Bid tab 160183

Let Apr 21, 2016 · Division 5 · Washita Sign up free

‹ Apr 2016 results

BRIDGE AND APPROACHES SH -152: OVER TAYLOR CREEK , 1.5 MILES WEST OF THE CADDO COUNTY LINE . PROJECT LENGTH = 0.217 MILE

Let date
Thursday, April 21, 2016
Contract
160183
J/P numbers
29524(04)
District
Division 5
County
Washita
Highway
Limits
BRIDGE AND APPROACHES SH -152: OVER TAYLOR CREEK , 1.5 MILES WEST OF THE CADDO COUNTY LINE . PROJECT LENGTH = 0.217 MILE
Project number
ACSTP-275C(032)SS

Bidders 11

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,645,176
1 SEWELL BROS., INC. Low bidder $1,179,670 -28.3%
2 HASKELL LEMON CONSTRUCTION CO. $1,208,009 -26.6% +2.4%
3 BREWER CONSTRUCTION OKLAHOMA, LLC $1,358,773 -17.4% +15.2%
4 MANHATTAN ROAD & BRIDGE COMPANY, LLC $1,390,546 -15.5% +17.9%
5 KLAVER CONSTRUCTION COMPANY, INC. $1,469,343 -10.7% +24.6%
6 K & R BUILDERS, INC. $1,480,858 -10.0% +25.5%
7 Cimarron Construction Company, LLC $1,600,134 -2.7% +35.6%
8 FRONTIER BRIDGE, INC. / BRIDGECO CONTRACTORS, INC. $1,734,968 +5.5% +47.1%
9 CP3 ENTERPRISES, INC. $1,747,319 +6.2% +48.1%
10 EARTH BUILDERS, L.P. $1,825,345 +11.0% +54.7%
11 M.J. HUGHES CONSTRUCTION, INC. $2,000,412 +21.6% +69.6%

Bid tab: unit prices 45 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 SEWELL BROS., I…#2 HASKELL LEMON C…#3 BREWER CONSTRUC…#4 MANHATTAN ROAD …#5 KLAVER CONSTRUC…#6 K & R BUILDERS,…#7 Cimarron Constr…#8 FRONTIER BRIDGE…
1202(A) 0183 UNCLASSIFIED EXCAVATION5,055CY $8.00 $7.00 $7.53 $6.60 $8.00 $6.75 $7.67 $7.27 $7.26
2202(D) 0184 UNCLASSIFIED BORROW20,221CY $9.00 $7.00 $8.93 $8.50 $10.00 $8.00 $10.00 $10.20 $11.10
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $17,000.00 $8,000.00 $13,395.34 $14,125.00 $10,000.00 $20,000.00 $12,000.00 $23,784.50 $13,952.40
4221(C) 2801 TEMPORARY SILT FENCE1,437LF $2.00 $1.12 $1.24 $2.26 $2.50 $2.00 $1.20 $1.33 $1.22
5221(D) 2803 TEMPORARY SEDIMENT FILTER2EA $300.00 $165.00 $206.51 $339.00 $150.00 $300.00 $180.00 $221.26 $180.00
6221(F) 0100 TEMPORARY SILT DIKE273LF $8.50 $6.75 $6.94 $11.30 $9.00 $10.00 $6.50 $7.44 $7.38
7230(A) 2806 SOLID SLAB SODDING26,559SY $2.20 $1.05 $1.06 $1.49 $1.40 $1.35 $1.04 $1.16 $1.15
8233(A) 2817 VEGETATIVE MULCHING5.72AC $275.00 $225.00 $167.44 $565.00 $505.00 $500.00 $100.00 $179.40 $246.00
9241 2832 MOWING11.44AC $97.00 $70.00 $50.23 $113.00 $105.00 $100.00 $50.00 $53.82 $78.00
10310(B) 0149 SUBGRADE, METHOD B5,878SY $2.00 $2.00 $2.23 $1.65 $2.50 $2.00 $3.17 $3.87 $3.00
11407(B) 0250 TACK COAT1,175GAL $2.90 $3.30 $3.91 $3.30 $3.10 $3.84 $3.50 $4.59 $3.60
12408 5774 PRIME COAT2,117GAL $8.00 $3.30 $7.14 $3.30 $1.00 $7.47 $3.50 $8.93 $3.60
13411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)2,798TON $94.00 $77.00 $69.37 $77.38 $72.00 $80.89 $78.71 $96.74 $84.34
14411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)575TON $120.00 $82.00 $92.07 $79.37 $74.00 $107.36 $80.09 $128.40 $86.58
15509(D) 0325 CLASS C CONCRETE250CY $390.00 $250.00 $269.58 $275.00 $250.00 $332.44 $376.00 $343.73 $389.87
16611(G) 5704 INLET CDI RCP DES. 12EA $4,700.00 $3,500.00 $6,474.41 $3,500.00 $4,000.00 $5,800.00 $3,400.00 $4,091.22 $5,299.18
17611(H) 5789 ADD'L DEPTH IN INLET CDI RCP DES. 118VF $160.00 $170.00 $5.58 $300.00 $125.00 $5.00 $290.00 $237.10 $194.94
18613(A) 0491 18" R.C.PIPE CLASS III184LF $89.00 $45.00 $53.58 $80.00 $60.00 $48.00 $60.00 $75.28 $86.27
19613(H) 0450 6" PERFORATED PIPE UNDERDRAIN ROUND82LF $30.00 $25.00 $20.65 $35.00 $18.00 $25.00 $30.00 $24.95 $26.73
20613(I) 1096 6" NON-PERF.PIPE UNDERDRAIN RND.28LF $20.00 $25.00 $20.09 $35.00 $18.00 $25.00 $55.00 $24.95 $31.24
21613(Q) 5946 OUTLET LATERAL HEADWALL1EA $1,100.00 $1,000.00 $1,562.79 $1,000.00 $325.00 $750.00 $1,200.00 $1,101.81 $1,139.63
22619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $5,000.00 $5,581.39 $15,000.00 $6,750.00 $10,000.00 $7,000.00 $12,006.14 $24,000.00
23619(B) 4728 REMOVAL OF ASPHALT PAVEMENT3,279SY $6.50 $2.20 $7.69 $4.50 $2.10 $4.00 $4.60 $9.13 $3.60
24619(B) 4780 REMOVAL OF GUARDRAIL1,026LF $4.50 $2.00 $4.69 $3.00 $3.00 $3.00 $4.00 $7.20 $4.80
25202(A) 1301 UNCLASSIFIED EXCAVATION2,650CY $15.00 $10.00 $7.53 $7.00 $10.00 $6.75 $9.00 $14.31 $7.20
26501(A) 1306 STRUCTURAL EXCAVATION UNCLASSIFIED400CY $25.00 $15.00 $39.07 $20.00 $40.00 $5.00 $17.50 $34.35 $24.00
27509(A) 1326 CLASS AA CONCRETE960.1CY $500.00 $350.00 $235.81 $390.00 $440.00 $328.36 $511.00 $523.25 $643.48
28511(A) 1332 REINFORCING STEEL118,490LB $1.00 $0.7500 $1.04 $0.9000 $1.00 $0.9000 $0.8600 $0.8600 $1.06
29619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $15,000.00 $5,500.00 $13,395.34 $48,800.00 $22,500.00 $35,000.00 $15,000.00 $18,780.07 $12,000.00
30880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF27,840SD $0.3100 $0.3700 $0.1100 $0.1300 $0.1100 $0.3500 $0.4000 $0.4200 $0.1200
31880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF1,920SD $0.7000 $0.2200 $0.4500 $0.5000 $0.4200 $0.2000 $1.10 $0.2400 $0.4600
32880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF960SD $1.60 $0.2200 $0.4500 $0.5000 $0.4200 $0.2000 $1.00 $0.2400 $0.4600
33880(B) 8827 CONSTRUCTION SIGNS 33.0 SF & OVER840SD $4.75 $0.1700 $0.2800 $0.5000 $0.2600 $0.1500 $0.1000 $0.1800 $0.2900
34880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)2,160SD $1.05 $0.2700 $0.1700 $0.2500 $0.1600 $0.2500 $0.5000 $0.3000 $0.1700
35880(C) 8848 WING BARRICADES480SD $1.00 $0.1100 $0.1700 $0.2500 $0.1600 $0.1000 $0.0500 $0.1200 $0.1700
36880(E) 8860 WARNING LIGHTS(TYPE A)5,280SD $0.3000 $0.3200 $0.0600 $0.1000 $0.0600 $0.3000 $0.2900 $0.3600 $0.0600
37882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN268SD $14.50 $17.00 $6.70 $8.00 $6.25 $15.00 $20.00 $17.94 $6.90
38413(B) 4863 RUMBLE STRIP-METHOD HMA-CYC2,245LF $0.4500 $3.00 $0.6300 $0.6500 $0.6000 $2.51 $2.75 $3.29 $6.39
39805(A) 8722 (PL)REMOVAL OF EXISTING SIGNS1LSUM $200.00 $100.00 $83.72 $150.00 $77.00 $3,500.00 $45.00 $299.00 $86.25
40850(A) 8110 SHEET ALUMINUM SIGNS17.5SF $25.00 $22.00 $27.91 $50.00 $26.00 $20.00 $20.00 $23.92 $28.75
41851(C) 8330 2 1/2" SQUARE TUBE POST28LF $12.00 $17.00 $15.63 $20.00 $14.50 $15.00 $14.00 $17.94 $16.10
42855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)4,600LF $0.5500 $0.6700 $0.9300 $1.25 $0.8600 $0.6500 $0.8600 $0.7800 $0.9600
43642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $12,000.00 $6,270.00 $8,483.71 $18,000.00 $7,650.00 $20,000.00 $8,800.00 $7,474.84 $7,022.50
44220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $4,000.00 $3,348.83 $13,000.00 $1,775.00 $15,000.00 $4,000.00 $9,165.71 $4,025.00
45641 1399 MOBILIZATION1LSUM $100,000.00 $75,000.00 $108,317.66 $67,000.00 $94,500.00 $212,600.54 $66,000.00 $16,045.26 $112,799.41

Showing the first 8 bidders. The Excel and CSV downloads include all 11.