| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$35,000.00 |
$2,000.00 |
$10,000.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,416 | CY |
$10.00 |
$4.75 |
$10.00 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 7,359 | CY |
$12.00 |
$10.00 |
$12.00 |
$15.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$40,000.00 |
$9,200.00 |
$10,000.00 |
$25,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,926 | LF |
$2.00 |
$2.99 |
$2.99 |
$2.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 105 | LF |
$8.00 |
$14.95 |
$14.95 |
$12.00 |
| 7 | 221(G) 0153 |
TEMPORARY ROCK FILTER DAM TYPE 4 | 8 | CY |
$115.00 |
$200.00 |
$85.00 |
$150.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 4,410 | SY |
$2.00 |
$3.49 |
$3.49 |
$4.00 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 0.49 | AC |
$400.00 |
$10,204.08 |
$10,204.08 |
$11,500.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.49 | AC |
$650.00 |
$10,204.08 |
$10,204.08 |
$11,500.00 |
| 11 | 233(E) 2822 |
EXCELSIOR MAT | 1,636 | SY |
$6.00 |
$3.99 |
$3.99 |
$4.50 |
| 12 | 241 2832 |
MOWING | 2.8 | AC |
$75.00 |
$299.00 |
$299.00 |
$335.00 |
| 13 | 242 0400 |
(PL)STABILIZED CONSTRUCTION EXIT | 2 | EA |
$2,200.00 |
$1,000.00 |
$1,500.00 |
$1,500.00 |
| 14 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 909 | CY |
$50.00 |
$41.42 |
$55.00 |
$51.00 |
| 15 | 307(K) 4300 |
STABILIZED SUBGRADE | 4,052 | SY |
$8.00 |
$6.50 |
$5.25 |
$6.00 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 4,052 | SY |
$2.00 |
$1.10 |
$1.50 |
$1.44 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 168 | TON |
$28.00 |
$21.48 |
$40.00 |
$34.00 |
| 18 | 408 5774 |
PRIME COAT | 2,657 | GAL |
$6.00 |
$4.15 |
$5.00 |
$6.00 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,109 | TON |
$85.00 |
$64.25 |
$79.50 |
$97.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 503 | TON |
$110.00 |
$77.00 |
$92.00 |
$114.00 |
| 21 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 200 | TON |
$120.00 |
$105.00 |
$110.00 |
$200.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 9 | CY |
$250.00 |
$300.00 |
$350.00 |
$375.00 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$4,000.00 |
$2,500.00 |
$3,500.00 |
$15,000.00 |
| 24 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,054 | SY |
$5.00 |
$2.00 |
$5.00 |
$12.00 |
| 25 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 216 | LF |
$3.00 |
$3.00 |
$5.00 |
$5.00 |
| 26 | 619(C) 0924 |
SAWING PAVEMENT | 74 | LF |
$6.00 |
$15.00 |
$5.00 |
$7.00 |
| 27 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$1,000.00 |
$1,000.00 |
$900.00 |
$900.00 |
| 28 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 612.5 | LF |
$18.00 |
$17.00 |
$17.00 |
$20.00 |
| 29 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,300.00 |
$2,200.00 |
$2,200.00 |
$2,500.00 |
| 30 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,675.00 |
$1,675.00 |
$1,900.00 |
| 31 | 624(C) 4458 |
FENCE-STYLE SWF (4 BARBED WIRE) | 391 | LF |
$8.00 |
$15.00 |
$15.00 |
$11.50 |
| 32 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 90 | CY |
$30.00 |
$25.00 |
$15.00 |
$28.00 |
| 33 | 501(G) 6309 |
CLSM BACKFILL | 122.6 | CY |
$130.00 |
$140.00 |
$150.00 |
$145.00 |
| 34 | 502 1000 |
TEMPORARY EARTH RETAINAGE | 1 | LSUM |
$150,000.00 |
$4,000.00 |
$125,000.00 |
$10,000.00 |
| 35 | 504(A) 1304 |
APPROACH SLAB | 187.6 | SY |
$185.00 |
$200.00 |
$240.00 |
$150.00 |
| 36 | 504(B) 1305 |
SAW-CUT GROOVING | 1,058.8 | SY |
$6.00 |
$4.05 |
$4.50 |
$4.60 |
| 37 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 541 | LF |
$85.00 |
$110.00 |
$95.00 |
$100.00 |
| 38 | 506(A) 1322 |
STRUCTURAL STEEL | 341,240 | LB |
$2.00 |
$1.45 |
$1.85 |
$1.93 |
| 39 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 12 | EA |
$1,000.00 |
$175.00 |
$450.00 |
$1,150.00 |
| 40 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 24 | EA |
$2,000.00 |
$1,500.00 |
$2,300.00 |
$1,400.00 |
| 41 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 24 | EA |
$375.00 |
$300.00 |
$450.00 |
$310.00 |
| 42 | 509 6152 |
SPECIAL CONCRETE FINISH | 66 | SY |
$50.00 |
$100.00 |
$100.00 |
$35.00 |
| 43 | 509(A) 1326 |
CLASS AA CONCRETE | 276.4 | CY |
$650.00 |
$700.00 |
$950.00 |
$920.00 |
| 44 | 509(B) 1328 |
CLASS A CONCRETE | 139.6 | CY |
$700.00 |
$700.00 |
$750.00 |
$700.00 |
| 45 | 511 6306 |
MECHANICAL SPLICES | 1,043 | EA |
$30.00 |
$40.00 |
$28.00 |
$25.00 |
| 46 | 511(A) 1332 |
REINFORCING STEEL | 680 | LB |
$1.00 |
$0.8000 |
$1.05 |
$1.20 |
| 47 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 120,910 | LB |
$1.20 |
$1.00 |
$1.05 |
$1.10 |
| 48 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 50 | SY |
$300.00 |
$250.00 |
$405.00 |
$200.00 |
| 49 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 50 | SY |
$500.00 |
$300.00 |
$475.00 |
$390.00 |
| 50 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 400 | LF |
$40.00 |
$30.00 |
$38.00 |
$25.50 |
| 51 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 400 | LF |
$25.00 |
$15.00 |
$10.00 |
$48.00 |
| 52 | 514(G) 6310 |
METAL PILE SHOES | 14 | EA |
$115.00 |
$100.00 |
$135.00 |
$90.00 |
| 53 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 54 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 716 | SY |
$4.00 |
$3.65 |
$3.65 |
$4.15 |
| 55 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 86 | LF |
$1,000.00 |
$800.00 |
$980.00 |
$1,100.00 |
| 56 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$5,000.00 |
$8,500.00 |
$2,000.00 |
$1,600.00 |
| 57 | 523(A) 6550 |
SEALER CRACK PREPARATION | 399.4 | LF |
$10.00 |
$4.00 |
$3.00 |
$4.60 |
| 58 | 523(B) 6560 |
SEALER RESIN | 2.7 | GAL |
$150.00 |
$150.00 |
$100.00 |
$170.00 |
| 59 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,300 | TON |
$40.00 |
$35.00 |
$41.00 |
$37.00 |
| 60 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 210 | TON |
$35.00 |
$28.00 |
$31.00 |
$28.00 |
| 61 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 90 | LF |
$30.00 |
$40.00 |
$30.00 |
$27.00 |
| 62 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$20.00 |
$40.00 |
$30.00 |
$18.00 |
| 63 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$60,000.00 |
$85,000.00 |
$135,000.00 |
$170,000.00 |
| 64 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 51 | SF |
$20.00 |
$15.00 |
$15.00 |
$17.00 |
| 65 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 66 | LF |
$10.00 |
$10.00 |
$10.00 |
$11.50 |
| 66 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 19 | EA |
$11.00 |
$15.00 |
$15.00 |
$17.00 |
| 67 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 8,660 | LF |
$1.50 |
$0.7000 |
$0.7000 |
$0.8000 |
| 68 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 295 | SD |
$250.00 |
$100.00 |
$100.00 |
$112.60 |
| 69 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,144 | LF |
$0.5000 |
$0.5000 |
$0.5000 |
$0.6000 |
| 70 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 144 | LF |
$0.7000 |
$2.00 |
$2.00 |
$2.30 |
| 71 | 857(F) 8820 |
PAVEMENT MARKING REMOVAL (HYDROBLASTING) | 8,660 | LF |
$1.25 |
$0.2500 |
$0.2500 |
$0.3000 |
| 72 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 590 | SD |
$15.00 |
$5.00 |
$5.00 |
$5.70 |
| 73 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,400 | LF |
$35.00 |
$42.50 |
$40.00 |
$50.00 |
| 74 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,400 | LF |
$5.00 |
$4.00 |
$1.75 |
$2.00 |
| 75 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,900 | SD |
$0.4000 |
$0.2500 |
$0.2500 |
$0.4000 |
| 76 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 11,505 | SD |
$1.20 |
$0.0500 |
$0.0500 |
$2.30 |
| 77 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,425 | SD |
$2.75 |
$1.50 |
$1.50 |
$2.80 |
| 78 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,770 | SD |
$1.00 |
$2.00 |
$2.00 |
$2.30 |
| 79 | 880(C) 8848 |
WING BARRICADES | 1,180 | SD |
$1.00 |
$0.5000 |
$0.5000 |
$0.6000 |
| 80 | 880(D) 8854 |
VERTICAL PANELS | 2,950 | SD |
$0.3000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 81 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,375 | SD |
$0.3500 |
$0.1000 |
$0.1000 |
$0.1100 |
| 82 | 880(F) 8878 |
DRUMS | 10,325 | SD |
$0.5000 |
$0.1000 |
$0.1000 |
$0.1100 |
| 83 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 590 | SD |
$15.00 |
$10.00 |
$10.00 |
$11.50 |
| 84 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$28,000.00 |
$6,500.00 |
$7,040.00 |
$15,500.00 |
| 85 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$1,275.00 |
$2,000.00 |
| 86 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$10,000.00 |
$5,000.00 |
$2,500.00 |
$15,000.00 |
| 87 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$160,000.00 |
$131,600.00 |
$157,000.00 |
$175,000.00 |