| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$11,000.00 |
$47,340.00 |
$10,000.00 |
$7,500.00 |
$8,478.63 |
$8,400.00 |
$7,000.00 |
$18,275.32 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,443 | CY |
$7.50 |
$7.00 |
$6.50 |
$9.00 |
$7.95 |
$7.88 |
$7.10 |
$10.61 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,930 | CY |
$9.00 |
$9.00 |
$9.00 |
$10.00 |
$12.72 |
$12.60 |
$9.50 |
$18.33 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$5,500.00 |
$7,000.00 |
$5,299.14 |
$5,250.00 |
$5,350.00 |
$15,182.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 120 | LF |
$1.85 |
$5.00 |
$5.00 |
$7.50 |
$6.35 |
$6.29 |
$5.99 |
$7.55 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 170 | LF |
$8.10 |
$12.00 |
$10.00 |
$12.95 |
$13.72 |
$13.60 |
$12.95 |
$8.83 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 3,014 | SY |
$1.40 |
$2.40 |
$3.50 |
$2.20 |
$2.11 |
$2.09 |
$1.99 |
$2.23 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.22 | AC |
$350.00 |
$200.00 |
$800.00 |
$400.00 |
$528.85 |
$523.95 |
$499.00 |
$558.11 |
| 9 | 307(K) 4300 |
STABILIZED SUBGRADE | 2,789 | SY |
$3.00 |
$10.00 |
$14.50 |
$9.00 |
$3.18 |
$3.15 |
$8.58 |
$10.28 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 20 | TON |
$30.00 |
$57.00 |
$50.00 |
$50.00 |
$52.99 |
$52.50 |
$41.50 |
$30.46 |
| 11 | 407(B) 0250 |
TACK COAT | 186 | GAL |
$3.00 |
$5.00 |
$5.50 |
$4.95 |
$4.95 |
$5.20 |
$15.00 |
$5.54 |
| 12 | 408 5774 |
PRIME COAT | 906 | GAL |
$3.50 |
$6.00 |
$9.00 |
$8.20 |
$8.59 |
$8.61 |
$16.00 |
$9.17 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 580 | TON |
$80.00 |
$85.00 |
$93.45 |
$79.00 |
$76.30 |
$82.95 |
$72.00 |
$88.36 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 185 | TON |
$90.00 |
$90.00 |
$120.65 |
$102.00 |
$98.83 |
$107.10 |
$79.65 |
$114.08 |
| 15 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$300.00 |
$250.00 |
$250.00 |
$505.00 |
$315.00 |
$600.00 |
$433.79 |
| 16 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 5 | TON |
$50.00 |
$200.00 |
$57.00 |
$60.00 |
$86.06 |
$78.75 |
$240.00 |
$67.50 |
| 17 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 67 | LF |
$80.00 |
$115.00 |
$96.00 |
$85.00 |
$84.79 |
$84.00 |
$95.00 |
$103.04 |
| 18 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$1,750.00 |
$1,100.00 |
$1,500.00 |
$1,223.25 |
$1,260.00 |
$1,200.00 |
$1,261.26 |
| 19 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$4,500.00 |
$5,000.00 |
$4,000.00 |
$5,000.00 |
$4,769.23 |
$4,725.00 |
$6,000.00 |
$6,486.97 |
| 20 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,376 | SY |
$3.40 |
$5.00 |
$12.00 |
$5.00 |
$8.70 |
$10.61 |
$5.00 |
$3.46 |
| 21 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,500.00 |
$1,775.00 |
$1,550.00 |
$1,295.00 |
$1,372.48 |
$1,732.50 |
$1,500.00 |
$1,448.39 |
| 22 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,800.00 |
$1,750.00 |
$1,900.00 |
$1,563.00 |
$1,656.51 |
$1,575.00 |
$1,500.00 |
$1,748.13 |
| 23 | 624(A) 4281 |
FENCE-STYLE WWF | 1,122 | LF |
$6.46 |
$5.20 |
$5.45 |
$5.00 |
$4.88 |
$4.83 |
$5.00 |
$7.81 |
| 24 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,000.00 |
$3,500.00 |
$3,500.00 |
$2,820.00 |
$2,013.67 |
$1,995.00 |
$2,640.00 |
$2,125.04 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$25.00 |
$9.75 |
$11.00 |
$25.00 |
$19.76 |
$22.00 |
$80.00 |
$17.77 |
| 26 | 501(F) 6352 |
GRANULAR BACKFILL | 66 | CY |
$50.00 |
$67.00 |
$77.00 |
$80.00 |
$95.24 |
$84.19 |
$60.00 |
$75.38 |
| 27 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 477 | LF |
$230.08 |
$190.00 |
$216.00 |
$225.00 |
$193.55 |
$213.16 |
$260.00 |
$191.00 |
| 28 | 504(B) 1305 |
SAW-CUT GROOVING | 391.7 | SY |
$6.45 |
$3.40 |
$6.00 |
$2.60 |
$2.76 |
$2.86 |
$4.00 |
$2.91 |
| 29 | 504(C) 6250 |
SEALED EXPANSION JOINT | 29.17 | LF |
$311.00 |
$265.00 |
$265.00 |
$225.00 |
$282.97 |
$305.77 |
$350.00 |
$226.90 |
| 30 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 376 | LF |
$75.10 |
$75.00 |
$110.00 |
$85.00 |
$96.67 |
$97.63 |
$110.00 |
$82.58 |
| 31 | 506(A) 1322 |
STRUCTURAL STEEL | 1,060 | LB |
$1.80 |
$3.00 |
$2.75 |
$2.50 |
$4.86 |
$1.71 |
$6.00 |
$2.43 |
| 32 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$1,200.00 |
$850.00 |
$875.00 |
$850.00 |
$819.05 |
$1,121.11 |
$1,200.00 |
$827.72 |
| 33 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$1,500.00 |
$850.00 |
$875.00 |
$850.00 |
$819.05 |
$1,451.11 |
$1,200.00 |
$827.72 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 124.5 | CY |
$570.00 |
$800.00 |
$650.00 |
$625.00 |
$493.52 |
$678.65 |
$650.00 |
$800.00 |
| 35 | 509(B) 1328 |
CLASS A CONCRETE | 124.5 | CY |
$600.00 |
$200.00 |
$580.00 |
$625.00 |
$865.73 |
$786.33 |
$650.00 |
$532.61 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 45,800 | LB |
$1.03 |
$0.8600 |
$0.9000 |
$0.9200 |
$1.26 |
$1.01 |
$1.00 |
$0.7700 |
| 37 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 194 | LF |
$40.00 |
$31.50 |
$35.00 |
$45.00 |
$32.00 |
$41.11 |
$30.00 |
$19.97 |
| 38 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 455 | LF |
$38.00 |
$35.00 |
$43.00 |
$55.00 |
$37.75 |
$47.20 |
$35.00 |
$25.21 |
| 39 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 194 | LF |
$16.20 |
$13.50 |
$17.00 |
$10.00 |
$24.21 |
$11.00 |
$20.00 |
$25.51 |
| 40 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 454 | LF |
$16.00 |
$15.00 |
$18.00 |
$10.00 |
$20.69 |
$11.00 |
$25.00 |
$16.37 |
| 41 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 42 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 174 | LF |
$773.07 |
$645.00 |
$710.00 |
$850.00 |
$742.34 |
$722.38 |
$950.00 |
$950.00 |
| 43 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 850 | TON |
$41.20 |
$49.00 |
$50.00 |
$55.00 |
$51.22 |
$53.62 |
$43.55 |
$47.72 |
| 44 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 250 | TON |
$35.10 |
$44.00 |
$43.00 |
$45.00 |
$40.72 |
$41.23 |
$34.00 |
$35.81 |
| 45 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$30.00 |
$20.00 |
$30.00 |
$66.19 |
$30.84 |
$40.00 |
$11.14 |
| 46 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$27.00 |
$30.00 |
$20.00 |
$30.00 |
$27.90 |
$30.40 |
$40.00 |
$10.31 |
| 47 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$12,500.00 |
$30,000.00 |
$10,000.00 |
$35,647.69 |
$38,500.00 |
$10,320.00 |
$50,000.00 |
| 48 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 4,000 | LF |
$0.5000 |
$1.15 |
$0.9100 |
$0.7700 |
$0.8200 |
$0.8100 |
$0.9800 |
$0.8600 |
| 49 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$8,200.00 |
$8,100.00 |
$6,800.00 |
$7,312.82 |
$7,245.00 |
$6,900.00 |
$12,163.06 |
| 50 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$3,500.00 |
$3,700.00 |
$1,275.00 |
$3,574.07 |
$2,625.00 |
$4,500.00 |
$1,424.26 |
| 51 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$66,830.00 |
$58,500.00 |
$20,750.00 |
$74,000.00 |
$61,945.21 |
$68,976.05 |
$97,840.00 |
$75,000.00 |