Contact information
- tweger@coppellconst.com
- Phone
- (940) 995-3101
- Fax
- (940) 995-2416
- Address
- 210 N BROAD ST., ST. JO, TX 76265
- TxDOT prequalification
- Construction qualified
129BidsNov 3, 2016 to Nov 4, 2026
22Wins (low bidder)
17.1%Win rate
$61,533,722Total won
Competitor scorecard
Last 5 years in Texas15.9%Win rate11 of 69 bids
+11.1%Average bid vs estimate
-6.7%Winning bids vs estimate
+26.6%Over the low bid when they loseAverage field: 7.0 bidders
| Head to head | Times met | Beat them | Lost to them | Record |
|---|---|---|---|---|
| HODGES AND SON CONSTRUCTION COMPANY, INC. | 50 | 23 | 27 | 46% |
| EARTH BUILDERS, L.P. | 36 | 25 | 11 | 69% |
| GILVIN-TERRILL, LTD. | 22 | 20 | 2 | 91% |
| SKYLINE BRIDGE LLC | 17 | 2 | 15 | 12% |
| ALTUS CONSTRUCTION LLC | 16 | 6 | 10 | 38% |
| THK CONSTRUCTION LLC | 15 | 6 | 9 | 40% |
| SCOTT TUCKER CONSTRUCTION COMPANY, LLC | 14 | 6 | 8 | 43% |
| STX CIVIL | 12 | 5 | 7 | 42% |
| TEXAS STEEL INDUSTRIAL PLACING, LLC | 12 | 3 | 9 | 25% |
| C. E. BARKER, LTD. | 11 | 9 | 2 | 82% |
| Let date | CCSJ | Project | Rank | Their bid | Low bid | vs low |
|---|---|---|---|---|---|---|
| Nov 4, 2026 | 6508-43-001 | FY27 Bridge Preventative MaintenanceDonley · Childress | 4 of 16 | $832,395 | $701,941BLACKSMITH VENTURES LLC | +18.6% |
| Nov 3, 2026 | 0168-09-191 | IH 27 NB/WESTERN AVE BRG FY 27 BMIPRandall · Amarillo | 1 of 8 | $5,800,486 | $5,800,486 | Won |
| Nov 3, 2026 | 6508-47-001 | FY27 Supplemental BPM 1Childress · Childress | 4 of 15 | $912,076 | $792,433ICOS MANAGEMENT, LLC | +15.1% |
| Oct 13, 2026 | 6510-75-001 | 6510-75-001 Bridge Repair CalloutEctor · Odessa | 3 of 5 | $921,400 | $608,725REAR CONTRACTORS LLC | +51.4% |
| Oct 7, 2026 | 0022-01-034 | US 90 Sanderson Canyon Bridge @ UPRRTerrell · Odessa | 4 of 7 | $9,324,743 | $6,768,348RELMCO, INC. | +37.8% |
| Oct 7, 2026 | 6493-26-001 | FY2026 - BPM Jack & Wise CountiesWise · Fort Worth | 3 of 7 | $1,383,818 | $1,040,615SHALOM SERVICES CORPORATION | +33.0% |
| Oct 6, 2026 | 6499-74-001 | MISCELLANEOUS BRIDGE REPAIR (BPM 2027)Comanche · Brownwood | 8 of 11 | $1,306,824 | $727,661TAYLOR BRIDGE LLC | +79.6% |
| Sep 3, 2026 | 0844-04-011 | FM 1547 @ Buck CreekCollingsworth · Childress | 1 of 7 | $3,017,334 | $3,017,334 | Won |
| Aug 6, 2026 | 0902-20-238 | CR 1590; at Big Sandy CreekWise · Fort Worth | 5 of 8 | $1,140,751 | $961,912HODGES AND SON CONSTRUCTION… | +18.6% |
| Aug 5, 2026 | 0902-38-134 | CR 452/Dennis Rd: At Patrick CreekParker · Fort Worth | 4 of 10 | $1,783,475 | $1,531,854HODGES AND SON CONSTRUCTION… | +16.4% |
| Jun 3, 2026 | 0067-18-010 | US 87 NBI 05-219-0-0067-03-135Swisher · Lubbock | 4 of 9 | $3,041,557 | $2,742,796PATHFIELD INVESTMENTS LLC | +10.9% |
| Jun 2, 2026 | 0105-04-047 | SH 70 @ Quitaque RiverMotley · Childress | 5 of 9 | $4,044,923 | $3,403,214SKYLINE BRIDGE LLC | +18.9% |
| Apr 8, 2026 | 0908-23-058 | REPLACE BRIDGE CR 305 @ ALKALI CRK TRIBFisher · Abilene | 6 of 7 | $2,418,193 | $1,880,830TUCAN CONTRACTING, LLC | +28.6% |
| Apr 8, 2026 | 0902-51-029 | CS; OLD GRANBURY RD OVER WALNUT CRKHood · Fort Worth | 8 of 8 | $945,897 | $632,977GARRET SHIELDS INFRASTRUCTU… | +49.4% |
| Apr 7, 2026 | 0908-23-045 | CR 412 AT COTTONWOOD CRK TRIBFisher · Abilene | 5 of 6 | $4,172,547 | $3,158,064SKYLINE BRIDGE LLC | +32.1% |
| Mar 5, 2026 | 1097-01-018 | Loring Creek ReliefHunt · Paris | 12 of 12 | $3,038,489 | $2,085,509HODGES AND SON CONSTRUCTION… | +45.7% |
| Mar 4, 2026 | 0904-02-050 | N HUGHES ST @ BNSF RR OFF-SYSTEM BRIDGEPotter · Amarillo | 5 of 6 | $7,389,017 | $4,519,471ALTUS CONSTRUCTION LLC | +63.5% |
| Feb 5, 2026 | 0902-49-074 | CR 351; at Bell BranchErath · Fort Worth | 11 of 12 | $875,581 | $625,625DELGADO'S CONTRACTORS, LLC | +40.0% |
| Feb 4, 2026 | 0904-02-051 | IRWIN RD @ E AMA CREEK OFF-SYSTEM BRIDGEPotter · Amarillo | 4 of 7 | $2,529,275 | $1,996,761L A FULLER & SONS CONSTRUCT… | +26.7% |
| Feb 4, 2026 | 0902-49-069 | CR; CR 218 OVER DUFFAU CRKErath · Fort Worth | 8 of 9 | $1,510,353 | $976,095THK CONSTRUCTION LLC | +54.7% |
| Feb 4, 2026 | 0902-20-097 | CR; ROBERTS RD AT PANTHER CREEKWise · Fort Worth | 6 of 9 | $1,068,061 | $875,772THK CONSTRUCTION LLC | +22.0% |
| Dec 3, 2025 | 0925-15-016 | CR 384 @ Duck CreekDickens · Childress | 4 of 5 | $1,320,787 | $1,016,531STX CIVIL | +29.9% |
| Dec 3, 2025 | 0974-03-014 | FM 604 AT JIM NED CREEKTaylor · Abilene | 8 of 9 | $4,677,220 | $2,697,516J. H. STRAIN & SONS, INC. | +73.4% |
| Nov 6, 2025 | 0908-23-049 | CR 122 AT CLEARFORK BRAZOS RIVERFisher · Abilene | 1 of 8 | $1,728,544 | $1,728,544 | Won |
| Oct 9, 2025 | 0043-06-097 | US 70 at FM 1763Wilbarger · Wichita Falls | 2 of 5 | $3,637,907 | $3,176,311ALTUS CONSTRUCTION LLC | +14.5% |
| Oct 9, 2025 | 0908-20-029 | REPLACE BRIDGE CR 314 at DRAWNolan · Abilene | 4 of 8 | $1,044,657 | $918,429DELGADO'S CONTRACTORS, LLC | +13.7% |
| Oct 8, 2025 | 0903-06-027 | Hancock St at Dry Frk Lttle WichitaClay · Wichita Falls | 6 of 8 | $1,264,257 | $1,149,814HODGES AND SON CONSTRUCTION… | +10.0% |
| Oct 8, 2025 | 0903-30-047 | CR 238 (Sign CR 128W) at Paradise CreekWilbarger · Wichita Falls | 5 of 5 | $1,777,400 | $1,424,111SKYLINE BRIDGE LLC | +24.8% |
| Sep 5, 2025 | 1747-02-017 | REPLACE FM 1835 BRIDGE DOUBLE MTN FORKStonewall · Abilene | 5 of 10 | $5,402,561 | $3,884,350HODGES AND SON CONSTRUCTION… | +39.1% |
| Aug 8, 2025 | 0902-38-136 | McVoid Rd: at Tributary of Walnut CreekParker · Fort Worth | 8 of 8 | $1,311,653 | $829,673WESTFIELD INSURANCE COMPANY | +58.1% |
| Jul 2, 2025 | 0982-05-011 | FM 923 at Bush Knob CrThrockmorton · Wichita Falls | 7 of 8 | $887,640 | $728,607C & W SOUTHERN LLC | +21.8% |
| Jul 1, 2025 | 0903-15-106 | CR 258/SIGN CR 341 at DrawCooke · Wichita Falls | 4 of 8 | $2,690,057 | $2,437,821THK CONSTRUCTION LLC | +10.3% |
| Jun 5, 2025 | 0925-10-037 | CR 20 @ Lelia Lake Creek DonleyDonley · Childress | 6 of 10 | $1,057,371 | $954,735SKYLINE BRIDGE LLC | +10.8% |
| Jun 5, 2025 | 0902-49-072 | CR 454 @ Bosque RiverErath · Fort Worth | 5 of 9 | $1,063,681 | $866,897STX CIVIL | +22.7% |
| Jun 4, 2025 | 0909-29-047 | BR | @ Leon River | Map #206Hamilton · Waco | 1 of 11 | $4,196,407 | $4,196,407 | Won |
| Jun 4, 2025 | 0385-02-030 | FM 4; at Weaver BranchHood · Fort Worth | 6 of 7 | $3,186,926 | $2,382,295STX CIVIL | +33.8% |
| May 1, 2025 | 0092-13-031 | BI 45-F at Post Oak CreekNavarro · Dallas | 9 of 10 | $4,861,707 | $3,850,000PMCO CONSTRUCTION LLC | +26.3% |
| Apr 4, 2025 | 0067-09-033 | 050960006709062NB & 050960006709063SBHale · Lubbock | 1 of 6 | $6,813,363 | $6,813,363 | Won |
| Mar 5, 2025 | 1094-04-010 | FM 731; @ VILLAGE CREEKJohnson · Fort Worth | 2 of 3 | $3,741,531 | $3,569,154WESTFIELD INSURANCE COMPANY | +4.8% |
| Mar 4, 2025 | 0005-06-125 | SH 350 BRIDGE AT I-20Howard · Abilene | 5 of 6 | $15,757,313 | $14,287,270RAGLE CONSTRUCTION, INC. | +10.3% |
| Mar 4, 2025 | 1337-01-026 | FY 26 BSSP-HR SH 23 Gilaloo Creek BridgeLipscomb · Amarillo | 2 of 5 | $21,093,134 | $18,726,656EARTH BUILDERS, L.P. | +12.6% |
| Feb 7, 2025 | 0903-00-128 | FY 25 District wide Bridge PMWichita · Wichita Falls | 8 of 8 | $6,118,436 | $3,651,021THK CONSTRUCTION LLC | +67.6% |
| Feb 7, 2025 | 0275-02-075 | BI 40D EB Bridge ReplacementCarson · Amarillo | 2 of 6 | $10,755,504 | $9,874,035ALTUS CONSTRUCTION LLC | +8.9% |
| Jan 7, 2025 | 0283-03-024 | SH 79 Str 03-005-0283-03-005 Repl Culv MArcher · Wichita Falls | 5 of 6 | $4,100,121 | $3,345,238SKYLINE BRIDGE LLC | +22.6% |
| Nov 6, 2024 | 0902-40-032 | CAMPSEY RD OVER TRIB OF CROOKED CREEKJack · Fort Worth | 3 of 6 | $1,019,141 | $788,118YOKO EXCAVATING, LLC | +29.3% |
| Apr 4, 2024 | 0157-04-056 | BRIDGE REPLACEMENTHaskell · Abilene | 1 of 6 | $4,673,134 | $4,673,134 | Won |
| Mar 5, 2024 | 0090-05-107 | BRIDGE REPLACEMENTPotter · Amarillo | 2 of 4 | $10,650,047 | $10,246,890ALTUS CONSTRUCTION LLC | +3.9% |
| Mar 5, 2024 | 1709-02-021 | BRIDGE REPLACEMENTFannin · Paris | 4 of 4 | $3,769,498 | $2,948,142HIGHWAY 19 CONSTRUCTION LLC | +27.9% |
| Mar 5, 2024 | 6460-74-001 | BRIDGE REPAIRHardeman · Childress | 11 of 12 | $901,080 | $491,426ICOS MANAGEMENT, LLC | +83.4% |
| Feb 1, 2024 | 0090-05-108 | BRIDGE REPLACEMENTPotter · Amarillo | 2 of 2 | $10,188,313 | $9,782,901GILVIN-TERRILL, LTD. | +4.1% |
| Dec 6, 2023 | 0908-27-006 | BRIDGE REPLACEMENTKent · Abilene | 2 of 3 | $880,127 | $878,015EARTH BUILDERS, L.P. | +0.2% |
| Dec 5, 2023 | 0518-01-020 | BRIDGE REPLACEMENTMitchell · Abilene | 4 of 4 | $1,609,037 | $1,415,995DELGADO'S CONTRACTORS, LLC | +13.6% |
| Nov 2, 2023 | 1360-01-030 | BRIDGE REPLACEMENTJones · Abilene | 1 of 5 | $1,671,854 | $1,671,854 | Won |
| Nov 1, 2023 | 0003-06-098 | BRIDGE REPLACEMENTReeves · Odessa | 2 of 2 | $18,369,268 | $16,682,424DAN WILLIAMS COMPANY | +10.1% |
| Sep 7, 2023 | 0901-32-103 | BRIDGE REPLACEMENTFannin · Paris | 6 of 6 | $3,380,877 | $2,295,795THK CONSTRUCTION LLC | +47.3% |
| Aug 3, 2023 | 0844-03-013 | BRIDGE REPLACEMENTCollingsworth · Childress | 3 of 5 | $11,239,028 | $10,872,131HODGES AND SON CONSTRUCTION… | +3.4% |
| Feb 1, 2023 | 1339-02-028 | BRIDGE REPLACEMENTLipscomb · Amarillo | 1 of 5 | $10,425,012 | $10,425,012 | Won |
| Feb 1, 2023 | 2034-01-013 | BRIDGE REPLACEMENTScurry · Abilene | 1 of 4 | $1,393,947 | $1,393,947 | Won |
| Jan 6, 2023 | 0570-03-019 | BRIDGE REPLACEMENTYoung · Wichita Falls | 3 of 5 | $8,997,163 | $7,845,445INDUS ROAD & BRIDGE, INC. | +14.7% |
| Jan 6, 2023 | 0053-06-031 | BRIDGE REPLACEMENTGarza · Maintenance Division | 1 of 4 | $1,791,546 | $1,791,546 | Won |
| Jan 5, 2023 | 0903-29-027 | BRIDGE REPLACEMENTArcher · Wichita Falls | 3 of 5 | $939,480 | $824,216HODGES AND SON CONSTRUCTION… | +14.0% |
| Sep 7, 2022 | 1028-01-030 | BRIDGE REPLACEMENTMills · Brownwood | 3 of 4 | $4,449,286 | $3,930,712ACME BRIDGE COMPANY, INC. | +13.2% |
| Aug 4, 2022 | 1650-01-010 | BRIDGE REPLACEMENTHall · Childress | 2 of 5 | $1,822,319 | $1,575,474EARTH BUILDERS, L.P. | +15.7% |
| Jun 29, 2022 | 0263-05-024 | BRIDGE REPLACEMENTFisher · Abilene | 3 of 5 | $4,447,775 | $3,716,744STATELINE CONSTRUCTION, LLC | +19.7% |
| Jan 7, 2022 | 0923-17-088 | BRIDGE REPLACEMENTComanche · Brownwood | 4 of 5 | $2,166,492 | $1,969,718KNIFE RIVER CORPORATION - S… | +10.0% |
| Jan 6, 2022 | 0903-15-105 | BRIDGE REPLACEMENTCooke · Wichita Falls | 2 of 5 | $1,704,183 | $1,461,248CDM HOLDINGS, LLC | +16.6% |
| Dec 2, 2021 | 0923-09-066 | BRIDGE REPLACEMENTEastland · Brownwood | 3 of 5 | $1,515,847 | $1,317,857HODGES AND SON CONSTRUCTION… | +15.0% |
| Dec 2, 2021 | 1040-02-022 | BRIDGE REPLACEMENTHall · Childress | 1 of 7 | $1,177,468 | $1,177,468 | Won |
| Dec 2, 2021 | 0098-11-005 | BRIDGE REPLACEMENTHardeman · Childress | 4 of 5 | $778,572 | $654,248HODGES AND SON CONSTRUCTION… | +19.0% |
| Oct 8, 2021 | 0493-02-021 | BRIDGE REPLACEMENTLoving · | 3 of 6 | $3,330,601 | $2,850,737DAN WILLIAMS COMPANY | +16.8% |
| Sep 2, 2021 | 0908-33-101 | BRIDGE REPLACEMENTTaylor · Abilene | 3 of 7 | $970,506 | $786,841THK CONSTRUCTION LLC | +23.3% |
| Mar 5, 2021 | 2127-01-010 | BRIDGE REPLACEMENTHutchinson · Amarillo | 3 of 8 | $3,485,134 | $3,371,389GILVIN-TERRILL, LTD. | +3.4% |
| Feb 4, 2021 | 0802-02-069 | INTERSECTION IMPROVEMENTSWichita · Wichita Falls | 1 of 6 | $2,851,006 | $2,851,006 | Won |
| Jan 7, 2021 | 0090-06-044 | REPLACE EXISTING BRIDGESPotter · Amarillo | 3 of 7 | $6,178,256 | $5,207,276INTEGRITY SERVICES, LLC | +18.6% |
| Jan 7, 2021 | 1526-01-019 | BRIDGE REPLACEMENTScurry · Abilene | 2 of 7 | $2,986,489 | $2,902,279HODGES AND SON CONSTRUCTION… | +2.9% |
| Nov 5, 2020 | 0092-01-057 | REPLACE BRIDGE AND APPROACHESDallas · Dallas | 9 of 13 | $17,231,367 | $14,944,473AUSTIN BRIDGE & ROAD SERVIC… | +15.3% |
| Nov 5, 2020 | 0033-01-040 | BRIDGE REPLACEMENT & APPROACHESStonewall · Abilene | 4 of 8 | $4,672,631 | $4,007,232INTEGRITY SERVICES, LLC | +16.6% |
| Oct 2, 2020 | 0923-06-077 | REPLACE BRIDGE AND APPROACHESBrown · Brownwood | 4 of 7 | $1,240,811 | $1,018,524HODGES AND SON CONSTRUCTION… | +21.8% |
| Oct 1, 2020 | 0902-48-893 | BRIDGE REPLACEMENTTarrant · Fort Worth | 1 of 12 | $1,053,948 | $1,053,948 | Won |
| May 7, 2020 | 0923-17-087 | REPLACE BRIDGE AND APPROACHESComanche · Brownwood | 6 of 10 | $705,760 | $591,668ENCINO LANDSCAPE, INC. | +19.3% |
| Oct 3, 2019 | 0681-01-023 | BRIDGE REPLACEMENTWichita · Wichita Falls | 3 of 6 | $1,738,793 | $1,584,999PIERCE R & B LLC | +9.7% |
| Aug 6, 2019 | 1076-01-038 | REPLACE BRIDGE AND APPROACHESThrockmorton · Wichita Falls | 4 of 5 | $2,151,046 | $2,072,677STATELINE CONSTRUCTION, LLC | +3.8% |
| Jun 5, 2019 | 0908-19-025 | REMOVE AND REPLACE EXISTING BRIDGE AND APPROACHESScurry · Abilene | 2 of 6 | $2,588,942 | $2,153,443HODGES AND SON CONSTRUCTION… | +20.2% |
| Apr 2, 2019 | 0903-28-058 | REPLACE BRIDGE AND APPROACHESMontague · Wichita Falls | 4 of 7 | $1,540,354 | $1,372,297HODGES AND SON CONSTRUCTION… | +12.2% |
| Mar 6, 2019 | 0903-15-085 | REPLACE BRIDGE AND APPROACHESCooke · Wichita Falls | 5 of 9 | $1,282,941 | $1,090,040HODGES AND SON CONSTRUCTION… | +17.7% |
| Dec 5, 2018 | 0905-17-015 | BRIDGE CONSTRUCTIONSwisher · Lubbock | 4 of 8 | $559,721 | $503,110HODGES AND SON CONSTRUCTION… | +11.3% |
| Nov 7, 2018 | 0092-13-024 | REPLACE BRIDGE AND APPROACHESNavarro · Dallas | 5 of 15 | $8,428,924 | $7,970,000PIERCE R & B LLC | +5.8% |
| Oct 3, 2018 | 2964-06-025 | INSTALL TRANSP NOISE BARRIER ON FRONTAGE ROADSDallas · Dallas | 4 of 6 | $1,805,805 | $1,735,987SELECT STRIPING LLC | +4.0% |
| Oct 3, 2018 | 6335-42-001 | BRIDGE PREVENTATIVE MAINTENANCECooke · Wichita Falls | 7 of 9 | $897,970 | $661,892L.C. JORDAN & SON | +35.7% |
| Oct 2, 2018 | 6329-68-001 | CULVERT REPAIRClay · Wichita Falls | 1 of 8 | $579,763 | $579,763 | Won |
| Sep 6, 2018 | 0816-04-050 | REPLACE BRIDGE AND APPROACHESCollin · Dallas | 3 of 9 | $4,466,358 | $4,119,000PIERCE R & B LLC | +8.4% |
| Sep 6, 2018 | 0106-01-039 | REPLACEMENT OF EXISTING BRIDGEDickens · Childress | 1 of 6 | $1,626,092 | $1,626,092 | Won |
| Aug 22, 2018 | 6333-52-001 | BRIDGE RAIL REPAIRWichita · Wichita Falls | 5 of 6 | $150,441 | $92,400DRS CONSTRUCTION, INC. | +62.8% |
| Aug 8, 2018 | 0902-20-099 | REPLACE BRIDGE AND APPROACHESWise · Fort Worth | 2 of 7 | $567,773 | $529,964HODGES AND SON CONSTRUCTION… | +7.1% |
| Aug 7, 2018 | 0005-04-079 | BRIDGE DEMOLITIONMartin · Odessa | 4 of 7 | $737,744 | $377,597NEW WORLD CONTRACTING, LLC | +95.4% |
| Jul 11, 2018 | 0902-20-111 | REPLACE BRIDGE AND APPROACHESWise · Fort Worth | 2 of 10 | $526,268 | $516,000PIERCE R & B LLC | +2.0% |
| Jul 11, 2018 | 0925-08-019 | REPLACEMENT OF EXISTING BRIDGE FACILITYChildress · Childress | 1 of 7 | $1,306,718 | $1,306,718 | Won |
| Jul 10, 2018 | 6329-67-001 | CULVERT REPLACEMENTCooke · Wichita Falls | 4 of 7 | $660,563 | $515,404TALBRAN ENTERPRISES LLC | +28.2% |
| Jun 6, 2018 | 0296-02-033 | BRIDGE REPLACEMENTFisher · Abilene | 4 of 8 | $1,988,874 | $1,763,519J. H. STRAIN & SONS, INC. | +12.8% |
| Jun 6, 2018 | 0901-19-181 | BRIDGE REPLACEMENTGrayson · Paris | 5 of 7 | $1,269,479 | $1,074,080EAST TEXAS BRIDGE, INC. | +18.2% |
| May 2, 2018 | 0823-01-029 | EXTEND CULVERTS AND WIDEN PAVEMENTCooke · Wichita Falls | 4 of 9 | $3,494,650 | $2,899,372JAGOE-PUBLIC COMPANY | +20.5% |
| May 2, 2018 | 0918-47-176 | CHANNEL WORK, GRDDallas · Dallas | 2 of 11 | $3,193,481 | $2,950,293T KWEST GROUP LLC | +8.2% |
| Apr 4, 2018 | 0903-29-026 | REPLACE BRIDGE AND APPROACHESArcher · Wichita Falls | 8 of 10 | $412,020 | $265,265REECE CONSTRUCTION CO., INC. | +55.3% |
| Apr 4, 2018 | 0902-40-027 | REPLACE BRIDGEJack · Fort Worth | 5 of 7 | $572,272 | $434,443PIERCE R & B LLC | +31.7% |
| Apr 3, 2018 | 0903-28-064 | REPLACE BRIDGE AND APPROACHESMontague · Wichita Falls | 5 of 8 | $437,366 | $376,570FNH CONSTRUCTION, LLC | +16.1% |
| Apr 3, 2018 | 0514-01-041 | REPLACE BRIDGE AND APPROACHESWichita · Wichita Falls | 5 of 8 | $1,133,269 | $877,614FNH CONSTRUCTION, LLC | +29.1% |
| Mar 6, 2018 | 0202-08-063 | REPLACE CULVERTS AND IMPROVE DRAINAGEGrayson · Paris | 9 of 10 | $420,452 | $201,886HIGHWAY 19 CONSTRUCTION LLC | +108.3% |
| Mar 6, 2018 | 0902-39-021 | REPLACE BRIDGE AND APPROACHESPalo Pinto · Fort Worth | 6 of 10 | $897,167 | $826,138HODGES AND SON CONSTRUCTION… | +8.6% |
| Feb 2, 2018 | 0798-01-025 | REPLACE EXISTING BRIDGE AND APPROACHESRoberts · | 5 of 8 | $2,447,932 | $2,093,932STATELINE CONSTRUCTION, LLC | +16.9% |
| Feb 1, 2018 | 1012-03-018 | REPLACE BRIDGE AND APPROACHESCollin · Dallas | 12 of 18 | $2,818,759 | $1,885,537L & N BRIDGE, LLC | +49.5% |
| Dec 6, 2017 | 0574-01-029 | REPLACE BRIDGE AND APPROACHESNavarro · Dallas | 8 of 13 | $3,281,256 | $2,595,950PIERCE R & B LLC | +26.4% |
| Oct 3, 2017 | 0923-22-021 | REPLACE BRIDGE AND APPROACHESStephens · Brownwood | 8 of 10 | $853,827 | $676,267HODGES AND SON CONSTRUCTION… | +26.3% |
| Aug 9, 2017 | 2374-05-081 | UPGRADE BRIDGE & APPROACH RAILINGTarrant · Fort Worth | 6 of 7 | $1,261,756 | $966,661IOWA BRIDGE & CULVERT, LC | +30.5% |
| Jul 12, 2017 | 0043-09-130 | REPLACE BRIDGE AND APPROACHESWichita · Wichita Falls | 1 of 6 | $2,398,060 | $2,398,060 | Won |
| Jul 11, 2017 | 0134-07-070 | GR, BS, DR, STR, PAVWise · Fort Worth | 1 of 8 | $3,268,106 | $3,268,106 | Won |
| Jul 11, 2017 | 0925-09-035 | THE REPLACEMENT OF A BRIDGE FACILITYHall · Childress | 3 of 8 | $587,084 | $557,176REECE CONSTRUCTION CO., INC. | +5.4% |
| Jun 7, 2017 | 0816-05-019 | REPLACE BRIDGE AND APPROACHESCollin · Dallas | 4 of 10 | $1,793,123 | $1,597,550PIERCE R & B LLC | +12.2% |
| Jun 7, 2017 | 0918-46-274 | REPLACE BRIDGE AND APPROACHESDenton · Dallas | 1 of 7 | $1,648,414 | $1,648,414 | Won |
| Jun 6, 2017 | 0090-05-099 | BRIDGE REPLACEMENTPotter · Amarillo | 2 of 5 | $1,458,558 | $1,333,511J. LEE MILLIGAN, INC. | +9.4% |
| Apr 5, 2017 | 0909-28-022 | REPLACE BRIDGE AND APPROACHESBosque · Waco | 2 of 9 | $1,454,928 | $1,451,177HODGES AND SON CONSTRUCTION… | +0.3% |
| Apr 4, 2017 | 0918-11-091 | REPLACE BR AND APPRSKaufman · Dallas | 4 of 10 | $813,826 | $696,777STATELINE CONSTRUCTION, LLC | +16.8% |
| Mar 8, 2017 | 2451-03-015 | BRIDGE REPLACEMENTReeves · Odessa | 4 of 5 | $4,911,237 | $4,518,994GILVIN-TERRILL, LTD. | +8.7% |
| Mar 7, 2017 | 0043-14-024 | UPGRADE BRIDGE AND APPROACH RAILINGWichita · Wichita Falls | 1 of 4 | $351,296 | $351,296 | Won |
| Mar 7, 2017 | 0275-12-072 | BRIDGE REPLACMENTWheeler · Childress | 1 of 7 | $2,923,331 | $2,923,331 | Won |
| Mar 7, 2017 | 0910-08-067 | RPLC BRG & APPR, GR, ACP BS & SURF, MBGFAnderson · Tyler | 9 of 9 | $959,941 | $753,676LONGVIEW BRIDGE AND ROAD, L… | +27.4% |
| Mar 7, 2017 | 1810-01-032 | BRIDGE REPLACEMENTNacogdoches · Lufkin | 3 of 8 | $1,922,438 | $1,774,829DREWERY CONSTRUCTION COMPAN… | +8.3% |
| Dec 1, 2016 | 0903-15-082 | REPLACE BRIDGE AND APPROACHESCooke · Wichita Falls | 1 of 8 | $837,894 | $837,894 | Won |
| Nov 3, 2016 | 0902-48-722 | GR, BS, STR & STRIPINGTarrant · Fort Worth | 5 of 10 | $10,507,903 | $9,048,794J.D. ABRAMS, L.P. | +16.1% |
| Nov 3, 2016 | 0902-90-067 | REPLACE BRIDGES AND APPROACHESTarrant · Fort Worth | 2 of 9 | $2,761,259 | $2,474,990MCMAHON CONTRACTING, L.P. | +11.6% |
Active prime contracts 4
| CCSJ | Where | Work | Contract | Complete | Report |
|---|---|---|---|---|---|
| 0168-09-191Let Nov 3, 2026 | RandallAmarillo · IH 27 | $5,800,486 | |||
| 0844-04-011Let Sep 3, 2026 | CollingsworthChildress · FM 1547 | $3,017,334 | |||
| 0908-23-049Let Nov 6, 2025 | FisherAbilene · CR | BRIDGE REPLACEMENT | $1,743,544 | 99% | |
| 0067-09-033Let Apr 4, 2025 | HaleLubbock · BI 27U | BRIDGE REPLACEMENT | $6,997,916 | 71% |
Subcontracts on active jobs 5
| CCSJ | Prime contractor | Where | Work | Share | Value (est.) |
|---|---|---|---|---|---|
| 0098-03-037Let Feb 5, 2026 | ZACK BURKETT CO. | FoardChildress | REHABILITATION OF EXISTING ROAD | 1.44% | $99,345 |
| 1188-02-111Let Dec 2, 2025 | JONES BROS. DIRT & PAVING CONTRACTORS, INC. | MidlandOdessa | HAZARD ELIMINATION & SAFETY | 25.56% | $5,245,984 |
| 1598-01-024Let Jul 2, 2025 | JAY MILLS CONTRACTING, INCORPORATED | HoodFort Worth | HAZARD ELIMINATION & SAFETY | 11.04% | $1,608,108 |
| 0044-04-048Let Jun 6, 2024 | A. L. HELMCAMP, INC. | MontagueWichita Falls | WIDEN FREEWAY | 9.65% | $3,862,811 |
| 0008-03-133Let May 3, 2024 | ZACHRY CONSTRUCTION CORPORATION | ParkerFort Worth | UPGRADE TO STANDARDS FREEWAY | 0.02% | $20,312 |