Bid tab 160209

Let May 19, 2016 · Division 1 · Wagoner Sign up free

‹ May 2016 results

GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NS-414): FROM 0.9 MILES SOUTH OF US-412, EXTEND NORTH IN FAIR OAKS . PROJECT LENGTH = 0.364 MILE

Let date
Thursday, May 19, 2016
Contract
160209
J/P numbers
28506(04)
District
Division 1
County
Wagoner
Highway
Limits
GRADE, DRAIN, SURFACE , AND BRIDGE COUNTY ROAD (NS-414): FROM 0.9 MILES SOUTH OF US-412, EXTEND NORTH IN FAIR OAKS . PROJECT LENGTH = 0.364 MILE
Project number
CIRB-273C(024)RB

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,213,908
1 FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. Low bidder $2,008,146 -9.3%
3 Treas Construction Inc $2,133,448 -3.6% +6.2%
4 RRY SERVICES LLC $2,147,122 -3.0% +6.9%
5 OBC, INC. $2,192,824 -1.0% +9.2%
6 Crossland Construction Company, Inc. $2,279,440 +3.0% +13.5%
7 SHERWOOD CONSTRUCTION CO., INC. $2,481,678 +12.1% +23.6%

Bid tab: unit prices 59 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 FRONTIER BRIDGE…#3 Treas Construct…#4 RRY SERVICES LLC#5 OBC, INC.#6 Crossland Const…#7 SHERWOOD CONSTR…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $25,000.00 $16,854.00 $17,490.00 $25,000.00 $25,000.00 $19,000.00 $44,181.83
2202(A) 0183 UNCLASSIFIED EXCAVATION2,867CY $10.00 $9.35 $9.70 $10.00 $10.00 $5.51 $10.49
3202(D) 0184 UNCLASSIFIED BORROW22,942CY $8.00 $8.01 $8.30 $10.00 $9.00 $14.61 $17.41
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $3,000.00 $19,610.00 $20,350.00 $8,000.00 $35,000.00 $24,903.00 $37,740.48
5221(C) 2801 TEMPORARY SILT FENCE1,500LF $2.15 $2.11 $2.19 $1.99 $2.12 $2.24 $5.52
6221(F) 0100 TEMPORARY SILT DIKE42LF $8.50 $10.55 $11.00 $9.95 $10.60 $7.63 $9.36
7230(A) 2806 SOLID SLAB SODDING14,725.61SY $1.50 $1.42 $1.50 $1.34 $1.65 $1.45 $1.73
8233(A) 2817 VEGETATIVE MULCHING2.98AC $325.00 $206.70 $214.50 $195.00 $207.67 $211.00 $252.27
9303(A) 2100 AGGREGATE BASE TYPE A600CY $50.00 $42.19 $43.80 $45.00 $45.00 $43.31 $50.27
10307(A) 4200 FLY ASH124.56TON $60.00 $89.57 $93.00 $75.00 $85.00 $81.20 $68.00
11307(E) 4240 CEMENTITIOUS STABILIZED SUBGRADE4,942.89SY $5.00 $2.54 $2.64 $4.25 $2.56 $5.04 $3.27
12325 5271 SEPARATOR FABRIC5,467.21SY $1.60 $1.75 $1.81 $1.50 $1.81 $1.01 $1.30
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E600TON $27.50 $18.55 $19.25 $20.00 $18.64 $32.48 $22.75
14407(B) 0250 TACK COAT660.24GAL $4.00 $3.71 $3.85 $3.50 $3.73 $3.27 $6.00
15408 5774 PRIME COAT3,493.72GAL $5.00 $5.30 $5.50 $5.00 $2.50 $4.74 $5.00
16411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,604.97TON $85.00 $67.84 $70.40 $64.00 $69.00 $81.69 $63.00
17411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)511.45TON $100.00 $93.28 $96.80 $88.00 $94.00 $85.56 $82.60
18509(D) 0325 CLASS C CONCRETE50CY $375.00 $380.10 $385.00 $300.00 $346.13 $324.82 $614.66
19601(B) 0536 TYPE I-A PLAIN RIPRAP50TON $55.00 $76.06 $33.00 $35.00 $79.88 $43.31 $64.92
20613(EE) 5610 (SP) 18" CORRUGATED POLYPROPYLENE PIPE84LF $35.00 $32.86 $34.10 $40.00 $33.02 $52.85 $62.59
21613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND4EA $500.00 $477.00 $495.00 $200.00 $479.25 $514.00 $154.75
22619(B) 4728 REMOVAL OF ASPHALT PAVEMENT4,318SY $4.00 $5.30 $3.85 $5.00 $4.90 $3.75 $7.24
23619(C) 0924 SAWING PAVEMENT46LF $6.25 $8.48 $11.00 $5.00 $4.26 $10.83 $10.58
24623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE672LF $20.00 $16.01 $16.60 $17.00 $16.08 $18.41 $30.73
25623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $2,500.00 $1,298.50 $1,347.50 $1,450.00 $1,304.63 $2,490.00 $2,522.54
26623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,500.00 $2,173.00 $2,255.00 $2,200.00 $2,183.25 $2,707.00 $3,961.68
27624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)763LF $3.50 $4.61 $9.60 $4.35 $5.17 $5.25 $5.63
28853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)16EA $15.50 $13.25 $13.75 $15.00 $21.30 $13.00 $16.17
29856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)7,700LF $1.00 $0.8000 $0.8300 $0.7500 $0.8000 $0.8100 $0.9700
30877(A) 8483 PORTABLE LONGITUDINAL BARRIER46LF $70.00 $106.00 $77.00 $100.00 $79.88 $47.08 $68.59
31880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $3,975.00 $4,125.00 $6,750.00 $3,993.75 $14,346.00 $4,851.30
32501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON240CY $20.00 $22.00 $19.80 $15.00 $25.72 $29.78 $16.09
33501(G) 6309 CLSM BACKFILL148CY $150.00 $105.79 $217.90 $125.00 $125.00 $215.82 $168.86
34503(A) 6290 PRESTRESSED CONCRETE BEAMS (TYPE J BT)1,596.01LF $280.00 $240.20 $233.60 $280.00 $260.00 $243.73 $257.06
35504(A) 1304 APPROACH SLAB141.6SY $190.00 $162.35 $254.10 $185.00 $191.47 $115.62 $256.42
36504(B) 1305 SAW-CUT GROOVING1,359.2SY $4.25 $4.24 $5.30 $3.85 $4.10 $4.17 $4.98
37504(C) 6250 SEALED EXPANSION JOINT35.17LF $320.00 $262.25 $294.10 $300.00 $266.48 $160.39 $228.87
38504(D) 6239 CONCRETE RAIL (TR3)877.2LF $65.00 $68.72 $99.00 $75.00 $81.12 $115.32 $95.77
39506(A) 1322 STRUCTURAL STEEL2,940LB $3.25 $2.50 $2.50 $2.30 $3.01 $1.20 $4.89
40507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY16EA $900.00 $1,473.04 $1,436.60 $1,000.00 $1,043.23 $768.00 $1,240.56
41507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY8EA $1,200.00 $1,583.04 $1,436.60 $1,000.00 $1,596.34 $768.00 $1,240.56
42509(A) 1326 CLASS AA CONCRETE426.3CY $600.00 $501.38 $500.50 $575.00 $515.95 $595.59 $609.22
43509(B) 1328 CLASS A CONCRETE153.5CY $660.00 $556.38 $498.30 $600.00 $497.36 $998.09 $693.75
44511(A) 1332 REINFORCING STEEL107,840LB $1.00 $0.8300 $0.9000 $0.8500 $0.9000 $0.5500 $0.8000
45514(A) 6010 PILES, FURNISHED (HP 10X42)266LF $42.00 $34.60 $31.90 $28.00 $24.15 $21.85 $26.81
46514(A) 6011 PILES, FURNISHED (HP 12X53)1,099LF $40.00 $35.13 $36.30 $35.00 $29.57 $27.93 $33.33
47514(B) 6292 PILES, DRIVEN (HP 10X42)266LF $15.00 $11.00 $12.10 $10.00 $9.53 $49.25 $27.74
48514(B) 6294 PILES, DRIVEN (HP 12X53)1,099LF $15.00 $11.00 $12.10 $10.00 $10.62 $42.86 $28.45
49514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
50516(A) 6096 DRILLED SHAFTS 60" DIAMETER218LF $900.00 $837.95 $1,095.60 $900.00 $880.63 $571.33 $948.42
51516(C) 6200 CROSSHOLE SONIC LOGGING4EA $2,800.00 $2,750.00 $7,040.00 $2,500.00 $1,517.63 $1,543.00 $1,843.50
52601(B) 1353 TYPE I-A PLAIN RIPRAP630TON $40.00 $34.93 $36.50 $35.00 $48.21 $33.69 $49.96
53601(C) 1355 TYPE I-A FILTER BLANKET150TON $35.50 $26.26 $27.60 $30.00 $39.76 $43.31 $50.90
54613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND64LF $30.00 $35.38 $27.50 $30.00 $45.61 $20.30 $18.57
55613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $30.00 $23.75 $27.50 $30.00 $15.21 $28.15 $11.36
56619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $20,000.00 $33,000.00 $31,625.00 $20,000.00 $100,810.78 $46,500.00 $25,415.65
57642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $15,000.00 $10,600.00 $31,350.00 $11,788.00 $19,987.92 $6,407.00 $20,197.59
58220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $4,400.00 $4,400.00 $1,000.00 $677.69 $1,100.00 $3,234.20
59641 1552 MOBILIZATION1LSUM $125,000.00 $125,475.99 $95,370.20 $132,500.00 $140,000.00 $120,000.00 $99,264.06