Filtered by: County: Cook Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 21, 2022 | 61G71 | CookDistrict 1 | Roadway reconstruction and lighting on Proviso Drive from the Union Pacific Rail Yard entrance to Wolf Road in Berkeley. | — | Executed | R. W. Dunteman Company $2,659,791 · | ||
| Jan 21, 2022 | 61H24 | CookDistrict 1 | Resurfacing, streetscape, lighting and traffic signal improvements at various locations in Berwyn. | — | Executed | R. W. Dunteman Company $16,486,777 · | ||
| Jan 21, 2022 | 62H49 | CookDistrict 1 | (0.989-Mile) Bridge new deck, widening, bridge repair scour mitigation and lighting in the City of Countryside and the Villages of Willow Springs, Justice and Hodgkins. | — | Executed | Dunnet Bay Construction Company $21,386,753 · | ||
| Jan 21, 2022 | 62L09 | CookDistrict 1 | Full depth patching along Palatine Road from Quentin Road to Smith Street spanning a total length of 4,073 ft This project consists of full depth patching along Palatine Road from Quentin Road to Smith Street spanning a total length of 4,073 ft (0.77 Miles) in the Village of Palatine, Cook County. | — | Executed | M & J Underground Inc. $207,992 · | ||
| Jan 21, 2022 | 62M54 | CookDistrict 1 | (1,334-Ft) Bridge rehabilitation project on the four bridges that carry I-57 over I-80. The work includes deck overlay with latex concrete, substructure repair and reconstruction and patching of bridge approaches located within the City of Country Club Hills. | — | Executed | D. Construction, Inc. $5,296,504 · | ||
| Jan 21, 2022 | 62M84 | CookDistrict 1 | (7.63-Mile) Standard overlay, Class A patching, drainage, ITS improvements, and bridge deck sealing on Interstate 57 (I-57) between I-294 and IL 1 (Halsted St.), located within the City of Chicago and Villages of Calumet Park, Blue Island, Posen, Dixmoor and Riverdale. | — | Executed | Gallagher Asphalt Corporation & K-Five Construction Corporation & D. Construction, Inc. $32,635,797 · | ||
| Jan 21, 2022 | 62N35 | CookDistrict 1 | Intersection improvement and traffic signal modernization project on US Route 6/Illinois Route 83 (Torrence Avenue), approximately 2,640 feet north of the I- 80/94 (Kingery Expressway) overpass and extends in a north for 1,007 lineal feet within the Village of Lansing and City of Calumet City. | — | Executed | Gallagher Asphalt Corporation $969,778 · | ||
| Jan 21, 2022 | 62N71 | CookDistrict 1 | (1,569-Ft) Designed Overlay and ADA improvements along Addison Street from Halsted Street to US 41 (Lake Shore Dr.) in the City of Chicago. | — | Executed | Bigane Paving Company $733,790 · | ||
| Jan 21, 2022 | 62P16 | CookDistrict 1 | (3.007 Mile) Design Overlay and ADA ramp improvements from Brainard Avenue to 159th Street. Work also includes sidewalk and curb and gutter removal and replacement, detectable warnings. structure adjustments and pavement markings located in the city of Calumet City and the Village of Burnham. | — | Executed | D. Construction, Inc. $2,853,271 · | ||
| Jan 21, 2022 | 62P18 | CookDistrict 1 | Designed Overlay project on IL 43 (Harlem Ave.) at 26th Street and continues northerly direction for (4.49 mile) to south of IL 64 North Ave located in the City of Berwyn and the Villages of Forest Park, North Riverside, Oak Park, River Forest, and Riverside. | — | Executed | Arrow Road Construction Co. $5,762,151 · | ||
| Jan 21, 2022 | 62P23 | CookDistrict 1 | (378.5-Ft) Cleaning and painting designated steel surfaces of bridge structure carrying Ashland Ave over Calumet Sag Channel in the City of Blue Island and Village of Calumet Park. Calumet Township, SN 016-0 294. | — | Executed | Eagle Painting & Maintenance Company, Inc. $978,012 · | ||
| Jan 21, 2022 | 62P29 | CookDistrict 1 | (813-Ft) Bridge Preservation Project including partial bridge deck patching, approach slab scarification and overlay, expansion joints replacement, substructure repairs and underpass lighting replacement located on the bridge carrying 127th St over I-57 in the City of Calumet Park. | — | Executed | D. Construction, Inc. $922,791 · | ||
| Jan 21, 2022 | 62P56 | CookWillDistrict 1 | Cleaning and painting of steel bridge structures at 5 locations This project consists of cleaning and painting of steel bridge structures at 5 locations. SN-0016-0048 and 0049 structures carrying 1-57 NB and SB over RR, Rich Township, Cook County. SN-099-0005; 0286 and 0304 structures carrying 1-55 NB and SB over RR and creek, in Wilmington Township, Will County. | — | Executed | Eagle Painting & Maintenance Company, Inc. $444,000 · | ||
| Jan 21, 2022 | 62P57 | CookDistrict 1 | Cleaning and painting existing steel structures at 7 locations. Bridge structures are located along 1-290 (Einsenhower Expressway) from 25th Avenue to Circle Avenue in the Villages of Broadview, Bellwood, Maywood and and Forest Park. | — | Executed | Eagle Painting & Maintenance Company, Inc. $258,100 · | ||
| Jan 21, 2022 | 62P85 | CookDistrict 1 | Pigeon abatement on existing steel structures at 2 locations along 1-90/94 (Kennedy Expressway) at IL-19 (Irvi Improvement consists of pigeon abatement on existing steel structures at 2 locations along 1-90/94 (Kennedy Expressway) at IL-19 (Irving Park Road) in the City of Chicago in Cook County. SN 016-0115, SN 016-0116. | — | Executed | MYS, Incorporated $277,847 · | ||
| Jan 21, 2022 | 62P87 | CookDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Cook County The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Cook County. | — | Executed | Elgin Sweeping Services, Inc. $2,656,557 · | ||
| Jan 21, 2022 | 62P89 | CookDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Cook County The improvement consists of cleaning(sweeping) various arterial highways in District One throughout Cook County. | — | Executed | Elgin Sweeping Services, Inc. $2,242,234 · | ||
| Jan 21, 2022 | 62P90 | CookDistrict 1 | (1.13-Mile) Drainage improvements, culvert replacement, culvert removal, and ditch cleaning in Cook County. | — | Executed | K-Five Construction Corporation $444,444 · | ||
| Mar 11, 2022 | 61H14 | CookDistrict 1 | Reconstruction of Franklin Avenue from Runge Street to Mannheim Road in Franklin Park. | — | Executed | Plote Construction, Inc. $23,563,474 · | ||
| Mar 11, 2022 | 61H62 | CookDistrict 1 | Replace the bridge carrying Gladstone Street over Addison Creek, east of US 45 in Westchester. | — | Executed | Lorig Construction Company $1,139,974 · | ||
| Mar 11, 2022 | 62B87 | CookDistrict 1 | (1,284-Ft) Bridge girders cleaning and painting of the Ida B. Wells Drive (formerly: Congress Parkway) viaduct in the City of Chicago along I-290 Expressway. | — | Executed | Capital Industrial Services $2,393,320 · | ||
| Mar 11, 2022 | 62D30 | CookDistrict 1 | (3,470-Ft) Intersection improvement: channelization, PCC and HMA widening, traffic signal modernization, drainage and ADA improvements. Intersection of FAP 338: IL 59 and West Bartlet Road in the Village of Bartlett. | — | Executed | Alliance Contractors, Inc. $6,228,576 · | ||
| Mar 11, 2022 | 62G72 | CookDistrict 1 | (4,591-Ft) Standard Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK etc. Central Avenue from Devon Ave to Elston Ave in the City of Chicago. | — | Executed | Arrow Road Construction Co. $1,242,293 · | ||
| Mar 11, 2022 | 62H38 | CookDistrict 1 | (2,600-Ft) Resurfacing, drainage improvement, and retaining wall construction from Nicholas Drive to Western Avenue, also includes HMA milling and paving, PCC pavement removal and placement, and storm sewer and drainage structure installation located in the City of Des Plaines. | — | Executed | Benchmark Construction Co., Inc. $5,718,000 · | ||
| Mar 11, 2022 | 62J65 | CookDistrict 1 | Standard Overlay along Franklin Street from Cermak Road to 1-90 for a total length of 4280 This project consists of Standard Overlay along Franklin Street from Cermak Road to 1-90 for a total length of 4280.1 ft (.81 Miles) in the City of Chicago | — | Executed | MAT Construction Leasing, Inc. $1,768,897 · | ||
| Mar 11, 2022 | 62L19 | CookDistrict 1 | (1.987-Mile) Standard Overlay, ADA Improvements: HMA removal, pavement patching HMA resurfacing, curb ramps improvements etc. Loc.: FAU 2714: 25th Ave, I-290 (Eisenhower Expwy) to 26th St in the Villages of Broadview and Forest Park. | — | Executed | R. W. Dunteman Company $2,036,682 · | ||
| Mar 11, 2022 | 62M44 | CookDistrict 1 | (1.51-Mile) Standard overlay project consisting of hot-mix asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, ADA improvements and thermoplastic pavement marking on Ogden Avenue from Kedzie Avenue to Taylor Street in the City of Chicago. | — | Executed | Bigane Paving Company $1,996,353 · | ||
| Mar 11, 2022 | 62M45 | CookLakeDistrict 1 | (1.830-Mile) Designed Overlay improvement along Lake-Cook Road from Ela Road to Rue Touraine in the Villages of Deer Park and Lake Zurich. | — | Executed | Arrow Road Construction Co. $1,347,052 · | ||
| Mar 11, 2022 | 62M47 | CookLakeDistrict 1 | (2.60-Mile) Designed Overlay, ADA Improvements: HMA removal, pavement patching HMA resurfacing, curb ramps improvements, PMK. FAP 1270: Main Street from West of Hart Rd to Ela Rd in the Village of Barrington + Unincorp. areas in Cook and Lake Counties. | — | Executed | Arrow Road Construction Co. $2,917,919 · | ||
| Mar 11, 2022 | 62M51 | CookDistrict 1 | (293-Ft) Bridge deck overlay and bridge joint repair of the US 14/Peterson Ave. bridge over I-94 located in the City of Chicago. | — | Executed | Martam Construction Incorporated $1,456,919 · | ||
| Mar 11, 2022 | 62N34 | CookDistrict 1 | (643-Ft) Bridge deck overlay, expansion joint repairs, and approach slab replacement for the bridge carrying IL 83 over US 45 located in the Palos Township in Unincorporated Cook County. | — | Executed | Lorig Construction Company $1,149,988 · | ||
| Mar 11, 2022 | 62N74 | CookDistrict 1 | (5,002-Ft) Designed Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK. FAU2766: Harlem Avenue FAU 2766 from Oakton St. to Dempster St. in the Village of Niles. | — | Executed | Arrow Road Construction Co. $1,532,380 · | ||
| Mar 11, 2022 | 62N76 | CookDistrict 1 | (3,184-Ft) Overlay, ADA improvements, milled rumble strips. Location: Kean Road from IL-83 to 119th Street in the Village of Palos Park in Cook County. | — | Executed | Gallagher Asphalt Corporation $364,765 · | ||
| Mar 11, 2022 | 62N78 | CookDistrict 1 | (3.04-Mile) SMART overlay and ADA improvements on Ogden Avenue from IL 43 to 50th Avenue located in the City of Berwyn and Town of Cicero. | — | Executed | K-Five Construction Corporation $2,790,520 · | ||
| Mar 11, 2022 | 62P19 | CookDistrict 1 | (1.647-Mile) 3P standard overlay project on Glenwood Dyer Road from Gledwood Lansing to Stony Island Avenue that includes ADA curb ramp improvements, located in Village of Lynwood and Village of Glenwood. | — | Executed | K-Five Construction Corporation $1,657,117 · | ||
| Mar 11, 2022 | 62P60 | CookDistrict 1 | This is a site spot improvement (parking lot improvement), consisting of pavement, curb and gutter, sidewalk removal and replacement, drainage structures adjustment, subbase gran. material and HMA surface/ binder course Located at the Kennedy Maintenance Yard E-24, 5027 N. Central Ave in the City of Chicago. | — | Executed | M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company $561,816 · | ||
| Mar 11, 2022 | 62P68 | CookDistrict 1 | (1,900-Ft) Dry land bridge extension; replacement of existing sidewalk and shared-use path; and aesthetic landscaping of US 6 / IL 7 (159th St) from 104th Ave to east located in the Village of Orland Park. | — | Executed | D. Construction, Inc. $1,799,094 · | ||
| Mar 11, 2022 | 62P80 | CookDistrict 1 | (200-Ft) Partial and full depth deck repairs to the structure that carries Wayman St over 1-90/94. Also included are longitudinal joint closure, application of protective coat, cleaning and sealing of transverse joints, and installation of temporary protective shield located in the City of Chicago. | — | Executed | Lorig Construction Company $201,779 · | ||
| Mar 11, 2022 | 62P83 | CookDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying 130th St over RR (SN 016-2434) a This improvement consists of cleaning and painting designated steel surfaces of bridge structures carrying 130th St over RR (SN 016-2434) and over 1-94 (SN 016-2600) in the City of Chicago, Hyde Park Township, Cook Co. | — | Executed | Capital Industrial Services $783,300 · | ||
| Mar 11, 2022 | 62R33 | CookDistrict 1 | (251-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-57expressway from I-94 (Dan Ryan Expwy) to I-80. | — | Executed | Mosley Construction 1, LLC $287,144 · | ||
| Mar 11, 2022 | 62R34 | CookWillDistrict 1 | Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-80 expressway from I-294 to I-355 (133.2-Mile) The improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-80 expressway from I-294 to I-355. | — | Executed | MYS, Incorporated $138,395 · | ||
| Mar 11, 2022 | 62R35 | CookLakeDistrict 1 | (130.8-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-94 (Edens Expwy)/ US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). | — | Executed | MYS, Incorporated $135,901 · | ||
| Mar 11, 2022 | 62R36 | CookDuPageDistrict 1 | (185.6-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-290 expressway from IL 83 (Kingery Hwy) to Austin Blvd. | — | Executed | MYS, Incorporated $208,772 · | ||
| Mar 11, 2022 | 62R37 | CookDuPageDistrict 1 | (209-Mile) Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on I-290 expressway from Lake Cook Rd to IL 83 (Kingery Hwy). | — | Executed | MYS, Incorporated $219,241 · | ||
| Apr 29, 2022 | 61H38 | CookDistrict 1 | Resurfacing Jackson Boulevard from Madison Street to Des Plaines Avenue in Forest Park. | — | Executed | Lindahl Brothers, Inc. $485,407 · | ||
| Apr 29, 2022 | 61H47 | CookDistrict 1 | Storm sewer construction, ADA sidealks and traffic signal pedestrian upgrates Roadway reconstruction on Central Avenue from 47th Street to Burlington Avenue and storm sewer construction with combined sewer separation on Central Avenue and Elm Street. Work along 47th Street from Central Avenue to Flagg Creek consists of storm sewer construction, ADA sidealks and traffic signal pedestrian upgrates. Project is located in Western Springs. | — | Executed | Berger Excavating Contractors, Inc. $4,645,651 · | ||
| Apr 29, 2022 | 61H57 | CookDistrict 1 | Resurfacing Meacham Road from IL 58 to IL 72 in Schaumburg. | — | Executed | Plote Construction, Inc. $1,865,189 · | ||
| Apr 29, 2022 | 61H64 | CookDistrict 1 | Resurfacing Lawndale Avenue from Touhy Avenue to Central Park Avenue, Central Park Avenue from Lawndale Avenue to Northeast Parkway, and Northeast Parkway from Central park Avenue to McCormick Boulevard in Lincolnwood. | — | Executed | J. A. Johnson Paving Company $537,537 · | ||
| Apr 29, 2022 | 61H67 | CookDistrict 1 | Resurfacing Shields Avenue from Maple Avenue to Custer Avenue in Broofield. | — | Executed | K-Five Construction Corporation $780,544 · | ||
| Apr 29, 2022 | 61H71 | CookDistrict 1 | Roadway widening and resurfacing, and construction of a multi-use path along Chestnut Avenue from Lehigh Avenue to Waukegan Road in Glenview. | — | Executed | Alliance Contractors, Inc. $5,262,614 · | ||
| Apr 29, 2022 | 62G03 | CookDistrict 1 | Traffic Signal Modernization and ADA Sidewalk Ramps at the intersection of Western Ave@ 139th St located in the Village of Posen, Village of Dixmoor, and the City of Blue Island. | — | Executed | Hecker and Company, Inc. $509,914 · | ||
| Apr 29, 2022 | 62G71 | CookDistrict 1 | (4,569 Ft) Designed Overlay and ADA Improvements located in the City of Chicago in Cook County. Addison Street from Avondale Ave to Sacramento Ave. | — | Executed | MAT Construction Leasing, Inc. $1,320,682 · | ||
| Apr 29, 2022 | 62H26 | CookDistrict 1 | (296-Ft) Removal and replacement of culvert located on Dixie Hwy over ditch (1 Mile N of US 6) located in the City of Harvey, Cook County. | — | Executed | D. Construction, Inc. $1,802,727 · | ||
| Apr 29, 2022 | 62M46 | CookDistrict 1 | (2.73-Mile) Designed and Standard Overlay Project on Oakton Street, begins Approx. 150 feet W. of Busse Highway and extends E. for 15,023 feet (2.85 miles ) to Waukegan Rd located in the City of Park Ridge and Village of Niles. | — | Executed | Arrow Road Construction Co. $3,917,529 · | ||
| Apr 29, 2022 | 62M48 | CookDistrict 1 | (4,688-Ft) Standard Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK. FAU 2772: Waukegan Road from IL 43 (Oakton St) to IL 21 (Milwaukee Ave) in the Village of Niles. | — | Executed | Plote Construction, Inc. $1,160,466 · | ||
| Apr 29, 2022 | 62M59 | CookDistrict 1 | (1032-Ft) Channelization and pavement widening to add a right turn lane, traffic signal modernization, bridge deck overlay and joint repair located on IL 53 (Biesterfield Rd.) at the I-290 northbound ramp within Elk Grove Village. | — | Executed | MYS, Incorporated $1,748,339 · | ||
| Apr 29, 2022 | 62N07 | CookDuPageLakeDistrict 1 | This is a drainage improvement on various State maintained routes within the Cities of Elmhurst and Waukegan and the Villages of Glendale Heights, Lemont, and Mount Prospect in Cook, DuPage and Lake Counties. The routes are Kensington Road, IL 137, I-290, IL 64, and McCarthy Road / 123rd Street. | — | Executed | Martam Construction Incorporated $1,608,899 · | ||
| Apr 29, 2022 | 62N75 | CookDistrict 1 | Standard overlay resurfacing on Hicks Road approx. 140 feet S. of Kirchoff Rd. and extends in a northerly direction approx. 2033 feet to approx. 20 feet north of Euclid Avenue located in the Village of Palatine. | — | Executed | J. A. Johnson Paving Company $532,000 · | ||
| Apr 29, 2022 | 62N77 | CookDistrict 1 | (2.41-Mile) Smart Overlay, ADA Improvements; Location: FAU 1332, Oakton St from IL 83 (Elmhurst Rd) to US 12/45 (Lee St/Mannheim Rd), in the City of Des Plaines in Cook County. | — | Executed | Arrow Road Construction Co. $3,382,411 · | ||
| Apr 29, 2022 | 62N98 | CookDistrict 1 | (2.51-Mile) Standard Overlay, ADA Improvements: HMA removal, pavement patching, HMA resurfacing, curb ramps improvements, PMK. FAU 2845: Western Avenue from US 30/ Lincoln Hwy to Steger Rd in the Villages of Chicago Height, Park Forest. | — | Executed | Iroquois Paving Corporation $2,684,806 · | ||
| Apr 29, 2022 | 62N99 | CookDistrict 1 | (2.4-Mile) Standard overlay and ADA improvements on Grand Ave. from Elm St to East of 77th Ct and 74th Ct to IL 43 located in the Villages of Franklin Park, River Grove, and Elmwood Park in Cook County. | — | Executed | K-Five Construction Corporation $3,113,352 · | ||
| Apr 29, 2022 | 62P10 | CookDistrict 1 | (1320-Ft.) Bridge deck replacement to the structure carrying 175th Street Over 1-57. Scope of work includes bridge deck replacement, substructure repairs, steel repairs and steel cleaning and painting located in the City of Country Club Hills. | — | Executed | P. T. Ferro Construction Co. $3,123,305 · | ||
| Apr 29, 2022 | 62P17 | CookDistrict 1 | Designed overlay resurfacing with ADA improvements on River Oaks Drive, beginning at Price Ave. and continuing in the southeasterly direction for approx. 3,500 ft., ending at State Line Rd located in the City of Calumet City. | — | Executed | D. Construction, Inc. $878,988 · | ||
| Apr 29, 2022 | 62P30 | CookDistrict 1 | (1.04-Mile) Designed Overlay on Lehigh Avenue from Oakton St. to Lehigh Ave. The project is located within the Villages of Morton Grove and Niles. | — | Executed | Builders Paving, LLC $868,000 · | ||
| Apr 29, 2022 | 62P32 | CookDistrict 1 | (2.056-Mile) Designed Overlay, ADA Improvements: HMA removal, pavement patching , HMA resurfacing, curb ramps improvements, PMK. FAU 1332: Oakton St, from Waukegan Rd to Long Ave in the Villages of Niles, Morton Grove and Skokie. | — | Executed | Builders Paving, LLC $3,626,380 · | ||
| Apr 29, 2022 | 62P45 | CookDistrict 1 | (3.05-Mile) Water main replacement, intersection reconstruction, roadway reconstruction of Wood St / Ashland Ave from north of Thornton Rd to 138th St, bridge rehabilitation, sidewalk, shared-use path roadway lighting, and aesthetic landscaping located in the City of Harvey, Villages of Dixmoor and Riverdale. | — | Executed | Judlau Contracting, Inc. $41,677,110 · | ||
| Apr 29, 2022 | 62P47 | CookLakeMcHenryDistrict 1 | Designed overlay resurfacing on County-Line Rd., beginning at E. of Haegers Bend Rd. and continuing in the easterly direction for approximately 23483 feet (4.44 miles) to 300 ft west of Hart Rd. located in the Village of Barrington Hills. | — | Executed | Plote Construction, Inc. $2,590,116 · | ||
| Apr 29, 2022 | 62P53 | CookDistrict 1 | (200-Ft) Wingwall replacement and culvert repairs of the culvert carrying Wolf Road over Addition Creek in the City of Northlake, Cook County. | — | Rejected | MYS, Incorporated $306,804 · | ||
| Apr 29, 2022 | 62P82 | CookDuPageDistrict 1 | Cleaning and painting existing steel structures at 4 locations Improvement consists of cleaning and painting existing steel structures at 4 locations. Location 1 is at I-290 at IL 58 (SN 016-0980) in Rolling Meadows and Scahumburg. Location 2 is at 25th Ave at IHB RR (SN 016-1011) in Melrose Park and Franklin Park. Location 3 is at 1-290 and 1-355 (SN 022-0092) in Addison. Location 4 is at I-290 ramp to I-355 (SN022-0094) in Addison. | — | Executed | Eagle Painting & Maintenance Company, Inc. $1,176,437 · | ||
| Apr 29, 2022 | 62R45 | CookDuPageDistrict 1 | Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to IL 43 (180-Mile) Improvement consists of Litter/ Debris Removal from edge of pavement to the Pedestrian Barrier on 1-55 expressway from 1-355 to IL 43 (Harlem Ave). | — | Executed | Winston's Image LLC $186,480 · | ||
| Jun 17, 2022 | 46593 | CookDistrict 1 | Applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width This work shall consist of applying water borne, lead free, white and yellow paint pavement marking lines of 4, 6, and 8 inches in width. | — | Executed | Preform Traffic Control Systems, Ltd. $1,009,200 · | ||
| Jun 17, 2022 | 60T46 | CookDistrict 1 | 115 swing gates, 6 arresting barriers and 4 nodal buildings ComCenter controls (5.45-Mile) Kennedy Expressway Reversible lanes. REVLAC System rehabilitation. The REVLAC system consists of 115 swing gates, 6 arresting barriers and 4 nodal buildings ComCenter controls. Fiber optic cables, and Programmable Logic Controllers (PLC) | — | Executed | John Burns Construction Company $31,861,111 · | ||
| Jun 17, 2022 | 60X98 | CookDistrict 1 | (1.39-Mile) Planting of various landscaping features within the 1-90 and 1-290 expressway corridors, installation of various aesthetics features as well as creation of green spaces at selected locations to enhance the overall corridor. | — | Rejected | Martam Construction Incorporated $8,491,788 · | ||
| Jun 17, 2022 | 61D99 | CookDistrict 1 | Rehabilitate Structure 016-0194 carrying IL 1 over the CSX Railroad and Stucture 016-0195 carrying IL 1 over the Indiana Harbor Belt Railroad. Includes construction of a shared use path. Project is located between Jackson Street and 142nd Street in Riverdale. | — | Rejected | |||
| Jun 17, 2022 | 61H44 | CookDistrict 1 | Reconstruct Rand Road from Isabella Street to Albany Lane, reconstruct Mount Prospect Road to Westgate Road, and reconstruct Mount Prospect Road from Central Road to Rand Road. | — | Executed | Alliance Contractors, Inc. $8,264,103 · | ||
| Jun 17, 2022 | 61H65 | CookDistrict 1 | Resurface National Parkway from Woodfield Road to Higgins Road in Schaumburg. | — | Rejected | A Lamp Concrete Contractors, Inc. $789,949 · | ||
| Jun 17, 2022 | 61H68 | CookDistrict 1 | Resurfacing, sidewalk construction, curb and gutter replace, pavement markings, on Springinsguth Road from Bode Road to Schaumburg Road in Schaumburg. | — | Executed | Plote Construction, Inc. $921,953 · | ||
| Jun 17, 2022 | 61H69 | CookDistrict 1 | Realignment of shared-use path, pavement reconstruction, and retaining wall along Green Bay Trail at Hazel Avenue in Glencoe. | — | Executed | Alliance Contractors, Inc. $570,570 · | ||
| Jun 17, 2022 | 61H70 | CookDistrict 1 | Resurface Washington Avenue from Hemman Avenue to Prairie Avenue in Brookfield. | — | Executed | K-Five Construction Corporation $1,451,412 · | ||
| Jun 17, 2022 | 61H72 | CookDistrict 1 | Resurfacing Bode Road from Barrington Road to North Springinsguth Road in Hoffman Estates and Schaumburg | — | Executed | Plote Construction, Inc. $1,760,185 · | ||
| Jun 17, 2022 | 61H77 | CookDistrict 1 | Resurface Biesterfield Road from west village limits to Meacham Road in Elk Grove Village. | — | Executed | R. W. Dunteman Company $829,750 · | ||
| Jun 17, 2022 | 61H78 | CookDistrict 1 | Construct an aggregate and PCC shared-use path, inlcudes curb and gutter, traffic signal enhancements, pavement markings and signing on the west side of East River Road at the intersection with Bryn Mawr Avenue to Devon Avenue in Chicago and Park Ridge. | — | Rejected | Landmark Contractors, Inc. $1,795,974 · | ||
| Jun 17, 2022 | 61H82 | CookDistrict 1 | Construction of an HMA shared-use path, PCC sidewalk, sheet pile wall, pedestrian traffic signals, storm sewer, guardrail, and pavement markings along Oakton Street from Caldwell Avenue to Lehigh Avenue, and along Caldwell Avenue from Oakton Street to Vapor Lane in Morton, Skokie and Niles. | — | Executed | A Lamp Concrete Contractors, Inc. $1,639,752 · | ||
| Jun 17, 2022 | 61H84 | CookDistrict 1 | Construction of a shared-use path, includes a reinforced slope system, drainage improvements, culvert headwall modifications, guardrail installation and pavement markings on the east side of 104th Avenue to 159th Street to 163rd Place in Orland Park. | — | Rejected | D. Construction, Inc. $2,171,956 · | ||
| Jun 17, 2022 | 62L11 | CookDistrict 1 | (2,568-Ft) Standard Overlay, ADA ramp improvements and new HMA Shoulders, located from Willow Rd to Old Willow Rd in the Villages of Northbrook and Glenview in Cook County. | — | Executed | J. A. Johnson Paving Company $654,540 · | ||
| Jun 17, 2022 | 62N43 | CookDistrict 1 | (5,878-Ft) SMART overlay and ADA improvements on US 12/20/45 (La Grange Rd) from 31st St to north of Cermak Rd, located in the Village of La Grange Park and Westchester in Cook County. | — | Executed | K-Five Construction Corporation $1,190,920 · | ||
| Jun 17, 2022 | 62N72 | CookDistrict 1 | (2.211-Mile)Designed Overlay, Shoulders, Milled Rumble Strips and ADA Improvements, Location of work: Project located from Muskegon Ave to State Line Rd in the Village of Burnham and the City of Chicago in Cook County. | — | Executed | D. Construction, Inc. $3,486,258 · | ||
| Jun 17, 2022 | 62P54 | CookDistrict 1 | (2,370-Ft) Retaining wall repair and concrete barrier wall replacement located along EB-I-290 between South Central Ave. and South Laramie St. in the City of Chicago. | — | Executed | Plote Construction, Inc. $2,296,339 · | ||
| Jun 17, 2022 | 62P55 | CookDistrict 1 | (2007.6-Ft) Structural rehabilitation and substructure repairs of three bridges earring 1-94 over Little Calumet River and over CSXTand IHB Railroad in the City of Dolton and the City of Calumet City. | — | Executed | ICC Group Inc. $697,200 · | ||
| Jun 17, 2022 | 62P59 | CookDistrict 1 | Improvement is located at the IDOT I-57 maintenance yard at 16010 S. Crawford Ave. within the City of Markham in Cook County includes pavement removal, pavement patching, new drainage structures and storm sewer and installation of hot-mix asphalt and pcc pavement and final pavement markings. | — | Executed | Gallagher Asphalt Corporation $720,206 · | ||
| Jun 17, 2022 | 62P72 | CookDuPageDistrict 1 | Trombone Mast Arm Replacement at various locations in District 1. | — | Executed | H & H Electric Co. $993,648 · | ||
| Jun 17, 2022 | 62P84 | CookDistrict 1 | A culvert repair and rock fill of the culvert culvert carrying IL 171 0 This improvement consists of a culvert repair and rock fill of the culvert culvert carrying IL 171 0.4 miles west of 95th St in the Village of Willow Springs in Cook County. | — | Executed | Scanlon Excavating & Concrete, Inc. $96,015 · | ||
| Jun 17, 2022 | 62R32 | CookDistrict 1 | Bridge beam repairs for structure located on Touhy Avenue over Des Plaines River in the City of Park Ridge, Co (263.3-Ft) Improvement consist of bridge beam repairs for structure located on Touhy Avenue over Des Plaines River in the City of Park Ridge, Cook County. | — | Executed | Path Construction Company, Inc. $458,553 · | ||
| Jul 15, 2022 | 62N48 | CookWillDistrict 1 | (6.47-Mile) Crack and Joint Sealing. streiff ln to scrementi lane in Will and Cook Counties. | — | Executed | Freehill Asphalt, Inc. $318,776 · | ||
| Jul 15, 2022 | 62N64 | CookDistrict 1 | Crack and joint sealing (4.8-Mile) This improvement consists of crack and joint sealing. The project is in the Villages of Barrington Hills, Barrington, Inverness and Palatine. | — | Executed | Freehill Asphalt, Inc. $213,224 · | ||
| Jul 15, 2022 | 62R56 | CookDistrict 1 | Bridge beam repairs located on IL 171 from Joliet Rd to the Sanitary Ship Canal in the Villages of McCook and (1,827-Ft) The improvement consists of bridge beam repairs located on IL 171 from Joliet Rd to the Sanitary Ship Canal in the Villages of McCook and Summit in Cook County. | — | Executed | S & J Construction Co., Inc. $1,144,508 · | ||
| Aug 5, 2022 | 61H87 | CookDistrict 1 | Construction of an aggregate and HMA shared-use path to include a boardwalk structure, pedestrian truss stucture and traffic signal modernization. Project is Segment 3 of the Des Plaines River Trail from south of Lawrence Avenue to the Bryn Mawr Bike Bridge over the Des Plaines River in Chicago. | — | Executed | Copenhaver Construction, Inc. $7,213,329 · | ||
| Aug 5, 2022 | 62F75 | CookWillDistrict 1 | (1.24-Mile) Standard Overlay, ADA, Culvert Repairs in Orland Park and Mokena. | — | Executed | D. Construction, Inc. $2,049,959 · | ||
| Aug 5, 2022 | 62N68 | CookDistrict 1 | (9.21-Mile) Crack and joint sealing; Palos Heights, Palos Hills, Palos Park and Alsip. | — | Executed | Denler, Inc. $437,582 · | ||
| Aug 5, 2022 | 62N81 | CookDistrict 1 | (22,113-Ft) Designed Overlay, ADA Improvements and Rumble Strip located on Willow Springs Road from IL. 171 (Archer Ave) to North of 55th St. in Cook County. | — | Executed | K-Five Construction Corporation $3,271,013 · |
1–100 of 115Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.