| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$75,000.00 |
$100,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 11,537 | CY |
$8.00 |
$10.00 |
$10.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 32,473 | CY |
$10.00 |
$10.00 |
$9.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$20,000.00 |
$40,000.00 |
| 5 | 221(A) 2800 |
TEMPORARY SLOPE DRAINS | 200 | LF |
$25.00 |
$40.00 |
$45.60 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,470 | LF |
$3.00 |
$1.50 |
$1.40 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 520 | LF |
$7.00 |
$5.60 |
$5.15 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 51,000 | SY |
$1.30 |
$1.47 |
$1.40 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 10.53 | AC |
$550.00 |
$300.00 |
$100.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 335 | CY |
$60.00 |
$93.00 |
$60.00 |
| 11 | 307(K) 4300 |
STABILIZED SUBGRADE | 11,825 | SY |
$8.00 |
$10.00 |
$7.25 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,445 | TON |
$40.00 |
$44.00 |
$32.00 |
| 13 | 407(B) 0250 |
TACK COAT | 1,095 | GAL |
$4.00 |
$5.20 |
$1.00 |
| 14 | 408 5774 |
PRIME COAT | 4,088 | GAL |
$7.00 |
$6.60 |
$1.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 2,884 | TON |
$90.00 |
$87.00 |
$93.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,222 | TON |
$95.00 |
$100.00 |
$112.00 |
| 17 | 509(B) 0321 |
CLASS A CONCRETE | 32 | CY |
$500.00 |
$700.00 |
$450.00 |
| 18 | 509(D) 0325 |
CLASS C CONCRETE | 9 | CY |
$450.00 |
$500.00 |
$550.00 |
| 19 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 4,689 | TON |
$55.00 |
$46.00 |
$48.00 |
| 20 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 861 | TON |
$45.00 |
$36.00 |
$37.00 |
| 21 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 112 | LF |
$50.00 |
$79.00 |
$130.00 |
| 22 | 613(A) 4410 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III | 76 | LF |
$50.00 |
$102.00 |
$140.00 |
| 23 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$2,000.00 |
$2,300.00 |
| 24 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$3,000.00 |
$2,500.00 |
$2,300.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$45,000.00 |
$30,000.00 |
$50,000.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 7,902 | SY |
$6.00 |
$6.00 |
$4.50 |
| 27 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,446 | LF |
$5.00 |
$5.00 |
$4.00 |
| 28 | 619(C) 0924 |
SAWING PAVEMENT | 60 | LF |
$4.00 |
$5.00 |
$11.00 |
| 29 | 623 0100 |
(PL)GUARDRAIL CURBING | 8 | EA |
$1,000.00 |
$1,200.00 |
$4,000.00 |
| 30 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,125 | LF |
$20.00 |
$22.00 |
$17.25 |
| 31 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,500.00 |
$2,420.00 |
$2,250.00 |
| 32 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$2,000.00 |
$2,090.00 |
$1,950.00 |
| 33 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 5,606 | LF |
$6.00 |
$5.50 |
$5.25 |
| 34 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,760 | CY |
$10.00 |
$20.00 |
$13.00 |
| 35 | 202(D) 0184 |
UNCLASSIFIED BORROW | 160 | CY |
$10.00 |
$60.00 |
$13.00 |
| 36 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$20,000.00 |
$25,000.00 |
$16,000.00 |
| 37 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,838 | LF |
$1.69 |
$2.00 |
$1.50 |
| 38 | 232(B) 2814 |
SEEDING METHOD B | 0.3 | AC |
$10,000.00 |
$5,000.00 |
$525.00 |
| 39 | 233(E) 2822 |
EXCELSIOR MAT | 150 | SY |
$30.00 |
$35.00 |
$20.00 |
| 40 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,467.7 | LF |
$6.35 |
$7.00 |
$8.00 |
| 41 | 850(D) 8121 |
SPECIAL SIGNS | 18 | EA |
$100.00 |
$135.00 |
$110.00 |
| 42 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$9,500.00 |
$30,000.00 |
| 43 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$15.00 |
$20.00 |
$18.00 |
| 44 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$150.00 |
$150.00 |
$175.00 |
| 45 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 1,197 | LF |
$250.00 |
$225.00 |
$265.00 |
| 46 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$250.00 |
$225.00 |
$220.00 |
| 47 | 504(B) 1305 |
SAW-CUT GROOVING | 1,557.8 | SY |
$5.00 |
$4.40 |
$4.00 |
| 48 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 697 | LF |
$95.00 |
$80.00 |
$100.00 |
| 49 | 506(A) 1322 |
STRUCTURAL STEEL | 1,050 | LB |
$3.00 |
$2.50 |
$1.25 |
| 50 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$800.00 |
$400.00 |
$500.00 |
| 51 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$2,000.00 |
$1,400.00 |
$2,000.00 |
| 52 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 16 | EA |
$700.00 |
$750.00 |
$500.00 |
| 53 | 509(A) 1326 |
CLASS AA CONCRETE | 385.9 | CY |
$650.00 |
$650.00 |
$730.00 |
| 54 | 509(B) 1328 |
CLASS A CONCRETE | 124.9 | CY |
$630.00 |
$700.00 |
$1,000.00 |
| 55 | 511(A) 1332 |
REINFORCING STEEL | 17,600 | LB |
$1.00 |
$1.00 |
$1.00 |
| 56 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 92,290 | LB |
$1.10 |
$1.20 |
$1.25 |
| 57 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,070 | LF |
$45.00 |
$30.00 |
$40.00 |
| 58 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,070 | LF |
$20.00 |
$15.00 |
$15.00 |
| 59 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 60 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,167 | SY |
$5.00 |
$3.25 |
$4.00 |
| 61 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 250 | LF |
$900.00 |
$900.00 |
$1,200.00 |
| 62 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$5,000.00 |
$3,000.00 |
$3,000.00 |
| 63 | 523(A) 6550 |
SEALER CRACK PREPARATION | 163 | LF |
$5.00 |
$5.00 |
$5.00 |
| 64 | 523(B) 6560 |
SEALER RESIN | 1.8 | GAL |
$150.00 |
$150.00 |
$200.00 |
| 65 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 805 | TON |
$55.00 |
$46.00 |
$51.00 |
| 66 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 191 | TON |
$45.00 |
$36.00 |
$39.00 |
| 67 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$35.00 |
$35.00 |
| 68 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$30.00 |
$35.00 |
$35.00 |
| 69 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$50,000.00 |
$50,000.00 |
$200,000.00 |
| 70 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$15.00 |
$20.00 |
$18.00 |
| 71 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$150.00 |
$150.00 |
$175.00 |
| 72 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 399 | LF |
$250.00 |
$230.00 |
$265.00 |
| 73 | 504(A) 1304 |
APPROACH SLAB | 224.8 | SY |
$250.00 |
$225.00 |
$220.00 |
| 74 | 504(B) 1305 |
SAW-CUT GROOVING | 660.1 | SY |
$5.00 |
$4.40 |
$4.00 |
| 75 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 297 | LF |
$95.00 |
$80.00 |
$100.00 |
| 76 | 506(A) 1322 |
STRUCTURAL STEEL | 150 | LB |
$3.00 |
$2.50 |
$1.50 |
| 77 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$800.00 |
$720.00 |
$500.00 |
| 78 | 509(A) 1326 |
CLASS AA CONCRETE | 155.6 | CY |
$650.00 |
$700.00 |
$1,500.00 |
| 79 | 509(B) 1328 |
CLASS A CONCRETE | 59.6 | CY |
$650.00 |
$800.00 |
$1,000.00 |
| 80 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 37,340 | LB |
$1.10 |
$1.20 |
$1.25 |
| 81 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 760 | LF |
$45.00 |
$30.00 |
$40.00 |
| 82 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 760 | LF |
$20.00 |
$15.00 |
$15.00 |
| 83 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
| 84 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 461 | SY |
$5.00 |
$3.25 |
$4.00 |
| 85 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 723 | TON |
$55.00 |
$46.00 |
$51.00 |
| 86 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 168 | TON |
$45.00 |
$36.00 |
$39.00 |
| 87 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$30.00 |
$35.00 |
$36.00 |
| 88 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$30.00 |
$35.00 |
$35.00 |
| 89 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$20,000.00 |
$50,000.00 |
| 90 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 39 | SF |
$20.00 |
$16.00 |
$15.00 |
| 91 | 851(C) 8324 |
2" SQUARE TUBE POST | 70 | LF |
$20.00 |
$9.00 |
$8.00 |
| 92 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 40 | EA |
$20.00 |
$16.00 |
$15.00 |
| 93 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 10,800 | LF |
$0.3000 |
$0.2800 |
$0.2500 |
| 94 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 47,520 | SD |
$1.00 |
$0.3800 |
$0.3500 |
| 95 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,240 | SD |
$1.50 |
$2.05 |
$2.00 |
| 96 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 900 | SD |
$2.00 |
$2.05 |
$2.00 |
| 97 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,240 | SD |
$1.00 |
$0.5300 |
$0.5000 |
| 98 | 880(C) 8848 |
WING BARRICADES | 1,080 | SD |
$1.25 |
$1.05 |
$1.00 |
| 99 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 9,720 | SD |
$0.3000 |
$0.1200 |
$0.1000 |
| 100 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 1,080 | SD |
$20.00 |
$5.25 |
$5.00 |
| 101 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$27,000.00 |
$20,000.00 |
$50,000.00 |
| 102 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$13,000.00 |
| 103 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$7,000.00 |
$7,500.00 |
$30,000.00 |
| 104 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$211,000.00 |
$200,000.00 |
$250,000.00 |