Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jun 12, 2020 61G41 CookDistrict 1 Construction of a pedestrian path adjacent to IL 72/Higgins Road, from west of Plum Grove Road to east of Plum Grove Road in Schaumburg. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $689,669 ·
Jun 12, 2020 61G42 CookDistrict 1 Reconstruction of Central Avenue from the Union Pacific Railroad to Sheridan Road. Resurfacing of Wilmette Avenue from the Union Pacific Railroad to Lake Avenue, and traffic signal modernization at Central and Wilmette Avenues in Wilmette. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $9,504,079 ·
Jun 12, 2020 61G50 CookDistrict 1 Resurface Vincennes Road from Us 6 to Armory Drive, Armory Drive from Westview Avenue to Vincennes Road, and Westview Avenue from 172nd Street to Armory Drive in South Holland. — Executed Nov 26 New Gallagher Asphalt Corporation $1,234,904 ·
Jun 12, 2020 61G51 CookDistrict 1 Construction of a pedestrian bridge on Bryn Mawr Avenue over the Des Plaines River in Rosemont. — Executed Nov 26 New Copenhaver Construction, Inc. $1,253,143 ·
Jun 12, 2020 61G52 CookDistrict 1 Buffalo Creek trail extension from Lake Cook Road to the existing trail in Arlington. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $265,753 ·
Jun 12, 2020 61G61 CookDistrict 1 Construction of a multi-use path adjacent to Old Green Bay Road, from Maple Hill Road to Park Avenue in Glencoe. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $776,067 ·
Jun 12, 2020 62A38 CookDistrict 1 (0.27 mile) Intersection improvement consisting of HMA surface removal, pavement widening, earth excavation, ADA sidewalk repair, construction of a concrete barrier median and HMA resurfacing on IL 171 (1st Ave) at Roosevelt Rd. — Executed Nov 26 New K-Five Construction Corporation $1,462,098 ·
Jun 12, 2020 62F20 CookDuPageDistrict 1 (18.3 mi), IL 83 between IL 171 and Third Ave, guardrail installation, shoulder rumble strip, re-striping pavement markings, wireless interconnect and reflecto ized traffic signal backplates. — Executed Nov 26 New K-Five Construction Corp & Quality Seal & Saw, Inc & Midwest Fence Corp Tri-Venture $1,074,369 ·
Jun 12, 2020 62F90 CookDistrict 1 Traffic Signal Modernization, Channelization, Standard Overlay, ADA Improvements; FAP Route 348 (IL 43 / Harlem Ave) at Archer Ave in the City of Chicago and the Village of Summit in Cook County. — Executed Nov 26 New K-Five Construction Corporation $1,287,974 ·
Jun 12, 2020 62G02 CookDistrict 1 Traffic Signal Modernization and left turn lane storage extension at the the intersection of Ogden Ave and Austin Blvd located in the Town of Cicero. — Executed Nov 26 New Lyons Electric Company, Inc. $758,758 ·
Jun 12, 2020 62H70 CookDistrict 1 This is a slope stabilization project on IL Rte 83 from north of Glenwood Dyer Road to south of Glenwood Lansing Road that includes guardrail replacement. It is located in Village of Lynwood in Cook county. The gross and net length of the project is 1.183 miles (6250 ft). , (6250 ft) Slope stabilization on IL Rte 83 from N. of Glenwood Dyer Rd. to S. of Glenwood Lansing Rd, includes guardrail replacement located in the Village of Lynwood. — Executed Nov 26 New D. Construction, Inc. $760,107 ·
Jun 12, 2020 62J28 CookDistrict 1 Removal and replacement of an existing 32-foot long 18" x 24" culvert with a proposed 48-foot long 36" x 72" cast in place culvert (Proposed SN 016-2272) on 147th Street over Tributary C. of Cal-Sag Channel in the city of Oak Forest and The Forest Preserve District of Cook County. , (LT 351 Ft.) Improve 147th Street over Tributary C. of Cal-Sag Channel — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $334,356 ·
Jun 12, 2020 62J68 CookDistrict 1 8 miles of standard overlay, HMA and Class B patching, and pedestrian ramps on US 45 / IL 21 from just north of Columbus Parkway to North of Rand Road in the Villages of Wheeling, Mount Prospect and Cities of Prospect Heights and Des Plaines. , Standard Overlay, HMA, Class B patching and pedestrian ramp begins 500 ft north of Columbus Pkwy and proceeds 41323 ft (8.0 miles) southerly direction to North of Rand Rd. in the Villages of Wheeling, Mount Prospect and Cities of Prospect Height and Des·P — Executed Nov 26 New Arrow Road Construction Co. $4,381,945 ·
Jun 12, 2020 62J89 CookDistrict 1 (5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located within South Chicago and Hyde park Townships. , (5 mile) Standard overlay and ADA Pedestrian Ramps on Michigan Ave. Located — Executed Nov 26 New K-Five Construction Corporation $4,658,002 ·
Jun 12, 2020 62J98 CookDistrict 1 Bridge beam replacement for SN 016-0825 carrying Church St over I-94. — Executed Nov 26 New ICC Group Inc. $676,200 ·
Jun 12, 2020 62K20 CookDistrict 1 Improvements to bridge parapet, joint, steel, and wingwall on I-55 over BRC RR in Chicago. — Executed Nov 26 New D. Construction, Inc. $655,770 ·
Jun 12, 2020 62K35 CookDistrict 1 Permanent protective shield installation on IL 53 bridges over IL 62, US 14 and RR, Palatine Rd, Kirchoff Rd, Anderson Dr, as well as Fulton Market St bridge over I-90/I-94. — Executed Nov 26 New Herlihy Mid-Continent Company $790,785 ·
Jun 12, 2020 62K49 CookDistrict 1 Partial beam and deck replacement on the bridge carrying Sibley Blvd. over I- 94 located in the Village of Dolton, IL. LT= 1110 FT (0.21MI) — Executed Nov 26 New D. Construction, Inc. $682,072 ·
Jun 12, 2020 62K72 CookDistrict 1 (593.9 FT.) Bridge repair project of the structure carrying Torrence Ave over IHB and BandOCT Railroads, in the Village of Burnham, in Thornton Township, in Cook County. SN 016-0935 — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $479,948 ·
Jun 12, 2020 62K76 CookDistrict 1 Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, in the South Chicago Township, and Roosevelt Road over IHB Rail Road. , Cleaning and painting existing steel on the structures carrying, Michigan Ave. Over 1-55, and Roosevelt Road Over IHB Railroad. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $428,200 ·
Jun 12, 2020 62K92 CookDistrict 1 (12.6 miles) Patching on 1-57, Halsted St. to 1-80, located in the Villages of Calumet Park Dixmoor, Posen, Riverdale, Markham and Blue Island. — Executed Nov 26 New K-Five Construction Corporation $2,539,731 ·
Jun 12, 2020 62K97 CookDuPageDistrict 1 Entire concrete bridge deck, top of sidewalks, inside and top of parapets. Drai age system repairs and cleaning. Structures located at various locations within Cook and DuPage County. — Executed Nov 26 New Vixen Construction, Inc. $285,533 ·
Jul 31, 2020 46554 CookDistrict 1 Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown. — Executed Nov 26 New Superior Road Striping, Inc. $482,391 ·
Jul 31, 2020 46555 CookDistrict 1 Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new ones within the limits shown. — Executed Nov 26 New Superior Road Striping, Inc. $2,952,962 ·
Jul 31, 2020 61F92 CookDistrict 1 Replace the bridge carrying Central Street over the North Shore Channel in Evanston. — Executed Nov 26 New Copenhaver Construction, Inc. $6,169,456 ·
Jul 31, 2020 62J50 CookDistrict 1 (3.1 mile) Standard overlay and ADA improvements on Narragansett Ave., from Cortland St. to Nagle Ave. in the City of Chicago, Jefferson Township. — Executed Nov 26 New Bigane Paving Company $1,669,141 ·
Jul 31, 2020 62K84 CookDistrict 1 ADA improvement project located along various State routes located in the Villages of Tinley Park, Homewood, Hazel Crest and Cities of Country Club Hills, Oak Forest and Blue Island. — Executed Nov 26 New Davis Concrete Construction Co. $332,357 ·
Jul 31, 2020 62K86 CookDistrict 1 ADA improvement project located along various State routes located in the Town of Cicero. — Executed Nov 26 New J. Nardulli Concrete, Inc. $450,427 ·
Jul 31, 2020 62K87 CookDistrict 1 ADA improvement project located along various State routes located in the Villages of Homer Glen, Lemont and Orland Park. — Executed Nov 26 New Davis Concrete Construction Co. $368,767 ·
Jul 31, 2020 62K90 CookDistrict 1 This is an ADA improvement project located along various State routes located in the City of Country Club Hills and Villages of Matteson, Olympia Fields, Homewood, Tinley Park and Flossmoor. — Executed Nov 26 New Davis Concrete Construction Co. $576,216 ·
Jul 31, 2020 62K91 CookDistrict 1 This is an ADA improvement project located along various State routes located in the Villages of River Forest and Riverside. — Executed Nov 26 New Triggi Construction, Inc. $483,366 ·
Jul 31, 2020 62M20 CookDistrict 1 (0.953 miles) SMART overlay project on 471h Street from east of County line Rd. to east of Wolf Road, includes PCC pavement overlay, ADA sidewalk located in Villages of Hinsdale and Western Springs. — Executed Nov 26 New J. A. Johnson Paving Company $996,700 ·
Sep 18, 2020 60P14 CookDistrict 1 (1.22 miles) The 3 signalized intersections include: IL 72 at Oakton St. (W Jct), IL 72 at IL 83 Busse Rd and IL 72 east of IL 83 (E Jct). IL 72 and IL 83 intersection is approx. 1000 FT south of I-90. — Executed Nov 26 New Alliance Contractors, Inc. $5,751,620 ·
Sep 18, 2020 60Y21 CookDistrict 1 (0.30-miles) Intersection Reconstruction (traffic signal modernization, addition of turn lanes) at the intersection of IL 19 (Irving Park Road) and Scott Street and at Judd Avenue. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $2,498,941 ·
Sep 18, 2020 60Y23 CookDistrict 1 (0.32- mile) Right turn lane, traffic signal modernization, and ADA improvement. Location: Willow Road, from 646-ft west of the centerline of the centerline of Pfingsten Road to 524- ft east of the centerline of Pfingsten Road in the Villages of Glenview and Northbrook, Northfield Township. — Executed Nov 26 New Alliance Contractors, Inc. $1,473,789 ·
Sep 18, 2020 61G15 CookDistrict 1 Streetscape improvements on IL 21 from Jonquil Terrace to Howard Street, in the Village of Niles. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $574,435 ·
Sep 18, 2020 61G48 CookDistrict 1 Remove and replace sidewalks, curb and gutter, and driveways on 13th Street, from 23rd Avenue to 17th Avenue, and on 15th Street from 21st Avenue to 19th Avenue in Broadview. — Executed Nov 26 New J. Nardulli Concrete, Inc. $134,011 ·
Sep 18, 2020 62L01 CookDistrict 1 (0.528 Mile) standard overlay with ADA ramp improvement from 26th St to 31st St in the Village of Riverside, in Riverside Township. — Executed Nov 26 New K-Five Construction Corporation $496,965 ·
Sep 18, 2020 62L14 CookDistrict 1 (0.92 Mile) Standard Overlay, ADA Improvement, Located on Meacham Road from south of Emerson Ave to ILL 62 (Algonquin Road). — Executed Nov 26 New Arrow Road Construction Co. $755,906 ·
Sep 18, 2020 62L96 CookDistrict 1 (3.05 Miles) Crack and Joint Sealing Improvements, Location: FAP 350; IL 50/US 41 (Skokie Blvd.) from North of Golf Rd to Touhy Ave. — Executed Nov 26 New Denler, Inc. $125,087 ·
Sep 18, 2020 62L97 CookDistrict 1 (2.60 Miles) Crack and joint sealing, includes pavement marking re-striping. Located from Will-Cook Road to Southwest Highway. — Executed Nov 26 New Denler, Inc. $60,652 ·
Nov 6, 2020 61G45 CookDistrict 1 Construction of a HMA multi-use path, sidewalks, curb and gutter, retaining wall, and pavement markings along Cicero Avenue from Meadow Lake Court (Poplar Ave) to Gateway Drive in Richton Park. — Executed Nov 26 New D. Construction, Inc. $692,219 ·
Nov 6, 2020 61G77 CookDistrict 1 Intersection improvements including curb "bump outs", bus shelters, covered bicycle parking, pavement markings, signage and a pedestrian activated cross- walk warning system on Broadway Avenue from Rice Street to Main Street in Melrose Park. — Executed Nov 26 New R. W. Dunteman Company $356,565 ·
Nov 6, 2020 62K81 CookDistrict 1 ADA Improvements to sidewalk curb ramps to make compliant with PROWAG. Located at 26th Street and Ridgeland Avenue in the City of Berwyn, all in Berwyn Township. — Executed Nov 26 New Triggi Construction, Inc. $1,116,609 ·
Nov 6, 2020 62K82 CookDistrict 1 ADA Improvements to sidewalk curb ramps to make compliant with PROWAG. Located at 26th Street and Ridgeland Avenue in the City of Berwyn, all in Berwyn Township. — Executed Nov 26 New Triggi Construction, Inc. $697,210 ·
Nov 6, 2020 62K83 CookDistrict 1 ADA improvement project located along various State maintained routes within Bloom Township. Located in the City of Chicago Heights and Villages of Glenwood, Homewood, Lansing and Lynwood. — Executed Nov 26 New Triggi Construction, Inc. $788,016 ·
Nov 6, 2020 62K85 CookDistrict 1 ADA Improvements to sidewalk curb ramps to compliant with PROWAG. Located at Vermont St, Vincennes St, Ashland Ave and 1271th St. in the Villages of Calumet Park, Blue Island and Riverdale, all in Calumet Township. — Executed Nov 26 New Acura Inc. $708,708 ·
Nov 6, 2020 62K89 CookDistrict 1 ADA Improvements to sidewalk curb ramps to make compliant with PROWAG. Located at 131st St, Kean Ave, US 12/20 (95th St), IL 7 (Southwest Hwy), IL 43 (Harlem Ave) in Bridgeview, Chicago Ridge, Hickory Hills, Palos Heights, Palos Hills, Palos Park and Worth, all in Palos Twp. — Executed Nov 26 New Acura Inc. $839,950 ·
Nov 6, 2020 62L17 CookDistrict 1 (3.07 Mile) Resurfacing (Smart Overlay), milled rumble strips; Location: FAP 332: IL 394 from North of 186th Street to South of Joe Orr Road in the Villages of Lansing, Glenwood, Lynwood and Ford Heights. — Executed Nov 26 New D. Construction, Inc. $2,825,421 ·
Nov 6, 2020 62L40 CookDistrict 1 (2788 Ft.) Crack and Joint Sealing project from Western Ave to Carrol Ave. in the Village of Harvey, in Thornton Township. — Rejected Nov 26 New Freehill Asphalt, Inc. $130,312 ·
Nov 6, 2020 62L41 CookDistrict 1 (6.2-Mile) Cleaning and Sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter, restriping pavement marking from Balbo Dr to 57th Dr in City of Chicago. — Rejected Nov 26 New Freehill Asphalt, Inc. $540,128 ·
Nov 6, 2020 62L43 CookDistrict 1 Cleaning and sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villa (1.74-Mile) Improvement on IL 38 from Harrison St to Manheim Rd consists of cleaning and sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages Hillside and Westchester, Proviso Township. — Rejected Nov 26 New Freehill Asphalt, Inc. $108,423 ·
Nov 6, 2020 62L71 CookDistrict 1 1.69 miles of cleaning and sealing longitudinal cracks in the existing concrete pavement between traffic lanes and curb and gutter on IL 43 from IL 72 to south of Collum Ave. in Norridge and the City of Chicago. — Rejected Nov 26 New SKC Construction, Inc. $206,985 ·
Nov 6, 2020 62L72 CookDistrict 1 (3.49-Mile) Crack and Joint sealing on PCC pavement. Location: IL 62 (Algonquin Rd) from Penny Rd to Center Port Dr. in the Village of South Barrington, Palatine and Hoffman Estates. — Rejected Nov 26 New Freehill Asphalt, Inc. $131,471 ·
Nov 6, 2020 62M23 CookDistrict 1 Traffic Signal Modernization and ADA curb ramp improvements at the intersection of IL Route 58 at Shady Oaks Drive in Elgin, Cook County. — Executed Nov 26 New H & H Electric Co. $313,863 ·
Nov 6, 2020 62M67 CookDuPageDistrict 1 Installation of ramp speed advisory radar signs and curve warning signs, at various locations in Cook and DuPage counties. — Executed Nov 26 New Western Remac, Inc. $144,928 ·
Nov 6, 2020 62M74 CookDistrict 1 Cleaning and painting the steel structure carrying IL 43 (Harlem Ave) over Calumet Sag Channel in the Village of Worth and the City of Palos Heights, SN 016-0323 — Executed Nov 26 New Capital Industrial Services $930,033 ·
Nov 6, 2020 62M75 CookDistrict 1 Bridge pier repair on pier 2 of SN 016-1100, located on 1-90 at Foster Avenue in the City of Chicago, Cook Cou This improvement consists of bridge pier repair on pier 2 of SN 016-1100, located on 1-90 at Foster Avenue in the City of Chicago, Cook County. — Executed Nov 26 New Sumit Construction Co., Inc. $161,951 ·
Nov 6, 2020 62M78 CookDistrict 1 Installation of ramp speed advisory radar signs and curve warning signs, at various locations in Cook and DuPage counties. — Executed Nov 26 New Sumit Construction Co., Inc. $537,335 ·
Nov 6, 2020 62M88 CookDistrict 1 Cleaning and painting designated existing steel on the structures carrying Lake-Cook Road and Sheridan Road over various ravines, In the Village of Glencoe, in Moraine and New Trier Townships. — Executed Nov 26 New Capital Industrial Services $453,300 ·
Nov 6, 2020 62M89 CookDistrict 1 Bridge Painting project in Calumet City and Country Club Hills, in Thornton and Bremen Township. Location 1 (SN-016-0956): Il-83 Sibley Blvd. over 1-94 (Bishop Ford Expy.). Location 2 (SN-016-2125): 167th Street over 1-57; — Executed Nov 26 New Capital Industrial Services $983,300 ·
Nov 6, 2020 62M97 CookDistrict 1 Cleaning(sweeping) various arterial highways in District One throughout (North) Cook county. — Active Nov 26 New Illinois Central Sweeping LLC $1,215,520 ·
Nov 6, 2020 62M98 CookDistrict 1 Cleaning(sweeping) various arterial highways in District One throughout (South) Cook county. — Active Nov 26 New Illinois Central Sweeping LLC $1,025,240 ·
Jan 15, 2021 61G68 CookDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement and pavement markings on Oak Park Avenue from Roosevelt Road to North Avenue in Oak Park. — Executed Nov 26 New Arrow Road Construction Co. $2,086,257 ·
Jan 15, 2021 61G76 CookDistrict 1 Roadway reconstruction, box culvert replacement, and constructon of a soldier pile retaining wall under the I-294 bridge, on Franklin Avenue from east of the Canadian Pacific Bensenville Yard entrance to est of the I-294 bridge in Franklin Park. — Executed Nov 26 New Dunnet Bay Construction Company $1,671,760 ·
Jan 15, 2021 61G78 CookDistrict 1 Traffic signal replacement and sidewalk construction on US 20 from Walnut Avenue to Center Avenue in Streamwood. — Executed Nov 26 New Triggi Construction, Inc. $296,311 ·
Jan 15, 2021 61G86 CookDistrict 1 Resurfacing, curb and gutter replacement, sidewalk replacement, pavement widening to accommodate bike lanes, and pavement markings on McCarthy Road from Illinois Street to Walker Road in Lemont. — Executed Nov 26 New P. T. Ferro Construction Co. $1,669,136 ·
Jan 15, 2021 61G87 CookDistrict 1 Resurfacing Kenilworth Avenue from Green Bay Road to Sheridan Road in the Village of Kenilworth. — Executed Nov 26 New Peter Baker & Son Co. $678,334 ·
Jan 15, 2021 61G88 CookDistrict 1 Replace the superstructure that carries Roy Avenue over Addison Creek, located south of Country Club Drive in Northlake. — Executed Nov 26 New Alliance Contractors, Inc. $576,447 ·
Jan 15, 2021 62D60 CookDistrict 1 (3.40-mile) Standard overlay, ADA improvements and channelization on Kedzie Ave. from n/o 871h St. to 103rd St. and 115th St. to n/o 131 St. and at 87th St. Located within the City of Blue Island, Villages of Alsip, Evergreen Park, and Merrionette Park. — Executed Nov 26 New D. Construction, Inc. $3,133,576 ·
Jan 15, 2021 62H50 CookDistrict 1 Bridge Deck Overlay, Joint Repairs and Substructure Repairs (672.28 FT) The improvement on IL Rte. 50 over BRC Railroad consist of Bridge Deck Overlay, Joint Repairs and Substructure Repairs. Located in the City of Chicago and Village of Bedford Park. — Executed Nov 26 New D. Construction, Inc. $3,336,549 ·
Jan 15, 2021 62J73 CookDistrict 1 (1.46-Mile) Standard overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA sidewalk repair and thermoplastic pavement marking on US 34 from 1-294 to Edgewood Avenue within the Villages of Western Springs and LaGrange. — Executed Nov 26 New K-Five Construction Corporation $1,608,307 ·
Jan 15, 2021 62L26 CookDistrict 1 (2.27 4-Mile) Standard overlay project on 47th Street from east of Plainfield Road to west of IL Rte. 43 (Harlem Avenue) that includes ADA sidewalk improvements. Located in Villages of Brookfield, McCook, and Lyons. — Executed Nov 26 New R. W. Dunteman Company $1,944,316 ·
Jan 15, 2021 62L45 CookDistrict 1 Smart Overlay, Class D patching and ADA improvement. Project begins 50 ft south of 31st St. and proceeds approximately 4637.9 ft in a northerly direction to 23rd St. in the Villages of Brookfield and Berwyn Township. — Executed Nov 26 New Humir Construction, Inc. $1,088,461 ·
Jan 15, 2021 62L46 CookDistrict 1 Sealing cracks and joints in the existing HMA pavement, restriping with modified urethane pavement marking in (6.69-Mile) Improvement on 1-290 from 1-88 to East of Austin Blvd consist of sealing cracks and joints in the existing HMA pavement, restriping with modified urethane pavement marking in the village of Hillside, Bellwood, Maywood, Forest Park, Broadview, and Oak Park, Provisio and Oak Park Townships. — Executed Nov 26 New Freehill Asphalt, Inc. $628,759 ·
Jan 15, 2021 62L47 CookDuPageDistrict 1 Cleaning and sealing cracks and joints in the existing concrete pavement, new pavement marking in the village (2.80-Mile) Improvement on 1-290 from Grand Ave to Cook County Line Rd consists of cleaning and sealing cracks and joints in the existing concrete pavement, new pavement marking in the village of Elmhurst, York and Addison Townships. — Executed Nov 26 New Freehill Asphalt, Inc. $206,128 ·
Jan 15, 2021 62L50 CookDistrict 1 (1,945-Mile) Pavement Patching and Crack and Joint Sealing project from South Indiana Ave to East of 1-94 (Bishop Ford Expy.) in Hyde Park Township, in Cook County. — Executed Nov 26 New K-Five Construction Corporation $902,975 ·
Jan 15, 2021 62L74 CookDistrict 1 (1,444-Ft.) SMART Overlay and ADA Ramp Improvement. Location: IL 64 (North Ave.) Sheffield Ave to Halsted St. in The City of Chicago in Cook County. — Executed Nov 26 New MAT Construction Leasing, Inc. $242,011 ·
Jan 15, 2021 62L75 CookDistrict 1 (2.9-Mile) Crack and Joint Sealing on existing HMA pavement. Location: IL 64 (North Ave.) Damen Ave to US 41 within the City of Chicago in Cook County. — Executed Nov 26 New SKC Construction, Inc. $133,565 ·
Jan 15, 2021 62L78 CookDistrict 1 (1.71-Mile) Crack and joint sealing improvements on IL 171 from Forest Preserve Dr. to south of Des Plaines River Rd. Located within the Village of River Grove in Cook County. — Executed Nov 26 New SKC Construction, Inc. $117,128 ·
Jan 15, 2021 62L79 CookDistrict 1 (5.98-Mile) SMART Overlay and ADA Pedestrian Ramps project on IL-43 (FAP 348) from north of US 6 (159th St) to north of 111th St. Located within the Villages of Orland Park, Worth and Palos Heights in Cook County. — Executed Nov 26 New Gallagher Asphalt Corporation $4,409,859 ·
Jan 15, 2021 62M01 CookDistrict 1 (1.373-Mile) HMA SMART Overlay of IL-1 (Halsted St), approx. 600' north of the intersection of 159th St, and extends to the north through Harvey and Phoenix in Cook County to a point approx. 200' north of East 149th St. — Executed Nov 26 New K-Five Construction Corporation $787,084 ·
Jan 15, 2021 62M22 CookDistrict 1 Bridge deck overlay and joint repair (426.26-FT) Improvement of 31st street over Des Plaines River consists of bridge deck overlay and joint repair. Located in the Village of Riverside, in Cook County, IL. SN=016-0870 — Executed Nov 26 New D. Construction, Inc. $614,303 ·
Jan 15, 2021 62M38 CookDistrict 1 Bridge deck overlay and joint repairs (522-FT) Improvement of Illinois 171 over Des Plaines River consists of bridge deck overlay and joint repairs. Located in the Village of River Grove, in Cook County, IL. SN=016-0697 — Executed Nov 26 New Copenhaver Construction, Inc. $777,979 ·
Jan 15, 2021 62M49 CookDistrict 1 Bridge Deck Overlay, Approach Slab Reconstruction, Joint Repairs and Substructure Repairs (793-FT) Improvement on 3151 Street over Salt Creek consist of Bridge Deck Overlay, Approach Slab Reconstruction, Joint Repairs and Substructure Repairs. Located in the Village of Westchester and Village of La Grange Park SN=016-0868 — Executed Nov 26 New Martam Construction Incorporated $1,166,915 ·
Jan 15, 2021 62M61 CookDistrict 1 Interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes. , Work consists of interconnecting various traffic signals in order to mitigate congestion and improve traffic flow along various arterial routes. — Executed Nov 26 New H & H Electric Co. $877,057 ·
Jan 15, 2021 62M80 CookDistrict 1 Bridge Deck Overlay, Joint Repairs and Substructure Repairs (1,449-FT.) Improvement on 25th Avenue over IHB Railroad consist of Bridge Deck Overlay, Joint Repairs and Substructure Repairs. Located in the Village of Franklin Park and Melrose Park in Cook County. — Executed Nov 26 New Martam Construction Incorporated $2,587,526 ·
Jan 15, 2021 62M90 CookDistrict 1 Cleaning and painting existing steel structures at 2 locations. 1st located on I-80 at Ridgeland Avenue (SN 016-0718) in the Village of Tinley Park. 2nd located on Torrence Avenue over CSXT and IHB Railroads (SN 016-0935) in the Village of Burnham, Cook. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $494,274 ·
Mar 5, 2021 61E91 CookDistrict 1 Widening US 14 to add southbound, right-turn lane for proposed Metra access road. Project begins at Klingenberg Lane to Metra Station Access Road in Barrington. — Executed Nov 26 New Campanella and Sons, Inc. $1,484,365 ·
Mar 5, 2021 61G22 CookDistrict 1 Replace the bridge carrying Brookfield Avenue over Salt Creek in Brookfield. — Executed Nov 26 New Lorig Construction Company $3,471,604 ·
Mar 5, 2021 61G57 CookDistrict 1 Construction of a multi-use path on the west side of US 12, from Central Road to Elk Boulevard in Des Plaines. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $2,386,230 ·
Mar 5, 2021 61G81 CookDistrict 1 Pavement reconstruction, storm sewer, sidewalks and pavment markings on 123rd Street from 76th Avenue to Harlem Avenue in Palos Heights. — Executed Nov 26 New Lindahl Brothers, Inc. $1,470,766 ·
Mar 5, 2021 61G92 CookDistrict 1 Full Depth reconstruction on Acacia Drive, beginning at the south intersection with Wolf Road and ending at the north intersection with Wolf Road, in the Village of Indian Head Park — Executed Nov 26 New Lindahl Brothers, Inc. $1,464,512 ·
Mar 5, 2021 62C52 CookDistrict 1 (3.57-Mile) Resurfacing project consisting of HMA surface removal, pavement patching, HMA resurfacing, ADA improvements and pavement marking on Dixie HWy. — Executed Nov 26 New Iroquois Paving Corporation $3,189,418 ·
Mar 5, 2021 62D14 CookDistrict 1 (4.8-Mile) of SMART overlay, milled rumble strips and ADA improvements on Palatine Road from IL 62 (Algonquin Road) to east of Roselle Road in the Villages of Barrington Hills, Hoffman Estates, Inverness, Palatine and South Barrington. — Executed Nov 26 New Builders Paving, LLC $1,698,000 ·
Mar 5, 2021 62H51 CookDistrict 1 Bridge rehab, ADA improvements and shared-use path on Cermak Road in the Villages of Broadview and Westchester (SN 016-0631, 016-0632, 016-0633). — Executed Nov 26 New Herlihy Mid-Continent Company $9,477,993 ·
Mar 5, 2021 62J27 CookDistrict 1 (2,589.74-Ft) Culvert removal and replacement, drainage improvements, roadway removal and replacement, earth excavation. landscaping, and erosion control at Farmers Creek over and at unnamed ditch. Located in the City of Des Plaines and Village of Niles in Cook County. — Executed Nov 26 New Lorig Construction Company $1,925,500 ·
Mar 5, 2021 62K88 CookDistrict 1 This is an ADA Improvement project located along various State maintained routes within the Village of Oak Park and City of Park Ridge in Cook County. — Executed Nov 26 New Capitol Cement Co., Inc. $1,234,644 ·
Mar 5, 2021 62L04 CookDistrict 1 Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston Niles and Evanston Townshi (2.53-Mile) Improvement on Church St from Gross Point to Dodge Ave consists of Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston Niles and Evanston Townships. , (2.53-Mile) This improvement on Church St from Gross Point to Dodge Ave consist of Smart Overlay and ADA Improvement in the Villages of Skokie and village of Evanston, Niles and Evanston Townships. — Executed Nov 26 New Builders Paving, LLC $1,720,000 ·
Mar 5, 2021 62L18 CookDistrict 1 2.5 miles of resurfacing, patching and ADA improvements on IL 53 / Hicks Road from US 14 (Northwest Highway) to Lake-Cook Road, in the Village of Palatine. — Executed Nov 26 New Builders Paving, LLC $2,518,000 ·
301–400 of 1,087‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.