| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$18,570.81 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 10,998 | CY |
$8.50 |
$10.27 |
$14.56 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 12,554 | CY |
$12.00 |
$10.27 |
$15.70 |
$20.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$25,000.00 |
$34,537.89 |
$53,159.97 |
$25,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 9,272 | LF |
$1.75 |
$5.66 |
$1.66 |
$2.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 150 | LF |
$10.00 |
$8.94 |
$18.26 |
$18.00 |
| 7 | 221(H) 0450 |
(PL)TEMPORARY INLET SEDIMENT FILTER | 6 | EA |
$175.00 |
$148.01 |
$331.94 |
$600.00 |
| 8 | 229 4318 |
DITCH LINER PROTECTION | 1,070 | LF |
$1.80 |
$2.44 |
$2.06 |
$2.00 |
| 9 | 230(A) 2806 |
SOLID SLAB SODDING | 29,580 | SY |
$2.00 |
$2.20 |
$2.49 |
$2.25 |
| 10 | 230(F) 2812 |
WATERING | 2,367 | KGAL |
$8.00 |
$12.21 |
$5.53 |
$12.00 |
| 11 | 233(A) 2817 |
VEGETATIVE MULCHING | 7 | AC |
$300.00 |
$977.05 |
$719.20 |
$850.00 |
| 12 | 234(A) 2824 |
FERTILIZING (10-20-10) | 3 | TON |
$525.00 |
$1,221.31 |
$603.02 |
$1,200.00 |
| 13 | 241 2832 |
MOWING | 14 | AC |
$90.00 |
$122.13 |
$94.05 |
$110.00 |
| 14 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 3,069 | CY |
$52.00 |
$64.17 |
$71.99 |
$80.00 |
| 15 | 307(K) 4300 |
STABILIZED SUBGRADE | 21,653 | SY |
$5.00 |
$5.40 |
$6.40 |
$7.75 |
| 16 | 317 4270 |
CEMENT TREATED BASE | 18,331 | SY |
$14.00 |
$19.91 |
$16.17 |
$20.50 |
| 17 | 325 5271 |
SEPARATOR FABRIC | 16,581 | SY |
$3.75 |
$1.20 |
$1.11 |
$2.00 |
| 18 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,042 | TON |
$44.00 |
$29.44 |
$42.87 |
$45.00 |
| 19 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 5,415 | SY |
$16.00 |
$15.44 |
$19.43 |
$28.25 |
| 20 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 10,768 | SY |
$20.00 |
$19.73 |
$24.72 |
$30.15 |
| 21 | 414(E) 0225 |
FULL DEPTH P.C. CONCRETE PATCHING(PLACEMENT ONLY) | 250 | SY |
$65.00 |
$140.92 |
$78.61 |
$110.00 |
| 22 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 4,855 | CY |
$125.00 |
$130.24 |
$144.48 |
$131.25 |
| 23 | 501(G) 6309 |
CLSM BACKFILL | 25 | CY |
$160.00 |
$182.94 |
$131.92 |
$160.00 |
| 24 | 504(E) 1381 |
CONCRETE PARAPET | 18 | LF |
$120.00 |
$273.52 |
$218.16 |
$250.00 |
| 25 | 504(E) 6190 |
42" F-SHAPED PARAPET | 1,179 | LF |
$85.00 |
$61.54 |
$124.28 |
$90.00 |
| 26 | 509(B) 0321 |
CLASS A CONCRETE | 189 | CY |
$420.00 |
$256.51 |
$256.10 |
$385.00 |
| 27 | 509(D) 0325 |
CLASS C CONCRETE | 182 | CY |
$200.00 |
$218.34 |
$188.72 |
$350.00 |
| 28 | 510(C) 6135 |
SLOPE WALL (5") | 1,472 | SY |
$120.00 |
$85.36 |
$135.06 |
$200.00 |
| 29 | 511(A) 0332 |
REINFORCING STEEL | 28,130 | LB |
$1.00 |
$0.9800 |
$1.14 |
$1.50 |
| 30 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 4,605 | TON |
$45.00 |
$45.08 |
$69.10 |
$67.50 |
| 31 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 864 | TON |
$35.00 |
$31.69 |
$57.11 |
$60.00 |
| 32 | 610(C) 0609 |
6" CONCRETE DIVIDING STRIP | 900 | SY |
$80.00 |
$38.45 |
$48.63 |
$65.00 |
| 33 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 24 | LF |
$85.00 |
$140.96 |
$85.14 |
$97.50 |
| 34 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 16 | LF |
$125.00 |
$231.30 |
$132.22 |
$140.00 |
| 35 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$1,300.00 |
$1,171.22 |
$1,030.21 |
$1,600.00 |
| 36 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,500.00 |
$1,770.62 |
$1,635.43 |
$2,000.00 |
| 37 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 11 | EA |
$500.00 |
$300.58 |
$671.52 |
$800.00 |
| 38 | 613(S) 1186 |
STANDARD BEDDING MATERIAL, CLASS B | 20 | CY |
$20.00 |
$35.00 |
$65.86 |
$45.00 |
| 39 | 613(V) 1180 |
TRENCH EXCAVATION | 33 | CY |
$10.00 |
$30.00 |
$10.58 |
$12.00 |
| 40 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$18,402.13 |
$36,303.06 |
$10,000.00 |
| 41 | 619(B) 0291 |
REMOVAL OF HEADWALL | 14 | EA |
$600.00 |
$371.25 |
$244.21 |
$900.00 |
| 42 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 5,796 | SY |
$10.00 |
$16.00 |
$10.08 |
$11.00 |
| 43 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 272 | SY |
$4.00 |
$13.60 |
$9.40 |
$11.00 |
| 44 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 250 | LF |
$3.25 |
$17.10 |
$5.54 |
$8.00 |
| 45 | 619(B) 4821 |
REMOVAL OF CONCRETE SLOPE PROTECTION | 935 | SY |
$15.00 |
$8.72 |
$14.56 |
$14.00 |
| 46 | 619(B) 5881 |
REMOVAL OF CONCRETE DITCH LINER | 170 | LF |
$10.00 |
$11.72 |
$12.08 |
$30.00 |
| 47 | 619(B) 6132 |
REMOVAL OF 6" CONCRETE DIVIDING STRIP | 1,027 | SY |
$18.00 |
$6.32 |
$11.77 |
$12.50 |
| 48 | 619(B) 6252 |
REMOVAL OF EXISTING PARAPET | 18 | LF |
$50.00 |
$130.03 |
$55.58 |
$200.00 |
| 49 | 619(C) 0924 |
SAWING PAVEMENT | 15,235 | LF |
$4.00 |
$6.00 |
$4.59 |
$3.50 |
| 50 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 125 | LF |
$16.50 |
$23.45 |
$21.24 |
$24.00 |
| 51 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 1 | EA |
$2,475.00 |
$2,809.02 |
$2,544.87 |
$2,800.00 |
| 52 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 1 | EA |
$2,750.00 |
$2,546.44 |
$2,306.98 |
$2,500.00 |
| 53 | 627(A) 4317 |
CONCRETE LONGITUDINAL BARRIER, DESIGN 1 | 1,150 | LF |
$40.00 |
$74.62 |
$94.22 |
$75.00 |
| 54 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 4 | EA |
$21.00 |
$14.66 |
$13.28 |
$14.00 |
| 55 | 509(D) 0325 |
CLASS C CONCRETE | 41 | CY |
$300.00 |
$366.39 |
$442.59 |
$350.00 |
| 56 | 511(A) 0332 |
REINFORCING STEEL | 841 | LB |
$1.00 |
$3.97 |
$1.11 |
$2.00 |
| 57 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 252 | LF |
$645.00 |
$1,038.12 |
$940.50 |
$1,050.00 |
| 58 | 805(A) 8700 |
REMOVAL OF SIGN FOOTING | 11 | EA |
$1,000.00 |
$1,703.73 |
$1,543.52 |
$1,700.00 |
| 59 | 805(A) 8718 |
(PL)REMOVAL OF OVERHEAD SIGN STRUCTURE & SIGNS | 1 | LSUM |
$3,500.00 |
$26,502.48 |
$24,010.33 |
$26,000.00 |
| 60 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 7 | EA |
$150.00 |
$305.33 |
$276.62 |
$300.00 |
| 61 | 805(D) 8764 |
(PL)REMOVE & RESET/RELOCATE ITS EQUIPMENT | 1 | EA |
$25,000.00 |
$41,524.63 |
$37,619.87 |
$40,000.00 |
| 62 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 144 | SF |
$22.00 |
$21.98 |
$19.92 |
$22.00 |
| 63 | 850(B) 8114 |
EXTRUDED ALUMINUM PANEL SIGNS(OVERHEAD SIGNS) | 1,672.5 | SF |
$65.00 |
$24.43 |
$22.13 |
$25.00 |
| 64 | 851(C) 8324 |
2" SQUARE TUBE POST | 120 | LF |
$10.00 |
$9.77 |
$8.85 |
$10.00 |
| 65 | 852(D) 0340 |
OVHD.SN.STR., MONOTUBE TYPE B 110' | 1 | EA |
$130,000.00 |
$121,398.47 |
$109,982.81 |
$100,000.00 |
| 66 | 852(D) 0345 |
OVHD.SN.STR., MONOTUBE TYPE B 115' | 1 | EA |
$150,000.00 |
$122,925.11 |
$111,365.89 |
$102,000.00 |
| 67 | 852(D) 0350 |
OVHD.SN.STR., MONOTUBE TYPE B 120' | 1 | EA |
$175,000.00 |
$123,718.97 |
$112,085.09 |
$103,000.00 |
| 68 | 852(D) 0355 |
OVHD.SN.STR., MONOTUBE TYPE B 125' | 1 | EA |
$210,000.00 |
$126,283.72 |
$114,408.68 |
$105,000.00 |
| 69 | 852(D) 0360 |
OVHD.SN.STR., MONOTUBE TYPE B 130' | 1 | EA |
$250,000.00 |
$0.00 |
$0.00 |
$0.00 |
| 70 | 852(E) 0500 |
OVHD.SN.STR., MONOTUBE TYPE C | 1 | EA |
$85,000.00 |
$66,805.80 |
$60,523.74 |
$45,000.00 |
| 71 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 48,649 | LF |
$1.60 |
$0.2800 |
$0.2500 |
$0.3000 |
| 72 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 7,322 | LF |
$2.00 |
$1.53 |
$1.38 |
$1.50 |
| 73 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 5,591 | LF |
$3.50 |
$1.61 |
$1.46 |
$1.60 |
| 74 | 856(B) 8860 |
TRAFFIC STRIPE(MULTI-POLY.)(ARROWS) | 63 | EA |
$160.00 |
$488.53 |
$442.59 |
$500.00 |
| 75 | 856(B) 8870 |
TRAFFIC STRIPE(MULTI-POLY.)(SYMBOLS) | 19 | EA |
$800.00 |
$2,686.89 |
$2,434.23 |
$2,700.00 |
| 76 | 856(B) 8880 |
TRAFFIC STRIPE(MULTI-POLY.)(WORDS) | 17 | EA |
$200.00 |
$488.53 |
$442.59 |
$500.00 |
| 77 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 17,954 | LF |
$1.65 |
$0.3500 |
$0.3200 |
$0.3500 |
| 78 | 870(A) 8011 |
SAND FILLED IMPACT ATTENUATION MODULE | 57 | EA |
$350.00 |
$323.65 |
$293.21 |
$325.00 |
| 79 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 3 | EA |
$25,000.00 |
$21,922.56 |
$19,861.08 |
$22,000.00 |
| 80 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 32,692 | LF |
$0.3500 |
$0.1100 |
$0.1000 |
$0.1000 |
| 81 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 1,000 | LF |
$2.50 |
$2.93 |
$2.66 |
$2.85 |
| 82 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 1,000 | EA |
$1.00 |
$0.9200 |
$0.8300 |
$0.9000 |
| 83 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 31,240 | LF |
$0.5000 |
$0.2400 |
$0.2200 |
$0.2500 |
| 84 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 270 | SD |
$12.00 |
$9.77 |
$8.85 |
$9.50 |
| 85 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 8,287.5 | LF |
$25.50 |
$44.94 |
$10.65 |
$14.50 |
| 86 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,537.5 | LF |
$4.00 |
$7.90 |
$4.85 |
$3.00 |
| 87 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,860 | SD |
$0.2500 |
$0.1200 |
$0.1100 |
$0.1300 |
| 88 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 6,075 | SD |
$0.5000 |
$0.1200 |
$0.1100 |
$0.1300 |
| 89 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 13,365 | SD |
$1.25 |
$0.1200 |
$0.1100 |
$0.1300 |
| 90 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 675 | SD |
$0.7500 |
$24.43 |
$22.13 |
$24.00 |
| 91 | 880(C) 8848 |
WING BARRICADES | 1,080 | SD |
$1.60 |
$0.1800 |
$0.1700 |
$0.2000 |
| 92 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,510 | SD |
$0.5000 |
$0.6100 |
$0.5500 |
$0.6100 |
| 93 | 880(F) 8878 |
DRUMS | 8,640 | SD |
$0.2000 |
$0.2400 |
$0.2200 |
$0.2500 |
| 94 | 880(G) 8890 |
CHANNELIZER CONES | 19,305 | SD |
$0.5000 |
$0.3100 |
$0.2800 |
$0.2900 |
| 95 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 120 | HOUR |
$65.00 |
$79.39 |
$88.52 |
$100.00 |
| 96 | 882 8370 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE CHANGEABLE MESSAGE SIGN | 1,890 | SD |
$7.00 |
$10.99 |
$9.96 |
$10.00 |
| 97 | 882 8372 |
(SP)SMART WORK ZONE SYSTEM-PORTABLE TRAFFIC SENSOR (PTS) | 1,350 | SD |
$7.00 |
$6.11 |
$5.53 |
$6.00 |
| 98 | 882 8374 |
(SP)SMART WORK ZONE SYSTEM-PAN-TILT-ZOOM CAMERA (PTZC) | 135 | SD |
$14.00 |
$13.43 |
$12.17 |
$13.00 |
| 99 | 882 8376 |
(SP)SMART WORK ZONE SYSTEM-WEBSITE SYSTEM | 135 | SD |
$30.00 |
$24.43 |
$22.13 |
$25.00 |
| 100 | 882 8378 |
(PL)SMART WORK ZONE SYSTEM SETUP | 1 | EA |
$140,000.00 |
$7,938.53 |
$7,192.03 |
$10,000.00 |
| 101 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 270 | SD |
$14.00 |
$9.77 |
$8.85 |
$10.00 |
| 102 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$33,256.34 |
$47,495.70 |
$30,000.00 |
| 103 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$5,191.11 |
$7,000.00 |
| 104 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$279,365.00 |
$200,737.29 |
$273,317.24 |
$285,000.00 |