| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$45,000.00 |
$23,000.00 |
$35,721.25 |
$30,000.00 |
$25,110.00 |
$47,772.59 |
$48,000.00 |
$5,200.00 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,280 | LF |
$1.85 |
$1.63 |
$1.60 |
$1.49 |
$1.60 |
$1.49 |
$2.25 |
$2.50 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$8.00 |
$9.00 |
$8.50 |
$8.25 |
$9.10 |
$8.25 |
$9.00 |
$14.00 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 7,732 | SY |
$1.60 |
$1.68 |
$1.70 |
$1.53 |
$1.70 |
$1.53 |
$1.53 |
$3.45 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.6 | AC |
$325.00 |
$220.00 |
$200.00 |
$200.00 |
$220.00 |
$200.00 |
$200.00 |
$400.00 |
| 6 | 307(A) 4200 |
FLY ASH | 123 | TON |
$64.00 |
$80.00 |
$93.50 |
$85.00 |
$78.50 |
$85.00 |
$85.00 |
$93.00 |
| 7 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 3,201 | SY |
$4.15 |
$3.25 |
$4.40 |
$3.75 |
$8.70 |
$3.75 |
$3.75 |
$4.00 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 52 | TON |
$52.00 |
$42.00 |
$52.25 |
$45.00 |
$60.00 |
$42.83 |
$43.00 |
$60.00 |
| 9 | 407(B) 0250 |
TACK COAT | 158 | GAL |
$5.50 |
$7.15 |
$7.15 |
$6.50 |
$4.50 |
$6.50 |
$6.50 |
$7.50 |
| 10 | 408 5774 |
PRIME COAT | 1,339 | GAL |
$5.50 |
$9.35 |
$9.35 |
$8.50 |
$7.90 |
$8.50 |
$8.50 |
$8.50 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 723 | TON |
$110.00 |
$148.00 |
$114.40 |
$104.00 |
$82.50 |
$104.00 |
$104.00 |
$180.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 345 | TON |
$122.00 |
$228.00 |
$158.40 |
$144.00 |
$109.00 |
$144.00 |
$144.00 |
$159.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$325.00 |
$350.00 |
$285.00 |
$300.00 |
$632.00 |
$600.00 |
$400.00 |
$350.00 |
| 14 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 90 | LF |
$45.00 |
$50.00 |
$36.00 |
$65.00 |
$45.00 |
$75.00 |
$43.50 |
$65.00 |
| 15 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$1,200.00 |
$1,740.00 |
$2,400.00 |
$2,540.00 |
$1,750.00 |
$1,200.00 |
$2,800.00 |
| 16 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,500.00 |
$2,250.00 |
$4,500.00 |
$5,000.00 |
$1,790.00 |
$5,284.07 |
$5,300.00 |
$4,500.00 |
| 17 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,860 | SY |
$5.00 |
$5.00 |
$3.00 |
$6.00 |
$3.30 |
$5.21 |
$5.25 |
$8.00 |
| 18 | 619(C) 0924 |
SAWING PAVEMENT | 44 | LF |
$5.00 |
$5.00 |
$10.00 |
$5.00 |
$9.30 |
$20.00 |
$6.00 |
$15.00 |
| 19 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 100 | LF |
$20.00 |
$16.50 |
$17.33 |
$15.00 |
$17.50 |
$15.75 |
$15.00 |
$19.50 |
| 20 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,100.00 |
$1,430.00 |
$1,485.00 |
$1,300.00 |
$1,485.00 |
$1,350.00 |
$1,300.00 |
$1,945.00 |
| 21 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,400.00 |
$2,200.00 |
$2,524.50 |
$2,000.00 |
$2,525.00 |
$2,295.00 |
$2,000.00 |
$2,100.00 |
| 22 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 2,500 | LF |
$0.7500 |
$1.54 |
$1.32 |
$1.20 |
$1.40 |
$1.20 |
$1.20 |
$1.80 |
| 23 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$16.00 |
$15.00 |
$8.50 |
$15.00 |
$19.00 |
$60.00 |
$24.00 |
$12.00 |
| 24 | 501(G) 6309 |
CLSM BACKFILL | 86 | CY |
$160.00 |
$165.00 |
$152.50 |
$165.00 |
$179.00 |
$300.00 |
$200.00 |
$180.00 |
| 25 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 298 | LF |
$190.00 |
$175.00 |
$161.72 |
$190.00 |
$167.00 |
$185.00 |
$235.00 |
$175.00 |
| 26 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 209 | LF |
$220.00 |
$220.00 |
$230.00 |
$265.00 |
$224.00 |
$230.00 |
$300.00 |
$233.00 |
| 27 | 504(B) 1305 |
SAW-CUT GROOVING | 431.4 | SY |
$4.60 |
$9.50 |
$9.46 |
$8.60 |
$9.50 |
$15.00 |
$9.50 |
$9.00 |
| 28 | 504(C) 6250 |
SEALED EXPANSION JOINT | 66.12 | LF |
$260.00 |
$240.00 |
$243.00 |
$250.00 |
$212.00 |
$260.00 |
$275.00 |
$273.00 |
| 29 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 417.5 | LF |
$75.00 |
$70.00 |
$74.75 |
$75.00 |
$97.00 |
$85.00 |
$88.00 |
$84.00 |
| 30 | 506(A) 1322 |
STRUCTURAL STEEL | 960 | LB |
$2.60 |
$4.00 |
$2.15 |
$2.50 |
$4.50 |
$6.50 |
$3.50 |
$211.00 |
| 31 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 9 | EA |
$805.00 |
$1,250.00 |
$650.00 |
$1,200.00 |
$974.00 |
$1,100.00 |
$1,050.00 |
$475.00 |
| 32 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 9 | EA |
$805.00 |
$1,250.00 |
$650.00 |
$1,200.00 |
$974.00 |
$1,200.00 |
$1,050.00 |
$475.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 139.6 | CY |
$570.00 |
$500.00 |
$608.50 |
$600.00 |
$700.00 |
$650.00 |
$595.00 |
$600.00 |
| 34 | 509(B) 1328 |
CLASS A CONCRETE | 155 | CY |
$570.00 |
$500.00 |
$632.50 |
$600.00 |
$678.00 |
$650.00 |
$695.00 |
$600.00 |
| 35 | 511(A) 1332 |
REINFORCING STEEL | 63,670 | LB |
$0.9000 |
$0.7000 |
$0.8100 |
$0.8900 |
$1.00 |
$1.00 |
$0.9000 |
$1.05 |
| 36 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 180 | LF |
$28.00 |
$25.00 |
$26.60 |
$34.00 |
$41.00 |
$32.00 |
$40.00 |
$27.20 |
| 37 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 420 | LF |
$36.00 |
$30.00 |
$28.70 |
$36.00 |
$50.00 |
$34.00 |
$46.00 |
$31.00 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 180 | LF |
$14.00 |
$15.00 |
$11.40 |
$10.00 |
$28.50 |
$15.00 |
$11.00 |
$15.00 |
| 39 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 420 | LF |
$14.00 |
$15.00 |
$12.30 |
$10.00 |
$24.50 |
$16.00 |
$11.00 |
$12.00 |
| 40 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 41 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 104 | LF |
$750.00 |
$850.00 |
$675.00 |
$850.00 |
$827.00 |
$745.00 |
$825.00 |
$875.00 |
| 42 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 975 | TON |
$48.00 |
$52.00 |
$51.25 |
$60.00 |
$52.00 |
$53.42 |
$55.00 |
$64.00 |
| 43 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 326 | TON |
$45.00 |
$42.00 |
$44.50 |
$53.00 |
$45.00 |
$42.22 |
$44.00 |
$60.00 |
| 44 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 60 | LF |
$28.00 |
$25.00 |
$30.00 |
$30.00 |
$53.50 |
$28.00 |
$32.00 |
$60.00 |
| 45 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$28.00 |
$25.00 |
$30.00 |
$30.00 |
$28.50 |
$29.00 |
$32.00 |
$60.00 |
| 46 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$60,625.00 |
$25,000.00 |
$14,610.00 |
$10,931.00 |
$21,000.00 |
$15,000.00 |
| 47 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$6,000.00 |
$2,900.00 |
$3,200.00 |
$2,640.00 |
$3,850.00 |
$2,640.00 |
$2,640.00 |
$5,650.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$8,600.00 |
$8,500.00 |
$2,980.00 |
$10,450.00 |
$9,900.00 |
$7,900.00 |
$9,100.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$4,000.00 |
$3,100.00 |
$1,200.00 |
$3,490.00 |
$4,600.00 |
$3,500.00 |
$2,800.00 |
| 50 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$90,000.00 |
$47,500.00 |
$53,000.00 |
$74,000.00 |
$85,577.42 |
$101,831.27 |
$85,000.00 |
$51,300.00 |