| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 74723 | EffinghamDistrict 7 | 0.88 mile of roadway reconstruction on US 45 from West Salt Creek to 0.2 mile south of 500N. | — | Executed | Howell Paving, Inc. $3,170,914 · | ||
| Jan 19, 2018 | 74789 | EffinghamDistrict 7 | PCC removal and replacement, curb and gutter removal and replacement, sidewalk removal and replacement, and pavement marking at the northbound and southbound Green Creek Rest Areas on I-57. | — | Executed | Beniach Construction Co., Inc. $1,183,077 · | ||
| Jan 19, 2018 | 74808 | ClayEffinghamDistrict 7 | 12.9 miles of aggregate shoulders on Dieterrich/Clay City Road. | — | Executed | Howell Paving, Inc. $212,290 · | ||
| Jan 19, 2018 | 74821 | EffinghamDistrict 7 | Tree removal and seeding along I-57 from MP 165 to MP 168 in Effingham County. | — | Executed | J & M Highway Safety, LLC $95,000 · | ||
| Mar 9, 2018 | 74823 | EffinghamDistrict 7 | Routing, cleaning and sealing all longitudinal joints in the PCC pavement of I-57/70 from the Little Wabash River bridge to the 4th Street overpass in Effingham; includes all ramps throughout the project area. | — | Executed | Complete Asphalt Service Co. $298,231 · | ||
| Mar 9, 2018 | 74836 | ClayEffinghamDistrict 7 | Demolition of 3 buildings 1) Southwest corner of US 40 and 3rd Street in Effingham; 2) Along US 45 in Dietrich; 3) Along US 45 in Louisville. | — | Executed | John J. Klein d/b/a Klein Excavating $69,997 · | ||
| Apr 27, 2018 | 74822 | ClayEffinghamFayetteDistrict 7 | Replacing non-crash-worthy traffic barrier end-sections and steel plate beam guardrail at various locations in District 7. | — | Executed | Access Control Company, Inc. $885,400 · | ||
| Jun 15, 2018 | 74819 | EffinghamFayetteDistrict 7 | Seal 95 bridge decks on various routes. | — | Executed | All States Painting, Inc. $153,597 · | ||
| Jun 15, 2018 | 74839 | EffinghamDistrict 7 | D7 Ash Borer control 2018-2. | — | Executed | J & M Highway Safety, LLC $93,695 · | ||
| Jun 15, 2018 | 74840 | ColesEffinghamDistrict 7 | Remove and replace light towers and poles, rewiring light poles and towers, removal and replacement of tower and pole foundations at three locations; 1) NB Green Creek Rest Area; 2) I-57/US 45 interchange; 3) I-57/IL 16 interchange. | — | Executed | Egizii Electric, Inc., A Division of EEI Holding Corporation $514,629 · | ||
| Jun 15, 2018 | 95837 | EffinghamDistrict 7 | Resurfacing CH 19 from East State Street to IL 33. | — | Executed | Howell Paving, Inc. $591,484 · | ||
| Sep 21, 2018 | 74871 | EffinghamDistrict 7 | Tree removal in the ROW and median of I-57 from mile marker 164 to the Shelby County line. | — | Executed | J.H. Moore, Inc. $89,200 · | ||
| Mar 8, 2019 | 74881 | EffinghamDistrict 7 | 2.06 miles of patching on US 45 (Banker Street) from Wabash Avenue to Jaycee Avenue in Effingham | — | Executed | Beniach Construction Co., Inc. $86,442 · | ||
| Mar 8, 2019 | 74890 | CumberlandEffinghamDistrict 7 | Beam repairs under two structures: 1) I-57/70 under IL 32/33 in Effingham; 2) US 40 over Embarras River west of Greenup (SN 025-0034 and 018-0008) | — | Executed | Keeley & Sons, Inc. $114,835 · | ||
| Jun 14, 2019 | 46529 | EffinghamLawrenceMaconDistrict 7 | New automatic transfer switch and miscellaneous improvements to 3 pump stations: 1) Westport Pump House along IL 33 in Lawrence County; 2) Effingham Pump House at US 40 and US 45 in Effingham County; 3) Decatur Pump House on Garfield Avenue east of IL 121 in Macon County. | — | Executed | Bodine Electric of Decatur $230,811 · | ||
| Jun 14, 2019 | 74914 | EffinghamDistrict 7 | Tree removal and seeding along 1-70 east of Effingham, from milepost 98 to milepost 105. | — | Executed | Brewster Companies, Inc. $142,000 · | ||
| Aug 2, 2019 | 95854 | EffinghamDistrict 7 | Replace the bridge carrying FAX 708 over Muddy Creek, 1 mile west of Winterrowd | — | Executed | Depew and Owen Builders, Inc. $368,488 · | ||
| Aug 2, 2019 | 95859 | EffinghamDistrict 7 | Replace the bridge carrying Tr 34A over Limestone Creek, 3.5 miles west of Edgewood. | — | Executed | Samron Midwest Contracting, Inc. $177,699 · | ||
| Sep 20, 2019 | 74922 | EffinghamDistrict 7 | TREE REMOVAL AND SEEDING ALONG I-70 FROM MILE POST 98 TO MILE POST 105 EAST OF EFFINGHAM AND ALONG I-57 FROM THE I-70 / I-57 INTERCHANGE NORTH TO MILE POST 166 NORTHEAST OF EFFINGHAM. | — | Executed | Lion Construction 1, LLC $183,380 · | ||
| Nov 8, 2019 | 74859 | EffinghamDistrict 7 | One new superstructure and one new bridge deck (SN 025-0080 and SN 025-0081) on US 45 approximately 5 miles and 5.3 miles south of IL 37. | — | Executed | Plocher Construction Company, Inc. $3,212,600 · | ||
| Nov 8, 2019 | 74926 | EffinghamFayetteDistrict 7 | Cleaning and painting four bridges in Effingham County and three bridges in Fayette County. (SN 025-0051, 025-0052, 025-0064, 025-0030, 026-0091, 026-0074 026-0076) | — | Executed | All States Painting, Inc. $1,094,000 · | ||
| Mar 6, 2020 | 74924 | EffinghamDistrict 7 | 7.1 miles of patching, milling, resurfacing and aggregate wedge shoulders on Montrose Blacktop from US 40 in Montrose to north of IL 33 in Dietrich. | — | Executed | Howell Paving, Inc. $3,758,769 · | ||
| Mar 6, 2020 | 74929 | EffinghamDistrict 7 | Patching on I-57/70 from milepost 92 to milepost 105. | — | Executed | Kinney Contractors, Inc. $379,784 · | ||
| Apr 24, 2020 | 74907 | EffinghamDistrict 7 | 4.8 miles of patching and resurfacing on US 45 from Jacee Avenue to 0.23 miles south of IL 37. | — | Executed | Howell Paving, Inc. $4,591,388 · | ||
| Jun 12, 2020 | 74464 | ClayEffinghamDistrict 7 | 5.1 miles of HMA pavement removal, HMA resurfacing, aggregate shoulders and pavement patching on Dietrich Blacktop from north of 200th Avenue in Effingham County to south of Zion Lane in Clay County. | — | Executed | Howell Paving, Inc. $1,880,149 · | ||
| Jun 12, 2020 | 74971 | EffinghamDistrict 7 | 4.9 miles of cape seal on US 45 from the Shelby County line to Rickelman Avenue in Effingham. | — | Executed | Beniach Construction Co., Inc. $434,411 · | ||
| Jun 12, 2020 | 95524 | EffinghamDistrict 7 | Replace the superstructure and rehabilitate the abutments to the structure carrying CH 6 over Lake Sara, 3.0 miles southeast of Shumway. | — | Executed | Depew and Owen Builders, Inc. $362,188 · | ||
| Jul 31, 2020 | 95872 | EffinghamDistrict 7 | Sidewalk, lighting, curb and gutter, and resurfacing at various locations in Dieterich. | — | Rejected | Kieffer Bros. Construction Co., Inc. $1,284,012 · | ||
| Jan 15, 2021 | 74949 | EffinghamDistrict 7 | 4.8 miles of cape seal surface treatment on US 40 from 0.3 miles west of Lake Sara Road to Henriette Street in Effingham. | — | Executed | A. C. Pavement Striping Co. $504,469 · | ||
| Mar 5, 2021 | 74941 | EffinghamDistrict 7 | 7.9 miles of milling and resurfacing on Dietrich Blacktop from Church Street in Dietrich to 2 miles north of the Clay County line; also includes 10 miles of HMA shoulders and bridge improvements to SN 025-0091. | — | Executed | Howell Paving, Inc. $6,023,904 · | ||
| Apr 23, 2021 | 74916 | EffinghamDistrict 7 | 2 miles of crack and joint sealing on I-57/70 from the Little Wabash River to US 40 and 2.75 miles on I-57/70 from 4th Street overpass to the North Tri- Level including exit and entrance ramps. | — | Executed | Kinney Contractors, Inc. $372,278 · | ||
| Apr 23, 2021 | 74A36 | EffinghamShelbyDistrict 7 | 1.56 miles of partial depth resurfacing at various locations on US 40, IL 32 and IL 33. | — | Rejected | G. M. Sipes Construction, Inc. $614,328 · | ||
| Apr 23, 2021 | 95822 | EffinghamDistrict 7 | Trailhead parking improvements, sidewalk crossing improvements, pedestrian path signals and lighting, sigage and pavement markings at various loactions in Effingham. | — | Rejected | A & R Mechanical Service, Inc. $863,284 · | ||
| Jun 11, 2021 | 74A20 | EffinghamDistrict 7 | 4.2 miles of SMART inlay of mainline, shoulders and median crossovers and installation of traffic counter equipment on I-57 from the North Tri-level to the Shelby County line, north of Effingham. | — | Executed | Howell Paving, Inc. $3,962,885 · | ||
| Jun 11, 2021 | 74A38 | EffinghamDistrict 7 | 0.5 miles of patching along US 45 from north of Rickleman Avenue to north of Technology Drive in Effingham. | — | Executed | Kinney Contractors, Inc. $489,579 · | ||
| Sep 17, 2021 | 74752 | EffinghamDistrict 7 | Shoulder work, base course widening, curb and gutter, ADA sidewalk improvements and box culvert replacement on US 40 from the Fayette County line to Division Street in Altamont and on IL 128 from US 40 in Altamont to 0.1 miles north of I-70. | — | Executed | Howell Paving, Inc. $4,548,184 · | ||
| Nov 5, 2021 | 74A84 | EffinghamFayetteDistrict 7 | 23 miles of weed spraying along I-70 from milepost 61 in Fayette County to milepost 84 in Effingham County. | — | Executed | The Daltons Inc. $47,173 · | ||
| Nov 5, 2021 | 74A86 | ClayEffinghamFayetteDistrict 7 | Tree removal on I-57 from mile marker 134 to mile marker 158. | — | Executed | Brewster Companies, Inc. $139,700 · | ||
| Jan 21, 2022 | 74366 | EffinghamDistrict 7 | Removal and replacement of SN 025-0044 on IL 128, 3.3 miles south of IL 33. | — | Executed | Sangamo Construction Company $1,490,374 · | ||
| Jan 21, 2022 | 74456 | EffinghamDistrict 7 | 3 miles of designed overlay and ADA improvements on US 40 from Salt Creek to 1500th Avenue in Teutopolis. , 3 miles of designed overlay and ADA improvements on US 40 from Salt Creek to 1500th Avenue in Teutopolis. | — | Executed | Howell Paving, Inc. $2,948,245 · | ||
| Jan 21, 2022 | 74A74 | ColesEffinghamDistrict 7 | Lighting upgrades to LED on I-57 at US 45 and at IL 16 in Mattoon and at the northbound Green Creek Rest Area. | — | Executed | Bodine Electric of Decatur $525,537 · | ||
| Mar 11, 2022 | 95910 | EffinghamDistrict 7 | Replace the bridge carrying CH 16 over Bishop Creek, 3.0 miles west of Dieterich. | — | Executed | Howell Paving, Inc. $914,445 · | ||
| Apr 29, 2022 | 74797 | EffinghamDistrict 7 | 1.6 miles of resurfacing, ADA improvements and new traffic signals on US 45 from south of the I-57/70 eastbound ramp to US 40. | — | Executed | Howell Paving, Inc. $2,955,277 · | ||
| Apr 29, 2022 | 74A75 | EffinghamDistrict 7 | 0.6 miles of milling, patching and resurfacing on I-57 at the I-70 interchange. | — | Executed | Howell Paving, Inc. $1,082,723 · | ||
| Apr 29, 2022 | 74A76 | EffinghamDistrict 7 | 3.6 miles of patching on IL 32/33 from 0.2 miles north of the I-57/70 interchange to Jefferson Avenue and on US 45 from Fayette Avenue to Jaycee Avenue. | — | Executed | Beniach Construction Co., Inc. $388,450 · | ||
| Apr 29, 2022 | 74A81 | EffinghamDistrict 7 | 1.3 miles of patching on IL 37 from Eastwood Street to 700th Avenue in Watson and 0.9 miles of patching on the connector road between and I-57 and IL 37 in Edgewood. | — | Executed | G. M. Sipes Construction, Inc. $229,634 · | ||
| Jun 17, 2022 | 74599 | EffinghamDistrict 7 | 6.9 miles of rubblization, patching, resurfacing, shoulder replacement, guardrail replacement, culvert replacement and bridge deck replacement on I-70 from 0.5 miles east of I-57 to just east of the Cumberland County line. | — | Executed | Howell Paving, Inc. $50,277,006 · | ||
| Nov 18, 2022 | 74352 | EffinghamDistrict 7 | Project length is 0.17 miles. Removal and replacement of SN 025-0065 with HMA resurfacing, earthwork, riprap, guardrail, pavement marking, etc. SN 025-0065 is located on IL 128 over Big Moccasin Creek, 4.3 miles south of IL 33. | — | Executed | Plocher Construction Company, Inc. $1,890,000 · | ||
| Nov 18, 2022 | 74A69 | EffinghamDistrict 7 | Bridge joint repairs, bridge deck patching, slope wall replacement and bridge deck scarification and overlay at the I-57 / I-70 tri-level southwest of Effingham. | — | Executed | Sangamo Construction Company $2,467,116 · | ||
| Nov 18, 2022 | 74A90 | EffinghamDistrict 7 | Bridge deck overlay, bridge joint repair and replacement and bridge deck patching on SN 025-0079 carrying US 40 over the Little Wabash River, 2 miles west of Effingham. | — | Executed | Samron Midwest Contracting, Inc. $498,498 · | ||
| Mar 10, 2023 | 74212 | EffinghamDistrict 7 | PCC pavement, pavement removal, earthwork, curb and gutter, storm sewer, traffic signals, highway lighting and sidewalks on US 40 and IL 33 from west of Raney Street to East of Walnut Street in Effingham. | — | Executed | McCarthy Improvement Company $21,800,000 · | ||
| Mar 10, 2023 | 74B49 | EffinghamDistrict 7 | Patching at various locations: I-57 from the Clay County line to mile marker 153; West Fayette Avenue from Outerbelt West to 0.1 miles west of Raney Street in Effingham; US 40/Henrietta Street from 0.1 miles south of Grove Avenue to Grove Avenue in Effingham. | — | Executed | G. M. Sipes Construction, Inc. $566,009 · | ||
| Mar 10, 2023 | 74B71 | EffinghamDistrict 7 | 0.2 miles of weed control and landscaping on IL 32/33 from Marguerite Lane to 0.1 miles northwest of Woodland Drive in Effingham. | — | Executed | Endrizzi Contracting, Inc $209,914 · | ||
| Apr 28, 2023 | 74B56 | EffinghamFayetteDistrict 7 | Bridge painting at various locations in Fayette and Effingham Counties. | — | Executed | Venus Painting Co. $474,182 · | ||
| Jun 16, 2023 | 74A13 | EffinghamDistrict 7 | Deck replacement on SN 025-0083 carrying US 45 over Big Salt Creek, 3 miles south of IL 37. | — | Executed | Plocher Construction Company, Inc. $2,319,476 · | ||
| Jun 16, 2023 | 74A88 | EffinghamDistrict 7 | Patching, resurfacing and aggregate shoulders on IL 33 from Salt Creek in Effingham to west of Pine Street in Dietrich. | — | Executed | Howell Paving, Inc. $2,949,123 · | ||
| Jun 16, 2023 | 95935 | EffinghamDistrict 7 | HMA resurfacing with aggregate shoulders, and guardrail replacement on East 1600th Avenue from North 700th Street to North 1000th Street. | — | Executed | Howell Paving, Inc. $1,759,700 · | ||
| Nov 17, 2023 | 74B34 | EffinghamDistrict 7 | Bridge deck overlay, bridge joint replacement, deck drain replacement, bridge deck patching on SN 025-0089 carrying IL 37 over the Little Wabash River, 0.5 miles south of I-57. | — | Executed | Sangamo Construction Company $761,969 · | ||
| Mar 8, 2024 | 74B82 | EffinghamDistrict 7 | 3.3 miles of patching, milling and resurfacing on IL 32/33 from 0.2 miles west of IL 32 to 0.2 miles west of Ford Avenue in Effingham. | — | Executed | Howell Paving, Inc. $4,287,220 · | ||
| Apr 26, 2024 | 74B42 | EffinghamDistrict 7 | 5.5 miles of crack and joint sealing on US 40 from East Division Street in Altamont to 0.3 miles west of Lake Sara Road. | — | Executed | Complete Asphalt Service Co. $40,973 · | ||
| Apr 26, 2024 | 74C43 | EffinghamFayetteDistrict 7 | 2.4 miles of cape seal on IL 128 from the Shelby County line to IL 33. | — | Executed | A. C. Pavement Striping Co. $329,696 · | ||
| Apr 26, 2024 | 74C80 | ColesEffinghamDistrict 7 | Parking lot improvements at the Effingham District Office and the Mattoon Yard. | — | Executed | G. M. Sipes Construction, Inc. $352,266 · | ||
| Jun 14, 2024 | 74984 | EffinghamDistrict 7 | Culvert replacement on IL 37 over a stream 0.1 miles northeast of Iowa Street, northeast of Edgewood. (SN 025-8633) | — | Executed | Sangamo Construction Company $451,551 · | ||
| Jun 14, 2024 | 74C87 | EffinghamDistrict 7 | 5 miles of patching on I-57 and I-70, including ramps, from the Little Wabash River south of Effingham to I-57 north of Effingham. | — | Executed | Kinney Contractors, Inc. $881,645 · | ||
| Aug 2, 2024 | 95943 | EffinghamDistrict 7 | Concrete Sidewalk construction with ADA Ramps, erosion control and utility relocation at various locations in Dieterich. | — | Executed | Feutz Contractors, Inc. $300,176 · | ||
| Sep 20, 2024 | 74C53 | EffinghamDistrict 7 | Bridge deck overlay on SN 025-0031 carrying IL 33 over Morris Creek, 0.3 miles west of 500th Street. | — | Executed | C-Hill Civil Contractors, Inc. $369,369 · | ||
| Mar 7, 2025 | 74C96 | EffinghamDistrict 7 | Patching, bridge deck overlay, bridge joint repair/replacement, bridge deck repairs on SN 026-2004 on US 45 (Banker Street) at CSXT Railroad (overhead), 0.2 miles south of US 40. | — | Executed | Sangamo Construction Company $1,553,456 · | ||
| Apr 25, 2025 | 74B64 | EffinghamDistrict 7 | 6.1 miles of new shoulders and safety improvements on Dietrich Blacktop from north of Willow Avenue in Montrose to 1100the Avenue north of Dietrich. | — | Executed | Howell Paving, Inc. $1,731,256 · | ||
| Apr 25, 2025 | 74C48 | EffinghamDistrict 7 | 20.9 miles of crack and joint sealing on southbound I-57 from the Clay County line to I-70 and on northbound I-57 from the Little Wabash River to I-70. | — | Executed | Complete Asphalt Service Co. $384,459 · | ||
| Apr 25, 2025 | 74D28 | EffinghamDistrict 7 | 2 miles of patching on US 45 (South Banker Street) from Fayette Avenue to Jaycee Avenue in Effingham. | — | Executed | Feutz Contractors, Inc. $528,441 · | ||
| Apr 25, 2025 | 95972 | EffinghamDistrict 7 | HMA resurfacing on N 300 Street from 475 N to the Effingham/Fayetteville county line. Includes; aggregate shoulders, and pavement markings. | — | Executed | Howell Paving, Inc. $2,411,360 · | ||
| Jun 13, 2025 | 74B63 | EffinghamDistrict 7 | 4.7 miles of safety shoulder on US 45 from the Shelby County line to 0.2 miles north of Rickleman Avenue in Effingham. | — | Executed | Howell Paving, Inc. $1,185,220 · | ||
| Jun 13, 2025 | 74D29 | EffinghamDistrict 7 | 1.3 miles of patching on IL 32 / Keller Drive from West Evergreen to 0.1 miles south of Grove Avenue. | — | Executed | Kinney Contractors, Inc. $727,801 · | ||
| Sep 19, 2025 | 74608 | EffinghamDistrict 7 | 0.3 miles of resurfacing and ADA improvements on Dietrich Blacktop from IL 33 to Church Street in Dietrich. | — | Executed | Howell Paving, Inc. $947,329 · | ||
| Sep 19, 2025 | 74A04 | EffinghamDistrict 7 | Structure removal and replacement, paved shoulder removal, pavement removal, pipe underdrains, PCC pavement, PCC shoulders, HMA base course, guardrail and median crossovers on I-57 at Green Creek, 1.5 miles south of the Shelby County line. (SN 025-0003) | — | Executed | Howell Paving, Inc. $7,201,957 · | ||
| Sep 19, 2025 | 74D57 | EffinghamDistrict 7 | Installation of a median crossover on I-70 approximately 0.4 miles west of the IL 128 interchange. | — | Executed | Howell Paving, Inc. $860,301 · | ||
| Jan 16, 2026 | 74498 | EffinghamDistrict 7 | 3.1 miles of resurfacing on IL 32 from the Shelby County line to IL 33. | — | Executed | Howell Paving, Inc. $2,835,837 · | ||
| Jan 16, 2026 | 74893 | EffinghamDistrict 7 | 1.2 miles of reconstruction, bridge replacement and bridge repairs on I-70 from Altamont to 0.8 miles east of the Altamont interchanges. | — | Executed | William Charles Construction Company, LLC $32,709,958 · | ||
| Jan 16, 2026 | 74B61 | EffinghamDistrict 7 | 0.5 miles of resurfacing and patching on IL 32/33 in Effingham from west of Ford Avenue to 0.1 miles west of Evergreen Avenue. | — | Executed | Howell Paving, Inc. $1,434,601 · | ||
| Jan 16, 2026 | 74C61 | ClayEffinghamDistrict 7 | 8 miles of resurfacing on I-57 northbound lanes from the Fayette County line to the Little Wabash River. | — | Executed | Howell Paving, Inc. $6,207,309 · | ||
| Jan 16, 2026 | 74D37 | EffinghamDistrict 7 | Removal and replacement of lighting at exit 105 on I-70 in Montrose. | — | Executed | Capitol Construction Group, LLC d/b/a Egizii Electric $331,606 · | ||
| Feb 27, 2026 | 74D47 | EffinghamFayetteDistrict 7 | Bridge deck sealing on 98 bridge decks throughout Effingham and Fayette Counties. | — | Executed | All States Painting, Inc. $154,439 · | ||
| Feb 27, 2026 | 74D64 | EffinghamFayetteDistrict 7 | 64.5 miles of weed spray control on I-57 and I-70 in Effingham and Fayette Counties. | — | Executed | The Daltons Inc. $84,942 · | ||
| Jun 12, 2026 | 74D42 | EffinghamDistrict 7 | Demolition of buildings, tree removal, sign removal, and seeding on US 40 / IL 33 (Fayette Avenue) from Banker Street to Willow Street in Effingham. | — | Executed | Phoenix Corporation of the Quad Cities $641,335 · | ||
| Jun 12, 2026 | 74D51 | EffinghamDistrict 7 | Fencing removing and replacement at the Effingham Maintenance Yard. | — | Executed | COLLINS & HERMANN, INC. $289,716 · | ||
| Jun 12, 2026 | 95996 | EffinghamDistrict 7 | Reconstruction of intersections along US 40 from Race Street to Wall Street in the village of Teutopolis. | — | Executed | A&A Concrete LLC $274,477 · | ||
| Sep 18, 2026 | 74E40 | EffinghamDistrict 7 | New guardrail installation along US 40 at Cips Lake in Effingham. | — | Executed | Midwest Fence Corporation $64,995 · |
1–87 of 87
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.