklinDistrict 9 | 2.5 miles of milling, resurfacing, culvert replacement, full depth HMA shoulders, earthwork, guardrails and tree removal on IL 37 from Wastena Street south of Benton to Yellow Banks Road. | — | Executed | E. T. Simonds Construction Company $2,770,067 · | ||
| Mar 9, 2018 | 99594 | UnionDistrict 9 | Replace the bridge carrying TR 17 over Cedar Creek, 1.4 miles northeast of Alto Pass. | — | Executed | Dees, Inc. $187,593 · | ||
| Mar 9, 2018 | 99595 | FranklinDistrict 9 | Resurfacing CJ10 from .5 mile west of Cemetary Road to IL 37, | — | Executed | E. T. Simonds Construction Company $375,421 · | ||
| Apr 27, 2018 | 78080 | HamiltonDistrict 9 | Removal and replacement of bridge SN 033-0024 carrying Blairsville Road over an unnamed stream just off IL 242, 3.46 miles north of McLeansboro. | — | Executed | Sierra Bravo Contractors, LLC $543,453 · | ||
| Apr 27, 2018 | 78166 | SalineDistrict 9 | Replacement of two single span bridges on IL 34, 0.5 mile west of Galatia and one mile east of Galatia (SN 083-0026 and 083-0027). | — | Executed | Sierra Bravo Contractors, LLC $2,313,470 · | ||
| Apr 27, 2018 | 78590 | SalineDistrict 9 | 16.3 miles of tree pruning along US 34 and US 45. | — | Rejected | Nettle Creek Nursery, Inc. $625,210 · | ||
| Apr 27, 2018 | 78626 | JacksonDistrict 9 | Replace traffic signal controllers at two locations; 1) IL 27 at IL 149; 2) IL 13/127 at IL 149. | — | Executed | Gerstner Electric, Inc. $31,624 · | ||
| Apr 27, 2018 | 78640 | JacksonDistrict 9 | 2.8 miles of 4' HMA safety shoulders, shoulder rumble strips, grading and seeding on IL 3 north of Grand Tower, from just north of Power Plant Road to just south of Gorham Road. | — | Executed | E. T. Simonds Construction Company $585,135 · | ||
| Apr 27, 2018 | 78642 | JacksonDistrict 9 | 4.4 miles of microsurfacing on IL 149 from US 51 in Desoto to the Williamson County line. | — | Executed | A. C. Pavement Striping Co. $383,525 · | ||
| Apr 27, 2018 | 99588 | WhiteDistrict 9 | Replace the bridge carrying TR 403 over an unnamed creek, located 4 miles southeast of Norris City. | — | Executed | Depew and Owen Builders, Inc. $242,388 · | ||
| Apr 27, 2018 | 99589 | PulaskiDistrict 9 | Resurfacing and aggregate shoulders on Perks Road from 2.4 miles east of Old US 51 to the Johnson County line. | — | Executed | E. T. Simonds Construction Company $720,400 · | ||
| Apr 27, 2018 | 99591 | JohnsonDistrict 9 | Resurfacing Tunnel Hill Road from Parrish Ridge Road to Larkins Creek Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $759,782 · | ||
| Apr 27, 2018 | 99592 | WhiteDistrict 9 | Replace the bridge carrying TR 267 over drainage ditch, 3.5 miles north of Emma. | — | Executed | Dees, Inc. $204,827 · | ||
| Apr 27, 2018 | 99596 | JacksonDistrict 9 | HMA shoulders with rumble strips on Elkville Road from IL Route 127 to the Elkville Village limits. | — | Executed | E. T. Simonds Construction Company $998,361 · | ||
| Apr 27, 2018 | 99598 | JeffersonDistrict 9 | Resurfacing on CH 9 from I-64 to IL Route 15. | — | Executed | Southern Illinois Asphalt Co., Inc. $737,929 · | ||
| Jun 15, 2018 | 46455 | VariousDistrict 9 | Repairing various widths of thermoplastic, preformed plastic, hot spray, urethane and polyurea pavement marking lines, letters and symbols and the removal of existing pavment markings on a work order basis throughuot District 9. | — | Executed | Varsity Striping & Construction Co. $615,730 · | ||
| Jun 15, 2018 | 78295 | JacksonDistrict 9 | Bridge replacements, bridge widening, pavement widening and a multi-use path on IL 13 from just east of Giant City Road to just west of Reed Station Road in Carbondale. (SN 039-0062, 0061, 0019, 7105, 0021) | — | Executed | E. T. Simonds Construction Company $11,957,202 · | ||
| Jun 15, 2018 | 78326 | JeffersonDistrict 9 | Replace SN 041-0093 carrying IL 37 over a creek north of Ina with a double 10'x 9' box culvert. | — | Executed | E. T. Simonds Construction Company $582,865 · | ||
| Jun 15, 2018 | 78390 | WhiteDistrict 9 | Remove and replace SN 097-7047 with a box culvert on IL 1 over an unnamed creek in Crossville. | — | Executed | E. T. Simonds Construction Company $528,542 · | ||
| Jun 15, 2018 | 78522 | UnionDistrict 9 | Replace 2, three span bridges with 2 three span integral abutment bridges on I-57 over Shake Rag Road near Dongola. | — | Executed | E. T. Simonds Construction Company $4,604,795 · | ||
| Jun 15, 2018 | 78572 | MassacDistrict 9 | Reconstructing ADA ramps along US 45 from Metropolis Street to Yasoda Street in Metropolis. | — | Executed | Samron Midwest Contracting, Inc. $149,614 · | ||
| Jun 15, 2018 | 78627 | JacksonDistrict 9 | Intersection improvement at IL 13 and Reed Station Road to include Pavement removal, aggregate base course, PCC pavment and shoulders, HMA pavement and shoulders, a multi-use path, storm sewers, lighting and traffic signals. | — | Executed | Samron Midwest Contracting, Inc. $1,267,852 · | ||
| Jun 15, 2018 | 78632 | VariousDistrict 9 | Replacement of outdated guardrail end sections throughout District 9. | — | Executed | Midwest Fence Corporation $1,092,258 · | ||
| Jun 15, 2018 | 78644 | JacksonWilliamsonDistrict 9 | Centerline crack routing and sealing on IL 13 from Lewis Lane to Greenbriar Road. | — | Executed | Huff Sealing Corporation $390,736 · | ||
| Jun 15, 2018 | 78648 | VariousDistrict 9 | Crack sealing in various counties throughout District 9. | — | Executed | Complete Asphalt Service Co. $212,544 · | ||
| Jun 15, 2018 | 78654 | VariousDistrict 9 | Repair and replace damaged guardrail, barrier terminals, impact attenuators, cable median barrier and fence on a work order basis throughout District 9. // ; | — | Executed | COLLINS & HERMANN, INC. $626,291 · | ||
| Jun 15, 2018 | 78655 | VariousDistrict 9 | Electrical repair and/or replacement at various locations throughout District 9 | — | Executed | F. W. Electric, Inc. $49,008 · | ||
| Jun 15, 2018 | 78668 | JeffersonDistrict 9 | 7.3 miles of excavation and grading shoulders, safety shoulders and rumble strips on IL 37 from the Marion County line to Oakton Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,299,802 · | ||
| Jun 15, 2018 | 78669 | MassacPulaskiDistrict 9 | HMA safety shoulders, rumble strips, grading and seeding on IL 169 from IL 37 to IL 169. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,390,900 · | ||
| Jun 15, 2018 | 78670 | FranklinMassacUnionDistrict 9 | Tree removal on I-57 southbound in Franklin County, at the I-57 northbound Trial of Tears Rest Area in Union County, and at the I-24 Fort Massac Rest Area in Massac County. | — | Executed | Endrizzi Contracting, Inc $81,184 · | ||
| Jun 15, 2018 | 99576 | SalineDistrict 9 | Replace the bridge carrying Garner Road over Brush Creek, 3.5 miles northeast of Eldorado. | — | Executed | Depew and Owen Builders, Inc. $214,888 · | ||
| Jun 15, 2018 | 99583 | HardinDistrict 9 | Replace the bridge carrying Basset School Road over Hosick Creek, 1.0 mile northeast of Elizabethtown. | — | Executed | Dees, Inc. $253,721 · | ||
| Jun 15, 2018 | 99597 | FranklinDistrict 9 | Resurfacing and crushed stone shoulders on FAS Route 874 (Logan Road) from IL 34 to IL 149. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,082,766 · | ||
| Jun 15, 2018 | 99599 | WilliamsonDistrict 9 | Resurfacing with HMA shoulders and pavment marking on FAS Route 903 (Corinth Road) from the Johnston City limits to Paulton Road. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,222,620 · | ||
| Jun 15, 2018 | 99604 | GallatinDistrict 9 | Replace the bridge carrying CH 11 over North Fork Cypress Creek, 4.3 miles North of IL 13. | — | Executed | Dees, Inc. $676,549 · | ||
| Aug 3, 2018 | 78634 | AlexanderDistrict 9 | Surface preparation and application of bridge deck concrete sealer at SN 002-0022 carrying I-57 over the Mississippi River. | — | Executed | E. T. Simonds Construction Company $23,649 · | ||
| Aug 3, 2018 | 78649 | PopeDistrict 9 | Excavation of slope failures and adding riprap at multiple locations: 1) Two locatins at the IL 145/IL 146 intersection; 2) four locations on IL 146 from 1 mile to 3 miles west of Galconda. | — | Executed | Roadworks, LLC $36,232 · | ||
| Aug 3, 2018 | 78657 | GallatinDistrict 9 | 2.2 miles of patching on IL 1 from just south of IL 13 to SN 030-0020. | — | Executed | G. M. Sipes Construction, Inc. $128,569 · | ||
| Aug 3, 2018 | 78661 | JeffersonSalineDistrict 9 | Remove box culverts 041-7056 on IL 37 and 083-7059 on IL 142 and replace with elliptical pipes. | — | Executed | Haier Plumbing and Heating, Inc. $191,911 · | ||
| Aug 3, 2018 | 78663 | AlexanderDistrict 9 | Approach and connector pavement replacement on SN 002-0023 and 002-0024 on I-57 at the Cairo interchange over IL 3, CNIC Railroad Outer Road and Levee Road. | — | Executed | E. T. Simonds Construction Company $775,259 · | ||
| Aug 3, 2018 | 78665 | JohnsonDistrict 9 | Weed spraying along I-24 and I-57 in Johnson County. | — | Executed | The Daltons Inc. $54,842 · | ||
| Aug 3, 2018 | 78666 | VariousDistrict 9 | Surface preparation and applicatin of bridge deck concrete sealer at various locations in Perry, Jackson and Jefferson County. | — | Executed | All States Painting, Inc. $95,200 · | ||
| Aug 3, 2018 | 99602 | WhiteDistrict 9 | Replace the bridge over unnamed creek, located one mile west of Epworth. | — | Executed | Dees, Inc. $171,534 · | ||
| Aug 3, 2018 | 99606 | HamiltonDistrict 9 | 20.5 miles of A-1 bituminous surface treatment on various routes in Hamilton County. | — | Rejected | Illini Asphalt Corporation $255,416 · | ||
| Sep 21, 2018 | 78615 | JohnsonDistrict 9 | Bridge repairs including joint reconstruction, overlay removal and replacement bearing removal and replacement, structural steel repairs and substructure repairs on SN 044-0035 carrying Tunnel Hill Road over I-24. | — | Executed | Sierra Bravo Contractors, LLC $297,796 · | ||
| Sep 21, 2018 | 78645 | JohnsonUnionWilliamsonDistrict 9 | Inserting culvert liners at 3 locations: 1) SN 100-7038, located 2 miles NW of I-57 near Neber Road on IL 148 in Williamson County; 2) SN 091-7089 located 0.3 miles north of exit 40 along I-57 in Johnson County; 3) SN 044-7073 located at MP 27.9 along I-57 SB in Union County. | — | Executed | Samron Midwest Contracting, Inc. $271,925 · | ||
| Sep 21, 2018 | 78679 | VariousDistrict 9 | Weed spraying on I-57 in Alexander, Pulaski and Union Counties. | — | Executed | Endrizzi Contracting, Inc $86,884 · | ||
| Sep 21, 2018 | 99609 | MassacDistrict 9 | Resurface Grand Chain Road from CH 4 North Junction to CH 4 South Junction. | — | Executed | E. T. Simonds Construction Company $335,394 · | ||
| Nov 9, 2018 | 78363 | FranklinWilliamsonDistrict 9 | Expand approximately 4.4 miles of I-57 to add an additional lane in each direction, install a median barrier, sresurface existing lanes, update pavement markings, upgrade guardrails, and install raised relectors and rumble strip. | — | Executed | E. T. Simonds Construction Company $14,359,766 · | ||
| Nov 9, 2018 | 78653 | JohnsonDistrict 9 | Milling, HMA resurfacing and Class A patching on I-24 from the Williamson County line to the Massac County line. | — | Executed | G. M. Sipes Construction, Inc. $258,833 · | ||
| Nov 9, 2018 | 78674 | JacksonDistrict 9 | Paved shoulder removal, HMA shoulders and excavation to repair the existing slope on US 51 just north of the Big Muddy River bridge south of DeSoto. | — | Executed | E. T. Simonds Construction Company $135,433 · | ||
| Nov 9, 2018 | 78696 | VariousDistrict 9 | Tree removal at various locations: 1) SB I-57 from MP 76 to MP 73 in Franklin County; 2) SB I-57 Rend Lake Rest Area in Franklin County; 3) EB and WB I-64 Goshen Road Rest Area in Jefferson County; 4) I-64 Skeeter Mountain Rest Area in White County. | — | Executed | Homer Tree Service, Inc. $103,765 · | ||
| Nov 9, 2018 | 78697 | UnionDistrict 9 | Remove and replace damaged PCC pavement in the passing lane and inside PCC shoulder on southbound I-57 near mile-marker 33. | — | Executed | E. T. Simonds Construction Company $59,949 · | ||
| Jan 18, 2019 | 78455 | JeffersonDistrict 9 | Removal and replacement SN 041-055 carrying CH 42 over I-57 at Ina. | — | Executed | Sierra Bravo Contractors, LLC $2,683,572 · | ||
| Jan 18, 2019 | 78502 | MassacDistrict 9 | Removal and replacement of the existing structures (SN 064-0024 and SN 064-0028) carrying I-24 over CH13 (Country Club Road) near Metropolis. | — | Executed | E. T. Simonds Construction Company $4,921,275 · | ||
| Jan 18, 2019 | 78596 | UnionDistrict 9 | 1.3 miles of patching, resurfacing and sidewalk ramps along IL 146 in Anna. | — | Executed | E. T. Simonds Construction Company $1,235,395 · | ||
| Jan 18, 2019 | 78617 | UnionDistrict 9 | Scour repair below SN 091-0068 carrying IL 127 over Clear Creek south of Alto Pass. | — | Executed | Pinoy Construction Inc. $47,537 · | ||
| Jan 18, 2019 | 78630 | WhiteDistrict 9 | Inlaying 1.5" HMA, deck repairs, joint replacement and bearing replacement on SN 097-000 and 097-0004 carrying I-64 over the Wabash River into Indiana. | — | Executed | E. T. Simonds Construction Company $763,012 · | ||
| Jan 18, 2019 | 78650 | VariousDistrict 9 | Steel, bearing and joint repairs on 11 structures in Alexander, Hamilton and Jefferson Counties. (SN 041-0007, 0087, 0088, 0077, 0078, 002-0032, 033-0038, 0041-0041, 0042, 0097) | — | Executed | Sangamo Construction Company $1,642,481 · | ||
| Jan 18, 2019 | 78658 | FranklinDistrict 9 | 0.66 miles of HMA partial depth patching over existing PCC pavement on IL 149 from Ken Grey Boulevard to Joiner Street | — | Executed | E. T. Simonds Construction Company $134,883 · | ||
| Jan 18, 2019 | 78659 | FranklinDistrict 9 | 5.6 miles of replacing aggregate shoulder with a 2' safety shoulder consisting of 8" HMA on IL 14 from Mt. Zion Road to Ewing Road. | — | Executed | E. T. Simonds Construction Company $534,970 · | ||
| Jan 18, 2019 | 78667 | WilliamsonDistrict 9 | Bridge repairs and approach work on SN 100-0062 carrying Cambria Rd. over Big Muddy River, 1 mile south of Hurst. | — | Executed | E. T. Simonds Construction Company $299,154 · | ||
| Jan 18, 2019 | 78677 | VariousDistrict 9 | Cleaning and painting portions of 14 structures: 1 in Alexander County, 2 in Franklin County, 1 in Hamilton County, 8 in Jefferson County, 1 in Massac County, and 2 in White County. (SN 041-0039, 0040, 0041, 0042, 0077, 0078, 0087, 0088, 002-0032, 028-0038, 0041, 033-0012, 064-0003, 097-0024) | — | Executed | Venus Painting Co. $1,130,680 · | ||
| Jan 18, 2019 | 78693 | UnionDistrict 9 | 2.4 miles of milling and resurfacing of I-57 southbound from 0.5 miles south of IL 146 to 0.5 miles north of the rest area near the Cache River. | — | Executed | Southern Illinois Asphalt Co., Inc. $1,121,786 · | ||
| Jan 18, 2019 | 99584 | UnionDistrict 9 | Replace the bridge carrying TR 203 (Nash Road) over Big Creek, located 3 miles southeast of Anna. | — | Executed | Samron Midwest Contracting, Inc. $254,345 · | ||
| Jan 18, 2019 | 99610 | WilliamsonDistrict 9 | Pavement widening, resurfacing, and water main improvements on East Grand Avenue, from Hofer Road to Hurricane Road in Crainville. | — | Executed | Samron Midwest Contracting, Inc. $872,797 · | ||
| Mar 8, 2019 | 78454 | PulaskiDistrict 9 | Removal and replacement of SN 077-0026 carrying County Highway 7 over I-57 at the Ullin interchange. | — | Executed | E. T. Simonds Construction Company $2,880,705 · | ||
| Mar 8, 2019 | 78618 | PerryDistrict 9 | Removal and replacement of double barrel 7'x 7' box culvert SN 073-7074 on IL 13 in Perry. | — | Executed | Stutz Excavating, Inc. $196,764 · | ||
| Mar 8, 2019 | 78637 | WilliamsonDistrict 9 | Installation of sidewalks, ADA improvements and installation of pedestrian crossing signals on IL 13 from Johnson Street to Railroad Street in Marion. | — | Executed | Samron Midwest Contracting, Inc. $158,480 · | ||
| Mar 8, 2019 | 78646 | PerryDistrict 9 | Bearm end repairs and joint replacement on SN 073-0033 carrying US 51 over ICG Railroad. | — | Executed | Samron Midwest Contracting, Inc. $218,060 · | ||
| Mar 8, 2019 | 78662 | WilliamsonDistrict 9 | Joint reconstruction, approach slab and deck slab repairs, waterproofing membrane system, HMA overlays and substructure repairs on SN 100-0032 and SN 100-0033 carrying IL 148 over the Big Muddy River and Pond Creek | — | Executed | Samron Midwest Contracting, Inc. $497,797 · | ||
| Mar 8, 2019 | 99605 | PerryDistrict 9 | Replace the Bridge carrying Pyatt-Cutles Road over Little Galum Creek, 4 miles west of IL 13. | — | Executed | Samron Midwest Contracting, Inc. $312,228 · | ||
| Mar 8, 2019 | 99608 | JacksonDistrict 9 | Place embankment along the proposed horizontal and vertical alignment and resurfacing from 1.5 miles west of Reed Station Road to 0.2 mile Westerly. | — | Executed | E. T. Simonds Construction Company $721,679 · | ||
| Mar 8, 2019 | 99611 | UnionDistrict 9 | Replace the bridge carrying TR 116 over Dutch Creek, 1.2 miles southwest of Jonesboro. | — | Executed | Dees, Inc. $180,759 · | ||
| Mar 8, 2019 | 99614 | JeffersonDistrict 9 | Resurfacing Log Cabin Lane from East Adams to Road to East Ina Road. | — | Executed | E. T. Simonds Construction Company $465,785 · | ||
| Apr 26, 2019 | 78029 | JohnsonDistrict 9 | Replacement of SN 044-0004 carrying US 45 over Little Cache Creek, just south of IL 146. | — | Executed | Sierra Bravo Contractors, LLC $1,748,326 · | ||
| Apr 26, 2019 | 78461 | JeffersonDistrict 9 | Replacement of 2 structures on 1-57 over Atchison Creek, 2 miles north of Ina (SN 041-0001 and 041-0002) | — | Executed | The Kilian Corporation $7,123,315 · | ||
| Apr 26, 2019 | 78690 | WhiteDistrict 9 | Removing the four way flashing beacon installation suspended by spanwire at the intersection of IL 14 and US 45 and replacing it with a new four way flashing beacon suspended by mast arm. | — | Executed | F. W. Electric, Inc. $36,411 · |
1–100 of 973Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.