| Jan 19, 2018 | 78544 | JacksonDistrict 9 | Removal of two structures (SN 039-0015, SN 039-0051) over abandoned Illinois Central Golf railroad and construction of a 12' X 10' box culvert and bike path, 3 miles west of Carbondale. | — | Executed | E. T. Simonds Construction Company $1,927,198 · | ||
| Jan 19, 2018 | 99593 | JacksonDistrict 9 | Resurfacing on FAS 919 (Grant City Road) from Vercliff Drive to Boskydell Road. | — | Executed | E. T. Simonds Construction Company $564,376 · | ||
| Apr 27, 2018 | 78626 | JacksonDistrict 9 | Replace traffic signal controllers at two locations; 1) IL 27 at IL 149; 2) IL 13/127 at IL 149. | — | Executed | Gerstner Electric, Inc. $31,624 · | ||
| Apr 27, 2018 | 78640 | JacksonDistrict 9 | 2.8 miles of 4' HMA safety shoulders, shoulder rumble strips, grading and seeding on IL 3 north of Grand Tower, from just north of Power Plant Road to just south of Gorham Road. | — | Executed | E. T. Simonds Construction Company $585,135 · | ||
| Apr 27, 2018 | 78642 | JacksonDistrict 9 | 4.4 miles of microsurfacing on IL 149 from US 51 in Desoto to the Williamson County line. | — | Executed | A. C. Pavement Striping Co. $383,525 · | ||
| Apr 27, 2018 | 99596 | JacksonDistrict 9 | HMA shoulders with rumble strips on Elkville Road from IL Route 127 to the Elkville Village limits. | — | Executed | E. T. Simonds Construction Company $998,361 · | ||
| Jun 15, 2018 | 78295 | JacksonDistrict 9 | Bridge replacements, bridge widening, pavement widening and a multi-use path on IL 13 from just east of Giant City Road to just west of Reed Station Road in Carbondale. (SN 039-0062, 0061, 0019, 7105, 0021) | — | Executed | E. T. Simonds Construction Company $11,957,202 · | ||
| Jun 15, 2018 | 78627 | JacksonDistrict 9 | Intersection improvement at IL 13 and Reed Station Road to include Pavement removal, aggregate base course, PCC pavment and shoulders, HMA pavement and shoulders, a multi-use path, storm sewers, lighting and traffic signals. | — | Executed | Samron Midwest Contracting, Inc. $1,267,852 · | ||
| Jun 15, 2018 | 78644 | JacksonWilliamsonDistrict 9 | Centerline crack routing and sealing on IL 13 from Lewis Lane to Greenbriar Road. | — | Executed | Huff Sealing Corporation $390,736 · | ||
| Nov 9, 2018 | 78674 | JacksonDistrict 9 | Paved shoulder removal, HMA shoulders and excavation to repair the existing slope on US 51 just north of the Big Muddy River bridge south of DeSoto. | — | Executed | E. T. Simonds Construction Company $135,433 · | ||
| Mar 8, 2019 | 99608 | JacksonDistrict 9 | Place embankment along the proposed horizontal and vertical alignment and resurfacing from 1.5 miles west of Reed Station Road to 0.2 mile Westerly. | — | Executed | E. T. Simonds Construction Company $721,679 · | ||
| Apr 26, 2019 | 78702 | JacksonDistrict 9 | 1.9 miles of milling and resurfacing on US 51 from Old US 51 South Connector to Old Us 51 North connector, south of Carbondale. | — | Executed | E. T. Simonds Construction Company $682,787 · | ||
| Apr 26, 2019 | 99616 | JacksonDistrict 9 | Resurfacing Ava Road from IL 4 to South of Francis Lane. | — | Executed | E. T. Simonds Construction Company $1,545,387 · | ||
| Jun 14, 2019 | 78635 | JacksonDistrict 9 | Box culvert replacement (SN 039-7061) carrying US 51 over an unnamed creek, adjacent to the Elkville Resevoir, 0.9 mile south of Hallidayboro Road, south of Elkville. | — | Executed | Sierra Bravo Contractors, LLC $191,403 · | ||
| Jun 14, 2019 | 78695 | JacksonDistrict 9 | INSTALLING CONDUIT, FIBER OPTIC CABLE, CONTROLLER AND NETWORK EQUIPMENT ON IL 13 FROM STRIEGEL ROAD TO REED STATION ROAD IN CARBONDALE. | — | Executed | Gerstner Electric, Inc. $1,216,698 · | ||
| Jun 14, 2019 | 78713 | JacksonDistrict 9 | 1.5 MILES OF PATCHING AND PAVEMENT MARKINGS ON EASTBOUND IL 13 FROM UNIVERSITY AVENUE TO MCKINNEY AVENUE IN CARBONDALE. | — | Executed | E. T. Simonds Construction Company $271,810 · | ||
| Jul 12, 2019 | 78565 | JacksonDistrict 9 | Resurfacing on Old US 51 between the intersections of US 51 and Old US 51, including the Old US 51 spur. | — | Executed | E. T. Simonds Construction Company $1,233,412 · | ||
| Jul 12, 2019 | 78673 | JacksonDistrict 9 | 1.6 miles of resurfacing on US 51 in Jackson County. | — | Executed | E. T. Simonds Construction Company $1,083,656 · | ||
| Jul 12, 2019 | 78705 | JacksonDistrict 9 | 7.9 miles of resurfacing and ADA improvements on IL 13/127 from Finny Road, north of Murphysboro, to the Perry County line. | — | Executed | E. T. Simonds Construction Company $3,190,741 · | ||
| Sep 20, 2019 | 99630 | JacksonDistrict 9 | Reconstruction of Oakland Avenue from West Walnut Street to Chautauqua Street in the City of Carbondale. | — | Executed | E. T. Simonds Construction Company $1,772,157 · | ||
| Jan 17, 2020 | 78551 | JacksonDistrict 9 | 1.5 miles of patching, surface removal, resurfacing, shoulders, pavement markings and raised reflective pavement markers on Gorham Spur Road from Lake Street to IL 3. | — | Executed | Samron Midwest Contracting, Inc. $537,659 · | ||
| Mar 6, 2020 | 78750 | JacksonDistrict 9 | 2.8 miles of milling, resurfacing, patching and ADA sidewalk improvments on IL 13 eastbound from Oakland Avenue to Lewis Lane. | — | Executed | Samron Midwest Contracting, Inc. $1,564,830 · | ||
| Mar 6, 2020 | 78752 | JacksonDistrict 9 | 5,260 feet of patching, resurfacing and sidewalk ramps along IL 149 in Murphysboro. | — | Executed | E. T. Simonds Construction Company $1,219,324 · | ||
| Mar 6, 2020 | 99625 | JacksonDistrict 9 | Resurfacing Giant City Road from Grassy Road to South Church Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $448,589 · | ||
| Apr 24, 2020 | 78767 | JacksonDistrict 9 | Installation of radar detection at the intersection of IL 149 / IL 127 and 5th Street in Murphysboro. | — | Executed | Brown Electric, Inc. $34,294 · | ||
| Apr 24, 2020 | 78781 | JacksonDistrict 9 | 75 feet of paved shoulder removal, HMA shoulders, permanent sheet piling and earth excavation to repair the existing slope on US 51 just north of the Big Muddy River Bridge (SN 039-0065). | — | Executed | E. T. Simonds Construction Company $90,396 · | ||
| Apr 24, 2020 | 99640 | JacksonDistrict 9 | Construction of ADA Ramps on IL 149 from 21st Street to 22nd Street in Murphysboro | — | Executed | Samron Midwest Contracting, Inc. $82,333 · | ||
| Jun 12, 2020 | 78709 | JacksonDistrict 9 | Intersection improvements, pavement widening, HMA resurfacing and a multi-use path on IL 13 from just east of Veterans Parkway to the Williamson County line. | — | Executed | E. T. Simonds Construction Company $4,691,711 · | ||
| Jul 31, 2020 | 78783 | JacksonDistrict 9 | 4 miles of patching, milling, HMA binder and surfacing, HMA shoulders and spot drainage improvements on Old IL 13 from just west of Tower Road in Carbondale to just east of IL 127 in Murphysboro. | — | Executed | E. T. Simonds Construction Company $1,137,153 · | ||
| Jul 31, 2020 | 78784 | JacksonDistrict 9 | 0.52 miles of resurfacing and patching on IL 13 westbound in Carbondale, sidewalk ramp update at Lewis Lane and the addition of a new bike lane. | — | Executed | Samron Midwest Contracting, Inc. $443,394 · | ||
| Jul 31, 2020 | 99639 | JacksonDistrict 9 | Reconstruct the intersection of Chautaugua Street at McLafferty Road/Briarwood Drive in Carbondale to a roundabout with multi-use path and pavement markings. | — | Executed | Samron Midwest Contracting, Inc. $736,354 · | ||
| Nov 6, 2020 | 78547 | JacksonDistrict 9 | Complete replacement of SN 039-0046 on Bluegrass Lane (off IL 151 south of Ava) over Spring Creek. | — | Executed | Samron Midwest Contracting, Inc. $393,333 · | ||
| Nov 6, 2020 | 78780 | JacksonDistrict 9 | 4.2 miles of resurfacing, excavating and patching on US 51 from US 51 south of Carbondale to west of Makanda. | — | Executed | E. T. Simonds Construction Company $1,224,873 · | ||
| Nov 6, 2020 | 78806 | JacksonDistrict 9 | Pavement patching at the intersection of IL 13 and Watson Road. | — | Executed | Kinney Contractors, Inc. $118,436 · | ||
| Nov 6, 2020 | 78816 | JacksonPerryDistrict 9 | Parapet repairs on SN 039-0069 on Old IL 13 over Mud Creek, 2 miles east of IL 127 and on SN 073-0033 on US 51 over ICG Railroad in DuQuoin. | — | Executed | Samron Midwest Contracting, Inc. $196,810 · | ||
| Mar 5, 2021 | 99651 | JacksonDistrict 9 | Resurfacing and pavement markings on Brick Plant Road, from Randolph County line to IL 4. | — | Executed | E. T. Simonds Construction Company $570,281 · | ||
| Apr 23, 2021 | 78820 | JacksonDistrict 9 | 3.7 miles of patching, surface removal, surfacing and ADA ramp improvements on 14th and 11th Streets in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $1,216,661 · | ||
| Apr 23, 2021 | 78851 | JacksonDistrict 9 | Pavement patching on North 6th Street from IL 13/127 to Lucier Street in Murphysboro. | — | Executed | E. T. Simonds Construction Company $117,195 · | ||
| Apr 23, 2021 | 78853 | JacksonDistrict 9 | Pavement patching at the intersection of IL 13 and Streigel Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $153,128 · | ||
| Jun 11, 2021 | 78612 | JacksonDistrict 9 | Removal and reconstruction of concrete pavement, ADA ramp improvements and minor signal modifications on IL 149/127 at the intersections of IL 149 (Walnut Street) and IL 127 (5th Street). | — | Executed | E. T. Simonds Construction Company $538,623 · | ||
| Jun 11, 2021 | 78660 | JacksonDistrict 9 | Conversion of 2 intersections to Restricted Crossing U-Turn intersections: 1) IL 13/127 and Ava Road; 2) IL 13/127 and Grange Hall Road. | — | Executed | Samron Midwest Contracting, Inc. $5,732,354 · | ||
| Jun 11, 2021 | 99650 | JacksonDistrict 9 | Pavement removal, construction of 8" PCC pavement, curb and gutter, sidewalks, storm sewer, water main and sewer relocation, and pavement markings on North 7th Street from 0.4 mile south of Industrial Park Road to Bost Lane in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $2,641,236 · | ||
| Jul 30, 2021 | 78838 | JacksonPerryDistrict 9 | 17.8 miles of pavement patching, HMA surface removal, HMA surfacing, HMA shoulders and ADA sidewalk improvements on US 51 from near Industrial Park Road in Carbondale to Grant Way in Du Quoin. | — | Executed | E. T. Simonds Construction Company $8,586,162 · | ||
| Jul 30, 2021 | 78865 | JacksonDistrict 9 | 6.2 miles of HMA surface removal, resurfacing of the mainline and shoulders and ADA upgrades on IL 149 from IL 13/127 in Murphysboro to US 51 in Desoto. | — | Executed | Samron Midwest Contracting, Inc. $1,641,027 · | ||
| Sep 17, 2021 | 78864 | JacksonDistrict 9 | 19.3 miles of patching, HMA surface removal, HMA resurfacing and HMA safety shoulders on IL 3 and IL 149. | — | Executed | Samron Midwest Contracting, Inc. $4,252,377 · | ||
| Jan 21, 2022 | 78595 | JacksonDistrict 9 | Removing a single span bridge on US 51 in Elkville with a 12x7 cast-in-place concrete box culvert. (SN 039-0002) | — | Executed | E. T. Simonds Construction Company $816,039 · | ||
| Jan 21, 2022 | 78888 | JacksonDistrict 9 | 6 miles of resurfacing on IL 13 from Orchard Drive in Carbondale to Old IL 13 and eastbound lanes only on IL 13 from Old IL 13 to the Big Muddy Bridge in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $2,363,108 · | ||
| Mar 11, 2022 | 78891 | JacksonDistrict 9 | Patching on at various locations on US 51 and IL 13 in Jackson County. | — | Executed | E. T. Simonds Construction Company $220,721 · | ||
| Mar 11, 2022 | 99674 | JacksonDistrict 9 | Resurfacing, HMA shoulders, pavement markings, and raised reflective markers on Elkville Road from IL 127 to Haulage Road. | — | Executed | Samron Midwest Contracting, Inc. $575,575 · | ||
| Apr 29, 2022 | 78880 | JacksonDistrict 9 | Signal modifications and ADA accommodations at the intersection of IL 13 and Giant City Road. | — | Executed | Brown Electric, Inc. $287,973 · | ||
| Apr 29, 2022 | 78914 | JacksonWilliamsonDistrict 9 | 2.4 miles of HMA surface removal, resurfacing and patching on Old IL 13 from Giant City Road to Spillway Road. | — | Executed | E. T. Simonds Construction Company $753,253 · | ||
| Apr 29, 2022 | 78925 | JacksonDistrict 9 | 1 mile of patching and resurfacing on IL 13 in Carbondale. | — | Executed | E. T. Simonds Construction Company $1,364,664 · | ||
| Apr 29, 2022 | 78938 | JacksonDistrict 9 | 1.9 miles of resurfacing on IL 13/127 from AVA Road to IL 149 in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $898,898 · | ||
| Jun 17, 2022 | 78874 | JacksonUnionDistrict 9 | 12.4 miles of HMA resurfacing, patching, ADA improvements and ditch re-grading on Old US 51 from Makanda to Anna. | — | Executed | E. T. Simonds Construction Company $6,063,846 · | ||
| Jun 17, 2022 | 78879 | JacksonWilliamsonDistrict 9 | Signal modifications and fiber optic installation on IL 13 from Reed Station Road in Carbondale to Fair Street in Marion and on I-57 from IL 13 to the DMS sign approximately 3 miles north. | — | Executed | Gerstner Electric, Inc. $3,725,432 · | ||
| Jun 17, 2022 | 99632 | JacksonDistrict 9 | Construction of 5,700 feet of PCC sidewalk, pipe culverts, abutment construction, and a pedestrian truss superstructure along an abandoned rail line from New Era Road to Oakland Avenue in Carbondale. | — | Executed | Samron Midwest Contracting, Inc. $1,034,513 · | ||
| Jun 17, 2022 | 99689 | JacksonDistrict 9 | Reconstruction of New Era Road from Glenn Road to Airport Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $1,176,665 · | ||
| Aug 5, 2022 | 78700 | JacksonDistrict 9 | Resurfacing, patching, sidewalks and ADA upgrades at the District 9 headquarters parking lot. | — | Executed | E. T. Simonds Construction Company $302,610 · | ||
| Aug 5, 2022 | 78913 | JacksonDistrict 9 | Bridge joint reconstruction, strip seals, bridge deck scarification and bridge deck microsilica concrete overlay on SN 039-0056 on IL 149 over Kinkaid Creek, 0.9 miles east of IL 3. | — | Executed | E. T. Simonds Construction Company $492,697 · | ||
| Aug 5, 2022 | 99675 | JacksonDistrict 9 | Hot-Mix Asphalt Surface Removal and Resurfacing with HMA shoulders on Elkville Road from Haulage Road in Elkville to US 51. | — | Executed | Samron Midwest Contracting, Inc. $697,697 · | ||
| Nov 18, 2022 | 78372 | JacksonWilliamsonDistrict 9 | Intersection improvements, pavement widening, HMA resurfacing and a multi-use path on IL 13 from the Williamson County line to east of Spillway Road. | — | Executed | E. T. Simonds Construction Company $6,023,216 · | ||
| Mar 10, 2023 | 78905 | JacksonPerryDistrict 9 | Intersection widening and resurfacing at 3 locations: IL 154 at Water Street in Pinckneyville, IL 127/149 at North 4th Street in Murphysboro and IL 13/127/149 at North Street in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $373,373 · | ||
| Apr 28, 2023 | 46925 | JacksonDistrict 9 | Bituminous surface treatment on existing roads and parking lots in Burning Star State Fish and Wildlife Area. | — | Executed | DMS Contracting, Inc. $1,851,558 · | ||
| Apr 28, 2023 | 78939 | JacksonJohnsonDistrict 9 | Bridge deck overlay on SN 044-0012 carrying IL 37 over an abandoned railroad, 0.2 miles south of Cypress and bridge deck overlay on SN 039-0057 carrying IL 149 over Little Muddy River, 2 miles east of Desoto. | — | Executed | E. T. Simonds Construction Company $866,504 · | ||
| Jun 16, 2023 | 78790 | JacksonDistrict 9 | Replacement of 3 culverts on IL 3: SN 039-2013(E) over a stream 1.8 miles east of the Randolph County line; SN 039-2014(E) over a drainage ditch 0.1 miles southeast of Raddle Road; SN 039-2015(E) over Talbott Hollow Creek 1.1 miles northwest of IL 151. | — | Executed | E. T. Simonds Construction Company $2,188,576 · | ||
| Jun 16, 2023 | 99683 | JacksonDistrict 9 | Construct an offset right turn lane and install traffic signal equipment at the intersection of Giant City Road and East Pleasant Hill Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $733,609 · | ||
| Aug 4, 2023 | 78A11 | JacksonDistrict 9 | Installation of median crossovers for the eastbound lanes of IL 13 at SN 039-0075 carrying IL 13 over the Big Muddy River, east of Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $151,672 · | ||
| Sep 22, 2023 | 99709 | JacksonDistrict 9 | HMA resurfacing and shoulders on Royalton Road from US 51 to the Franklin County Line. | — | Executed | Samron Midwest Contracting, Inc. $1,048,899 · | ||
| Nov 17, 2023 | 78929 | JacksonDistrict 9 | 0.75 miles of resurfacing on North 6th Street in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $339,339 · | ||
| Nov 17, 2023 | 78A02 | AlexanderJacksonUnionDistrict 9 | 25.4 miles of patching, milling, resurfacing and shoulders on IL 3 from Howardton Road, near Grand Tower, to the Cape T intersection. | — | Executed | E. T. Simonds Construction Company $11,663,246 · | ||
| Nov 17, 2023 | 99711 | JacksonDistrict 9 | Resurfacing North Marion Street from East Fischer Street to Dillinger Road. | — | Executed | E. T. Simonds Construction Company $658,507 · | ||
| Nov 17, 2023 | 99713 | JacksonDistrict 9 | Replace existing structure with a precast concrete box culvert with pre-cast box culvert end sections, PCC pavement, sidewalk, curb and gutter, on East College Street over Piles Fork Creek in Carbondale. | — | Executed | E. T. Simonds Construction Company $553,288 · | ||
| Apr 26, 2024 | 78825 | JacksonDistrict 9 | Slope stabilization and resurfacing on IL 127 approximately 0.5 miles south of Tomcat Hill Lane, south of Murphysboro. | — | Executed | Sierra Bravo Contractors, LLC $508,955 · | ||
| Apr 26, 2024 | 78A21 | JacksonPerryDistrict 9 | 10.9 miles of HMA surface removal, resurfacing, HMA shoulders, patching, rumble strips and guardrail improvements on IL 4 from IL 150 to Keller Street, west of the Ava. | — | Executed | E. T. Simonds Construction Company $5,862,388 · | ||
| Apr 26, 2024 | 78A36 | JacksonDistrict 9 | 0.94 miles of patching on IL 149 from Grimsby Road to 1 mile east of the truck climbing lane near Kinkaid Creek in Murphysboro. | — | Executed | E. T. Simonds Construction Company $131,011 · | ||
| Apr 26, 2024 | 78A60 | JacksonDistrict 9 | Traffic signal detection at 2 intersection: 1) IL 13 at New Era; 2) IL 13 at Sycamore/Emerald. | — | Executed | Gerstner Electric, Inc. $319,167 · | ||
| Apr 26, 2024 | 99717 | JacksonDistrict 9 | PCC shared-use path with drainage improvements, signage and ADA ramps along IL 13 from West Murphysboro Road to Wood Road in Carbondale. | — | Executed | Samron Midwest Contracting, Inc. $2,139,256 · | ||
| Jun 14, 2024 | 78A55 | JacksonDistrict 9 | Replacing the joints at each end of SN 039-0074 carrying IL 4 over Beaucup Creek, 0.5 miles west of IL 13/127. | — | Executed | Samron Midwest Contracting, Inc. $269,269 · | ||
| Sep 20, 2024 | 78A66 | JacksonDistrict 9 | 2.3 miles of milling and resurfacing on Makanda Road from US 51 to the Giant City State Park entrance. | — | Executed | E. T. Simonds Construction Company $940,374 · | ||
| Nov 8, 2024 | 78A16 | JacksonDistrict 9 | Offset left turn lanes and signal modifications to flashing yellow arrows on IL 13 at Williams Street, just east of Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $1,745,537 · | ||
| Jan 17, 2025 | 78998 | JacksonDistrict 9 | 16.5 miles of fiber optic cable installation and signal modification on IL 13 in Carbondale from Striegel Road west to IL 127/149 and on IL13/127/149 in Murphysboro from IL 13/127/149 north to Industrial Park Road. | — | Executed | Gerstner Electric, Inc. $1,954,250 · | ||
| Jan 17, 2025 | 78A59 | JacksonDistrict 9 | 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. , 350' of storm sewer pipe replacement and channel excavation on IL 127 south of the MO Pacific Railroad and north of Industrial Park Road in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $241,275 · | ||
| Apr 25, 2025 | 99727 | JacksonDistrict 9 | HMA resurfacing on South Wall Street from East park Street to East Main Street in Carbondale. Includes; ADA improvements and Storm Sewers. | — | Executed | Samron Midwest Contracting, Inc. $1,596,208 · | ||
| Jun 13, 2025 | 78985 | JacksonDistrict 9 | Slope repair on SN 039-0075 carrying IL 13 over the Big Muddy River, east of IL 127 in Murphysboro. | — | Executed | Samron Midwest Contracting, Inc. $11,674,263 · | ||
| Jun 13, 2025 | 78A78 | JacksonUnionDistrict 9 | Joint reconstruction with strip seal and modular seal on SN 039-0048 carrying IL3 over a railroad in Jackson County and joint reconstruction with strip seals on SN 091-0031carrying IL3 over the Big Muddy River in Union County. | — | Executed | E. T. Simonds Construction Company $968,450 · | ||
| Jun 13, 2025 | 78A97 | JacksonDistrict 9 | Aggregate shoulders, earth and furnished excavation, stone riprap, pipe underdrains and erosion control blanket to repair existing slopes along IL 149 at SN 039-7036, 0.4 miles west of the Williamson County line west of Hurst. | — | Executed | Sierra Bravo Contractors, LLC $170,723 · | ||
| Jun 13, 2025 | 78B03 | JacksonDistrict 9 | Replacing 615' of pavement and shoulders on westbound IL 13 at Watson Road. | — | Executed | Samron Midwest Contracting, Inc. $1,041,511 · | ||
| Jun 13, 2025 | 78B04 | JacksonDistrict 9 | Patching on US 51 in Carbondale from Willow Street to Grand Avenue and on Mill Street from South Normal Avenue to South Illinois Avenue. | — | Executed | E. T. Simonds Construction Company $543,043 · | ||
| Jun 13, 2025 | 78B05 | JacksonDistrict 9 | Signal grounding at multiple locations on IL 149 and IL 13 in Murphysboro and Carbondale. | — | Executed | Gerstner Electric, Inc. $116,085 · | ||
| Jun 13, 2025 | 78B22 | JacksonDistrict 9 | 0.85 miles of overlay and pavement patching on Airport Road from IL 13 to 1 mile north of IL 13, northwest of Carbondale. | — | Executed | E. T. Simonds Construction Company $297,405 · | ||
| Nov 7, 2025 | 78B54 | JacksonDistrict 9 | Resurfacing Sweets Drive from Reed Station Road to 0.5 miles west of Reed Station Road in Carbondale. | — | Executed | E. T. Simonds Construction Company $175,469 · | ||
| Jan 16, 2026 | 78937 | JacksonDistrict 9 | Replacement of SN 039-0052 carrying US 51 over CN, IC Railroad, approximately 2.6 miles north of Desoto. | — | Executed | E. T. Simonds Construction Company $4,810,447 · | ||
| Jan 16, 2026 | 99718 | JacksonDistrict 9 | HMA resurfacing and widening of W. Pleasant Hill Road from Union Hill Road to McLaufferty Road in Carbondale. Includes; HMA Shoulders, PCC driveways, and culverts. | — | Executed | Samron Midwest Contracting, Inc. $1,171,867 · | ||
| Jan 16, 2026 | 99763 | JacksonDistrict 9 | Construction of PCC multi-use trail from E. Grand Street to Lewis Lane in Carbondale. Includes; ADS Ramps, light pole relocation, and storm sewers. | — | Executed | Samron Midwest Contracting, Inc. $1,263,057 · | ||
| Feb 27, 2026 | 78967 | JacksonDistrict 9 | Replacement of SN 039-0026 carrying IL 3 over Worthen Bayou, 1.2 miles south of IL 149. | — | Executed | E. T. Simonds Construction Company $3,594,116 · | ||
| Feb 27, 2026 | 78B00 | JacksonDistrict 9 | Signal modifications on IL 13 in Carbondale from Glenview Drive to McKinney Avenue. | — | Executed | Gerstner Electric, Inc. $2,170,000 · | ||
| Feb 27, 2026 | 78B38 | JacksonDistrict 9 | Bridge deck overlay s at 3 locations: 1) US 51 over Little Crab Orchard Creek, 2 miles north of Carbondale; 2) US 51 over Big Muddy River, 1.8 miles south of DeSoto; 3) IL 149 over Beaucoup Creek, 3.3 miles west of DeSoto. (SN 039-0063, 039-0064, 039-0065). | — | Executed | Samron Midwest Contracting, Inc. $1,494,455 · | ||
| Feb 27, 2026 | 78B91 | JacksonUnionDistrict 9 | Traffic signal modernization at 2 intersections: IL 13 and Reed Station Road; IL 146 and US 51. | — | Executed | F. W. Electric, Inc. $404,654 · | ||
| Jul 31, 2026 | 78C18 | JacksonWilliamsonDistrict 9 | 9.1 miles of tree planting along the Crab Orchard Greenway multi-use path and the Wolf Creek Interchange. | — | Executed | CSD Environmental Services, Inc. $241,350 · | ||
| Sep 18, 2026 | 78B55 | JacksonDistrict 9 | This project has 5 locations. Location 1: Resurfacing and ADA upgrades on Old 13 (Murphysboro Road) from Tower Road to New IL 13 in Carbondale; Location 2: Resurfacing and ADA upgrades on IL 127 / Old 13 from Old Brick Road to the Big Muddy River Bridge; Location 3: Pavement replacement on IL 127 / Old IL 13 from the Big Muddy River Bridge to Shomaker Drive in Murphysboro; Location 4: Pavement replacement at the intersection of IL 127 / Old IL 13 and Shomaker Shomaker Drive in Murphysboro; Locat | — | Executed | Samron Midwest Contracting, Inc. $2,308,150 · |
1–100 of 101Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.