| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$7,000.00 |
$13,000.00 |
$25,000.00 |
$4,975.00 |
$12,786.50 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,080 | CY |
$13.00 |
$8.00 |
$8.50 |
$5.00 |
$8.75 |
$13.91 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,470 | CY |
$13.00 |
$8.40 |
$10.00 |
$12.00 |
$12.75 |
$13.91 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$3,750.00 |
$5,000.00 |
$6,000.00 |
$5,800.00 |
$5,082.50 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,152 | LF |
$3.00 |
$1.60 |
$1.99 |
$1.49 |
$1.50 |
$1.59 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 70 | LF |
$10.00 |
$9.44 |
$12.95 |
$8.99 |
$8.00 |
$9.62 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 6,946 | SY |
$3.00 |
$2.05 |
$1.59 |
$1.95 |
$2.00 |
$2.09 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.05 | AC |
$736.00 |
$250.00 |
$99.00 |
$199.00 |
$400.00 |
$212.93 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 776 | TON |
$45.00 |
$28.20 |
$29.00 |
$24.00 |
$23.00 |
$25.68 |
| 10 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$359.00 |
$300.00 |
$200.00 |
$300.00 |
$150.00 |
$535.00 |
| 11 | 613(EE) 5610 |
(SP) 18" CORRUGATED POLYPROPYLENE PIPE | 59 | LF |
$60.00 |
$65.00 |
$40.00 |
$27.00 |
$100.00 |
$33.17 |
| 12 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$525.00 |
$550.00 |
$550.00 |
$385.00 |
$1,000.00 |
$652.70 |
| 13 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$1,500.00 |
$8,000.00 |
$3,500.00 |
$2,782.00 |
| 14 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 184 | LF |
$12.00 |
$22.50 |
$20.00 |
$20.00 |
$7.00 |
$21.40 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$70.00 |
$20.00 |
$15.00 |
$25.00 |
$50.00 |
$21.40 |
| 16 | 501(G) 6309 |
CLSM BACKFILL | 56 | CY |
$200.00 |
$175.00 |
$150.00 |
$150.00 |
$300.00 |
$199.88 |
| 17 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 254 | LF |
$220.00 |
$218.61 |
$240.00 |
$260.00 |
$250.00 |
$216.18 |
| 18 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$300.00 |
$231.75 |
$195.00 |
$210.00 |
$200.00 |
$203.86 |
| 19 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 227 | LF |
$76.00 |
$73.00 |
$85.00 |
$125.00 |
$100.00 |
$98.57 |
| 20 | 506(A) 1322 |
STRUCTURAL STEEL | 320 | LB |
$4.00 |
$7.40 |
$3.00 |
$5.00 |
$2.00 |
$2.40 |
| 21 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$875.00 |
$515.00 |
$300.00 |
$200.00 |
$1,000.00 |
$668.51 |
| 22 | 509(A) 1326 |
CLASS AA CONCRETE | 86 | CY |
$800.00 |
$525.00 |
$600.00 |
$804.80 |
$1,000.00 |
$796.46 |
| 23 | 509(B) 1328 |
CLASS A CONCRETE | 39 | CY |
$700.00 |
$550.00 |
$600.00 |
$804.80 |
$250.00 |
$796.46 |
| 24 | 511(A) 1332 |
REINFORCING STEEL | 22,782 | LB |
$1.00 |
$0.9100 |
$0.8500 |
$1.00 |
$1.00 |
$1.43 |
| 25 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 276 | LF |
$50.00 |
$25.00 |
$45.00 |
$20.00 |
$30.00 |
$40.43 |
| 26 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 276 | LF |
$20.00 |
$12.00 |
$10.00 |
$20.00 |
$5.00 |
$21.40 |
| 27 | 514(K) 6260 |
(PL)PILOT HOLES | 240 | LF |
$120.00 |
$118.00 |
$110.00 |
$80.00 |
$200.00 |
$257.71 |
| 28 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 29 | 525(C) 1000 |
(SP)NEST PREVENTION | 1 | LSUM |
$3,000.00 |
$2,500.00 |
$500.00 |
$50.00 |
$2,000.00 |
$107.00 |
| 30 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 954 | TON |
$40.00 |
$42.14 |
$40.00 |
$35.00 |
$30.00 |
$41.85 |
| 31 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 139 | TON |
$35.00 |
$41.82 |
$33.00 |
$30.00 |
$22.00 |
$26.00 |
| 32 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$31.00 |
$35.00 |
$25.00 |
$35.00 |
$75.00 |
$33.01 |
| 33 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$22.00 |
$6.00 |
$25.00 |
$35.00 |
$65.00 |
$33.01 |
| 34 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$14,500.00 |
$10,000.00 |
$15,000.00 |
$20,000.00 |
$13,112.85 |
| 35 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,350.00 |
$1,600.00 |
$1,450.00 |
$1,400.00 |
$1,500.00 |
$1,498.00 |
| 36 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,500.00 |
$2,650.00 |
$2,200.00 |
$2,400.00 |
$2,500.00 |
$2,568.00 |
| 37 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$2,500.00 |
$2,500.00 |
$2,200.00 |
$2,200.00 |
$5,000.00 |
$2,354.00 |
| 38 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$6,930.00 |
$6,500.00 |
$4,800.00 |
$5,000.00 |
$7,062.00 |
| 39 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,850.00 |
$1,275.00 |
$3,500.00 |
$1,000.00 |
$2,675.00 |
| 40 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,879.59 |
$47,500.00 |
$49,000.00 |
$39,950.00 |
$35,000.00 |
$45,410.63 |