| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$25,000.00 |
$12,000.00 |
$15,000.00 |
$20,000.00 |
$14,000.00 |
$40,000.00 |
$13,800.00 |
$29,250.00 |
$4,600.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 12,489 | CY |
$10.00 |
$7.05 |
$9.99 |
$10.00 |
$10.50 |
$8.25 |
$10.32 |
$10.50 |
$7.68 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$18,000.00 |
$10,000.00 |
$10,000.00 |
$3,500.00 |
$14,000.00 |
$28,000.00 |
$13,920.00 |
$23,000.00 |
$4,600.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 550 | LF |
$1.70 |
$2.00 |
$5.00 |
$2.50 |
$2.00 |
$1.78 |
$2.29 |
$2.50 |
$2.30 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 42 | LF |
$7.00 |
$14.00 |
$10.00 |
$8.30 |
$9.00 |
$14.14 |
$14.89 |
$15.50 |
$14.90 |
| 6 | 221(G) 0150 |
TEMPORARY ROCK FILTER DAM TYPE 1 | 13.2 | CY |
$80.00 |
$80.00 |
$100.00 |
$85.00 |
$30.00 |
$263.72 |
$108.00 |
$1,015.00 |
$115.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 13,588 | SY |
$1.80 |
$1.75 |
$1.99 |
$1.50 |
$1.75 |
$1.59 |
$1.83 |
$2.25 |
$1.83 |
| 8 | 230(F) 2812 |
WATERING | 4,892 | KGAL |
$4.15 |
$2.50 |
$0.1000 |
$2.05 |
$1.00 |
$2.25 |
$6.04 |
$4.00 |
$6.04 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 3 | AC |
$380.00 |
$150.00 |
$55.00 |
$104.00 |
$500.00 |
$112.39 |
$569.25 |
$693.00 |
$569.25 |
| 10 | 234(A) 2824 |
FERTILIZING (10-20-10) | 0.28 | TON |
$700.00 |
$750.00 |
$1,000.00 |
$675.00 |
$700.00 |
$730.54 |
$800.00 |
$973.00 |
$799.25 |
| 11 | 234(A) 4409 |
FERTILIZING (18-46-0) | 0.21 | TON |
$900.00 |
$750.00 |
$1,000.00 |
$2,200.00 |
$700.00 |
$1,043.62 |
$800.00 |
$973.00 |
$799.25 |
| 12 | 241 2832 |
MOWING | 3 | AC |
$54.00 |
$50.00 |
$55.00 |
$50.00 |
$300.00 |
$50.57 |
$115.00 |
$138.50 |
$113.85 |
| 13 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,005 | CY |
$48.00 |
$43.50 |
$42.00 |
$46.00 |
$45.00 |
$51.50 |
$68.00 |
$43.75 |
$47.44 |
| 14 | 325 5271 |
SEPARATOR FABRIC | 3,272 | SY |
$2.00 |
$1.80 |
$1.11 |
$1.20 |
$1.75 |
$1.72 |
$2.40 |
$1.65 |
$2.00 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 680 | TON |
$30.00 |
$21.00 |
$22.50 |
$23.50 |
$30.00 |
$29.00 |
$36.80 |
$43.75 |
$22.54 |
| 16 | 407(B) 0250 |
TACK COAT | 622 | GAL |
$4.00 |
$5.25 |
$4.65 |
$4.40 |
$4.50 |
$2.50 |
$4.89 |
$6.00 |
$4.88 |
| 17 | 408 5774 |
PRIME COAT | 2,648 | GAL |
$5.50 |
$5.20 |
$5.50 |
$4.86 |
$5.25 |
$1.00 |
$5.58 |
$6.75 |
$5.60 |
| 18 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,317 | TON |
$100.00 |
$85.00 |
$82.50 |
$77.00 |
$80.00 |
$65.00 |
$86.00 |
$104.00 |
$85.80 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 471 | TON |
$110.00 |
$90.00 |
$88.00 |
$82.00 |
$85.00 |
$55.00 |
$91.41 |
$111.25 |
$91.40 |
| 20 | 509(D) 0325 |
CLASS C CONCRETE | 55 | CY |
$500.00 |
$275.00 |
$333.00 |
$300.00 |
$340.00 |
$455.00 |
$300.00 |
$315.00 |
$419.75 |
| 21 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 42 | LF |
$25.00 |
$65.00 |
$20.00 |
$19.00 |
$50.00 |
$28.10 |
$30.00 |
$10.00 |
$28.75 |
| 22 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 14 | LF |
$20.00 |
$22.00 |
$20.00 |
$19.00 |
$45.00 |
$21.91 |
$30.00 |
$10.00 |
$28.75 |
| 23 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$1,000.00 |
$1,500.00 |
$500.00 |
$327.00 |
$900.00 |
$1,123.90 |
$750.00 |
$700.00 |
$1,380.00 |
| 24 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 9 | CY |
$80.00 |
$250.00 |
$50.00 |
$50.00 |
$60.00 |
$183.37 |
$75.00 |
$59.00 |
$115.00 |
| 25 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 5 | CY |
$60.00 |
$60.00 |
$100.00 |
$60.00 |
$50.00 |
$128.57 |
$75.00 |
$59.00 |
$115.00 |
| 26 | 613(V) 1180 |
TRENCH EXCAVATION | 17 | CY |
$15.00 |
$10.00 |
$25.00 |
$10.00 |
$20.00 |
$204.27 |
$25.00 |
$17.00 |
$57.50 |
| 27 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$15,000.00 |
$2,500.00 |
$6,375.00 |
$30,000.00 |
$25,000.00 |
$14,400.00 |
$13,200.00 |
$3,450.00 |
| 28 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,009 | SY |
$10.00 |
$5.00 |
$3.00 |
$6.00 |
$14.00 |
$4.50 |
$5.48 |
$5.00 |
$4.60 |
| 29 | 619(C) 0924 |
SAWING PAVEMENT | 273 | LF |
$5.00 |
$6.00 |
$7.00 |
$5.00 |
$6.00 |
$4.51 |
$8.00 |
$3.25 |
$9.20 |
| 30 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,811 | LF |
$6.00 |
$4.42 |
$7.25 |
$4.85 |
$6.00 |
$8.25 |
$7.00 |
$10.00 |
$5.40 |
| 31 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,825 | CY |
$9.50 |
$6.00 |
$12.00 |
$15.00 |
$15.00 |
$4.50 |
$9.50 |
$10.00 |
$7.70 |
| 32 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 450 | CY |
$21.30 |
$10.00 |
$15.00 |
$40.00 |
$25.00 |
$39.00 |
$20.00 |
$22.00 |
$23.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 758.7 | CY |
$575.00 |
$425.00 |
$499.00 |
$550.00 |
$380.00 |
$440.00 |
$435.00 |
$525.00 |
$604.90 |
| 34 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 117,410 | LB |
$1.10 |
$1.02 |
$1.10 |
$0.9000 |
$1.25 |
$1.25 |
$1.45 |
$1.00 |
$1.30 |
| 35 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$25,000.00 |
$15,000.00 |
$22,000.00 |
$6,000.00 |
$15,000.00 |
$30,000.00 |
$16,080.00 |
$13,500.00 |
$19,550.00 |
| 36 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 60 | SD |
$100.00 |
$105.00 |
$250.00 |
$105.00 |
$230.00 |
$112.39 |
$230.00 |
$280.00 |
$115.00 |
| 37 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 3,660 | LF |
$0.2000 |
$0.2700 |
$0.1700 |
$0.2600 |
$0.2500 |
$0.2800 |
$0.2000 |
$0.2100 |
$0.2800 |
| 38 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 500 | EA |
$1.00 |
$0.5300 |
$1.10 |
$0.5200 |
$1.25 |
$1.12 |
$1.15 |
$1.40 |
$0.5800 |
| 39 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 500 | LF |
$0.4000 |
$1.05 |
$0.5500 |
$1.04 |
$0.7500 |
$1.12 |
$0.6500 |
$0.7000 |
$1.15 |
| 40 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,400 | SD |
$0.5000 |
$1.05 |
$0.5500 |
$1.04 |
$0.7500 |
$1.12 |
$0.7500 |
$0.7000 |
$1.15 |
| 41 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,000 | SD |
$1.00 |
$0.2700 |
$0.5500 |
$0.2600 |
$0.7500 |
$0.2800 |
$0.7500 |
$0.7000 |
$0.2900 |
| 42 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,600 | SD |
$1.50 |
$1.60 |
$1.90 |
$1.56 |
$2.00 |
$1.69 |
$2.00 |
$2.45 |
$1.73 |
| 43 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,200 | SD |
$0.6000 |
$0.5500 |
$0.3000 |
$0.5200 |
$0.5000 |
$0.5600 |
$0.4000 |
$0.3500 |
$0.5800 |
| 44 | 880(C) 8848 |
WING BARRICADES | 400 | SD |
$1.00 |
$1.05 |
$3.30 |
$1.04 |
$3.75 |
$1.12 |
$3.25 |
$4.20 |
$1.15 |
| 45 | 880(D) 8854 |
VERTICAL PANELS | 2,600 | SD |
$0.1500 |
$0.2700 |
$0.4000 |
$0.2600 |
$0.5000 |
$0.2800 |
$0.5000 |
$0.5000 |
$0.2900 |
| 46 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 3,800 | SD |
$0.3000 |
$0.2900 |
$0.1200 |
$0.2600 |
$0.1500 |
$0.2800 |
$0.2000 |
$0.1500 |
$0.2900 |
| 47 | 880(F) 8878 |
DRUMS | 1,900 | SD |
$0.2000 |
$0.2900 |
$0.5500 |
$0.2600 |
$0.7500 |
$0.2800 |
$0.6500 |
$0.7000 |
$0.2900 |
| 48 | 880(G) 8890 |
CHANNELIZER CONES | 2,800 | SD |
$0.2500 |
$0.2900 |
$0.5500 |
$0.2600 |
$0.7500 |
$0.2800 |
$0.6500 |
$0.7000 |
$0.2900 |
| 49 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 200 | SD |
$15.00 |
$10.60 |
$30.00 |
$10.40 |
$30.00 |
$11.24 |
$30.00 |
$35.00 |
$11.50 |
| 50 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$100.00 |
$300.00 |
$300.00 |
$208.00 |
$400.00 |
$224.78 |
$300.00 |
$350.00 |
$230.00 |
| 51 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,340 | LF |
$0.3000 |
$2.50 |
$1.75 |
$2.08 |
$2.00 |
$2.25 |
$1.75 |
$2.10 |
$2.30 |
| 52 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,711.00 |
$7,950.00 |
$12,750.00 |
$7,200.00 |
$18,000.00 |
$30,000.00 |
$15,000.00 |
$7,000.00 |
$34,500.00 |
| 53 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,000.00 |
$8,300.00 |
$4,250.00 |
$1,600.00 |
$25,000.00 |
$1,200.00 |
$7,500.00 |
$5,250.00 |
$5,750.00 |
| 54 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$89,277.00 |
$87,500.00 |
$65,000.00 |
$83,149.00 |
$80,000.00 |
$115,000.00 |
$61,000.00 |
$68,740.00 |
$108,413.36 |