CCSJ 0905-00-136

Lubbock · Lubbock Sign up free

‹ All TxDOT jobs My Jobs Win Price: predicted low bid

Bridge Maintenance

Official
Let date
Tuesday, December 1, 2026
Bids open
Dec 1, 2026 1:00 PM
District
Lubbock
County
Lubbock
Highway
Various
Project number
F 2027(209)
Design standard
PM - Preventative Maintenance
Let type
Statewide Let
Bid type
Low Bid
Project ID
A00195827
Added
Nov 6, 2026
SeqBid codeDescriptionQuantityUnitAvg low price
2
2
1 104-7006 REMOV CONC (RIPRAP)REMOVING CONCRETE 162SY $14.32
2 401-7001 FLOWABLE BACKFILL 45CY $298.77
3 422-7013 APPROACH SLABCONCRETE SUPERSTRUCTURES 54CY $738.51
4 429-7003 CONC STR REPAIR(DECK REP(PART DEPTH))CONCRETE STRUCTURE REPAIR 3,300SF $95.74
5 429-7005 CONC STR REPAIR(DECK REP (FULL DEPTH))CONCRETE STRUCTURE REPAIR 1,200SF $192.68
6 429-7007 CONC STR REPAIR (VERTICAL & OVERHEAD)CONCRETE STRUCTURE REPAIR 4,800SF $150.68
7 432-7001 RIPRAP (CONC)(4 IN)RIPRAP 21CY $573.24
8 438-7007 CLEANING AND SEALING EXIST JOINTS (CL7)CLEANING AND SEALING JOINTS 1,282LF $38.57
9 438-7009 RESIZING AND SEALING JOINTSCLEANING AND SEALING JOINTS 168LF $62.84
10 446-7019 SPOT CLEAN & PNT EXT STR(SPL PROT SYS)FIELD CLEANING AND PAINTING STEEL 2LS $117,652.00
11 495-7002 RAISING EXIST STRUCTRAISING EXISTING STRUCTURES 2EA $42,191.05
12 500-7001 MOBILIZATION 1LS $523,850.32
13 502-7001 BARRICADES, SIGNS AND TRAFFIC HANDLINGBARRICADES, SIGNS, AND TRAFFIC HANDLING 13MO $11,585.04
14 503-7001 PORTABLE CHANGEABLE MESSAGE SIGN 924DAY $87.82
15 505-7001 TMA (STATIONARY)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) 202DAY $217.57
16 505-7003 TMA (MOBILE OPERATION)TRUCK-MOUNTED ATTENUATOR (TMA) AND TRAILER ATTENUATOR (TA) 40DAY $229.60
17 506-7035 SANDBAGS FOR EROSION CONTROLTEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS 922EA $14.97
18 506-7045 BIODEG EROSN CONT LOGS (INSTL) (18")TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS 80LF $8.31
19 506-7046 BIODEG EROSN CONT LOGS (REMOVE)TEMPORARY EROSION, SEDIMENTATION, AND ENVIRONMENTAL CONTROLS 80LF $1.29
20 512-7017 PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)PORTABLE TRAFFIC BARRIER 840LF $25.07
21 512-7029 PORT CTB (MOVE)(F-SHAPE)(TY 1)PORTABLE TRAFFIC BARRIER 6,120LF $9.04
22 512-7041 PORT CTB (STKPL)(F-SHAPE)(TY 1)PORTABLE TRAFFIC BARRIER 840LF $14.41
23 545-7002 CRASH CUSH ATTEN (MOVE & RESET)CRASH CUSHION ATTENUATORS 17EA $1,471.00
24 545-7004 CRASH CUSH ATTEN (REMOVE)CRASH CUSHION ATTENUATORS 2EA $941.31
25 545-7014 CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)CRASH CUSHION ATTENUATORS 2EA $8,780.51
26 658-7012 INSTL DEL ASSM (D-SW)SZ 1(BRF)CTBDELINEATOR AND OBJECT MARKER ASSEMBLIES 4EA $9.89
27 658-7031 INSTL DEL ASSM (D-SY)SZ 1(BRF)CTBDELINEATOR AND OBJECT MARKER ASSEMBLIES 4EA $12.61
28 662-7050 WK ZN PAV MRK REMOV (REFL) TY I-CWORK ZONE PAVEMENT MARKINGS 3,240LF $4.07
29 662-7052 WK ZN PAV MRK REMOV (REFL) TY II-A-AWORK ZONE PAVEMENT MARKINGS 330LF $2.50
30 662-7058 WK ZN PAV MRK REMOV (TRAF BTN) TY WWORK ZONE PAVEMENT MARKINGS 3,240LF $1.24
31 662-7060 WK ZN PAV MRK REMOV (TRAF BTN) TY YWORK ZONE PAVEMENT MARKINGS 330LF $1.12
32 666-7234 RE PM TY III (W)(4")(BRK)RETROREFLECTORIZED PAVEMENT MARKINGS 3,240LF
33 666-7245 RE PM TY III (Y)(4")(SLD)RETROREFLECTORIZED PAVEMENT MARKINGS 3,240LF $1.23
34 677-7002 ELIM EXT PM & MRKS (6")ELIMINATING EXISTING PAVEMENT MARKINGS AND MARKERS 7,650LF $0.2755
35 734-7002 LITTER REMOVAL 22CYC $1,937.87
36 764-7001 DRAIN INLET CLEANINGPUMP STATIONS AND DRAINAGE SYSTEM CLEANING 8EA $124.25
37 778-7001 CONCRETE RAIL REPAIR (IN-KIND)CONCRETE RAIL REPAIR 30LF $380.94
38 780-7002 CNC CRACK REPAIR (DISCRETE)(INJECT)CONCRETE CRACK REPAIR 100LF $76.83
39 784-7008 REP STL BRIDGE MEMBER (BEARINGS)STEEL MEMBER REPAIR 36EA $3,868.09
40 785-7010 BRIDGE JOINT REPLACEMENT (ARMOR)BRIDGE JOINT REPAIR OR REPLACEMENT 700LF $408.48
41 786-7002 CARBON FIBER REINF POLYMER STRENGTHNINGCARBON FIBER REINFORCED POLYMER 800SF $50.56
42 787-7001 REPLACING ELASTOMERIC BEARING PADS 5EA $2,783.49
43 4019-7001 INSTALL BRIDGE IDENTIFICATION NUMBERS 20EA $496.17
44 7001-7002 BENT CAP/ABUTMENT CAP CLEANINGCLEANING BRIDGE COMPONENTS 31EA $475.41

Pre-bid questions 15

Construction Schedule Nov 11, 2026

Q: Please post the construction schedule.

A: Posted as requested. · Heath Bozeman

446 Nov 13, 2026

Q: What is the approximate square footing and paint system required for item 446-7019?

A: Steel members have isolated areas of minor to moderate paint failure with minor corrosion. Bearings have widespread paint failure and minor to moderate corrosion at both abutments and Bent 2. Contractor will need to inspect bridges to determine the approximate amount. · Heath Bozeman

784-7008 Nov 13, 2026

Q: Please provide additional detail and locations for bid item 784-7008. One abutment is noted "bearing repairs may include pack rust removal, repairing welds, and rocker adjustment" at locations 4 and 5. One abutment accounts for 6 bearings at each bridge, but the bid quantity is 18 for each bridge. Where are the other bearings located?
In addition, please provide details for the work required at these bearings.

A: 18 bearings is an estimate. The bridge height makes it difficult to see which ones need repair. · Heath Bozeman

Raise Structure Nov 13, 2026

Q: Please provide live loads and dead loads for locations 4,5 & 10 for calculating bridge lifting materials & equipment.

A: We will provide the as-builts so the contractors can perform the engineering needed to calculate the lifts. Look for as-builts to be posted later this week (Week of November 16th). · Heath Bozeman

Bridge As-Builts Nov 16, 2026

Q: Will the department be supplying As-Builts for the bridges prior to the letting. The existing bridge designs are critical for calculating the cost to raise the bridges.

A: Yes. The bridges in the plans that are to be lifted (4, 5 and 10), as-built plans are provided here to be downloaded. · Heath Bozeman

Bridge As-Builts (Follow-up) Nov 17, 2026

Q: The files did not come through, can you post them again?

A: As-builts posted. · Heath Bozeman

Bridge As-Builts Nov 17, 2026

Q: As-built plans need to be posted.

A: As-builts have been posted. · Heath Bozeman

Bridge As-Builts Nov 17, 2026

Q: I'm not seeing a download? Am I missing something?

A: As-built files. We have had some technical issues of files not wanting to load on previous questions. We will monitor to make sure the files are available to be downloaded. · Heath Bozeman

446 Nov 18, 2026

Q: Bid item 446-7019 is Spot Clean & Paint Existing Structure (Special Protection System). There is no detail sheet for the painting to specify which paint system is to be used as the special protection system. Please specify the paint system to be used.

A: System I · Heath Bozeman

Spot clean and PNT Str(SPL PROT SYS) Biditem Nov 20, 2026

Q: I see the plans carry 2 LS for this item. For estimating purposes, could you provide the approximate SF quantity of steel to be cleaned and painted?

A: Contractor will need to inspect bridges to determine the approximate amount. · Heath Bozeman

Item 512 and 545 Nov 20, 2026

Q: Please confirm that TXDOT is supplying the Port CTB for item 512 and the contractor is furnishing 2 crash cushion attenuators for item 545 to be moved and reset 17 times.

A: Yes. Please note the contractor will need to supply all connecting hardware for the CTB that is stored at the New Deal yard next to IH 27. · Heath Bozeman

general Nov 24, 2026

Q: Sheet 76 - resize joints detail - is this work at the same location as the 18 CY of approach slab work? The detail seems to show 2 LF of deck & 1 LF of approach slab to be replaced, is that how the 18 CY was arrived at? Is the approach slab 28" thick?

A: The bridge deck is about 19.5” thick at the abutments according to the as-built plan set 28” as detailed in the plans is incorrect. The 1’ and 2’, measured out from the joint, referenced in the question is only for the 2” thick overlay and not the entire approach slab or deck.

The approach slab repair is separate from resizing the joints. 18CY is an estimate of the quantity for all approach slabs and is based on what is visibly damaged. · Heath Bozeman

Coating System Nov 24, 2026

Q: What coating system is to be used on this project?

A: System I · Heath Bozeman

general Nov 25, 2026

Q: For the approach slab item, how is the removal paid for? Is it expected to be subsidiary to the approach slab item or included elsewhere?

A: Will be sending this question to the sealing engineer as to get their reply to what they intended. Look for the response in a follow-up question. · Heath Bozeman

Item 0785-7010 Nov 25, 2026

Q: Can you confirm the breakback length for the armor joint replacements? Note 2 on sheet 73 implies that it is 1'.

A: Confirm. That is correct. Breakback length for the armor joint is 1 LF. Remove only more than 1 LF if the Engineer finds unsound concrete past that limit. · Heath Bozeman

From TxDOT's Pre-bid Question and Answer data. Answers become part of the proposal; check the official packet before bidding.