Bid tab 150244

Let Sep 17, 2015 · Division 8 · Rogers Sign up free

‹ Sep 2015 results

INTERSECTION MODIFICATION SH -20: AT THE INTERSECTION OF SOUTHHAVEN RD/CLUBHOUSE RD IN CLAREMORE. PROJECT LENGTH = 0.664 MILE

Let date
Thursday, September 17, 2015
Contract
150244
J/P numbers
27167(04)
District
Division 8
County
Rogers
Highway
Limits
INTERSECTION MODIFICATION SH -20: AT THE INTERSECTION OF SOUTHHAVEN RD/CLUBHOUSE RD IN CLAREMORE. PROJECT LENGTH = 0.664 MILE
Project number
STP-266A(001)SS

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$3,279,686
1 BECCO CONTRACTORS, INC. Low bidder $3,087,000 -5.9%
2 APAC-CENTRAL, INC. $3,387,804 +3.3% +9.7%
3 Paragon Contractors, LLC $3,647,417 +11.2% +18.2%

Bid tab: unit prices 119 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BECCO CONTRACTO…#2 APAC-CENTRAL, I…#3 Paragon Contrac…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $65,000.00 $37,922.48 $24,500.00
2202(A) 0183 UNCLASSIFIED EXCAVATION13,042CY $9.00 $8.00 $17.76 $28.00
3202(D) 0184 UNCLASSIFIED BORROW831CY $10.00 $8.00 $20.63 $14.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $50,000.00 $59,820.53 $68,000.00
5221(C) 2801 TEMPORARY SILT FENCE3,173LF $2.30 $3.00 $2.15 $1.60
6221(D) 2803 TEMPORARY SEDIMENT FILTER13EA $125.00 $100.00 $139.40 $165.00
7221(F) 0100 TEMPORARY SILT DIKE168LF $8.00 $10.00 $10.32 $7.45
8221(G) 0150 TEMPORARY ROCK FILTER DAM TYPE 16CY $115.00 $200.00 $36.41 $78.00
9230(A) 2806 SOLID SLAB SODDING19,073SY $1.50 $1.00 $1.03 $1.00
10233(A) 2817 VEGETATIVE MULCHING5.7AC $500.00 $100.00 $102.93 $100.00
11241 2832 MOWING12AC $60.00 $40.00 $42.26 $41.00
12303(A) 2100 AGGREGATE BASE TYPE A5,850CY $40.00 $38.00 $39.17 $39.50
13307(K) 4300 STABILIZED SUBGRADE28,509SY $5.00 $7.00 $5.70 $8.65
14325 5271 SEPARATOR FABRIC34,214SY $1.50 $1.50 $1.50 $1.20
15402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E2,901TON $40.00 $21.00 $25.26 $28.00
16407(B) 0250 TACK COAT5,057GAL $2.50 $3.00 $2.83 $4.00
17408 5774 PRIME COAT10,315GAL $4.50 $0.5000 $8.00 $4.05
18411(B) 5935 SUPERPAVE, TYPE S3(PG 76-28 OK)3,170TON $85.00 $60.00 $70.27 $67.00
19411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)8,528TON $80.00 $55.00 $60.12 $60.00
20411(C) 5950 SUPERPAVE, TYPE S4(PG 76-28 OK)2,108TON $90.00 $75.00 $85.55 $86.00
21411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)1,461TON $85.00 $70.00 $77.79 $85.00
22504(F) 6006 HANDRAILING128LF $54.00 $200.00 $193.95 $77.00
23509(D) 0325 CLASS C CONCRETE23CY $325.00 $400.00 $433.30 $423.00
24609(B) 1525 2'-8" COMB. CURB & GUTTER (6" BARRIER)5,799LF $18.00 $20.00 $19.29 $18.30
25610(A) 0602 4" CONCRETE SIDEWALK1,414SY $50.00 $50.00 $61.44 $38.15
26610(B) 0604 6" CONCRETE DRIVEWAY525SY $55.00 $60.00 $64.76 $65.00
27610(I) 4610 TACTILE WARNING DEVICE-NEW80SF $20.00 $30.00 $18.90 $19.00
28611(A) 2657 MANHOLE (4' DIAMETER)7EA $2,000.00 $3,500.00 $3,850.00 $3,710.00
29611(A) 2658 MANHOLE (5' DIAMETER)1EA $2,500.00 $4,500.00 $4,399.99 $4,240.00
30611(B) 2680 ADD'L.DEPTH IN MANHOLE (4' DIAMETER)4VF $165.00 $285.00 $275.00 $265.00
31611(G) 4012 SPECIAL INLET DRAIN1EA $2,500.00 $4,000.00 $3,850.00 $3,700.00
32611(G) 5114 INLET CI DES. 2 (C)1EA $2,700.00 $4,000.00 $4,950.00 $4,800.00
33611(G) 5115 INLET CI DES. 2 (D)1EA $3,000.00 $4,300.00 $5,499.99 $5,300.00
34611(G) 5120 INLET CI DES. 3 (STD)1EA $3,500.00 $5,300.00 $5,499.99 $5,300.00
35611(G) 5122 INLET CI DES. 3 (D)7EA $4,000.00 $6,000.00 $7,149.99 $6,900.00
36611(G) 5125 INLET CI DES. 3 (2D)1EA $4,500.00 $7,000.00 $9,349.99 $9,000.00
37611(G) 6000 INLET (SMD-TYPE 1)1EA $2,250.00 $3,500.00 $2,750.00 $2,700.00
38611(H) 5196 ADDITIONAL DEPTH IN INLET16VF $200.00 $265.00 $440.00 $425.00
39613(A) 0491 18" R.C.PIPE CLASS III1,405LF $60.00 $57.00 $71.50 $69.00
40613(A) 0493 30" R.C.PIPE CLASS III66LF $75.00 $93.00 $99.00 $95.00
41613(A) 0494 36" R.C.PIPE CLASS III216LF $90.00 $100.00 $137.50 $133.00
42613(A) 4495 22" X 13" R.C.PIPE ARCH CLASS A-III98LF $75.00 $180.00 $99.00 $95.00
43613(A) 4497 36" X 22" R.C.PIPE ARCH CLASS A-III796LF $120.00 $130.00 $115.50 $112.00
44613(B) 0688 12" CORR. GALV. STEEL PIPE103LF $40.00 $20.00 $44.00 $43.00
45613(B) 0689 18" CORR. GALV. STEEL PIPE176LF $45.00 $25.00 $55.00 $53.00
46613(B) 0694 48" CORR. GALV. STEEL PIPE28LF $70.00 $50.00 $99.00 $95.00
47613(J) 5915 EDGE DRAIN CONDUIT-PERFORATED5,420LF $6.00 $8.00 $8.50 $7.30
48613(K) 5916 EDGE DRAIN OUTLET LATERAL-NONPERFORATED71LF $10.50 $8.00 $25.41 $7.30
49613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND4EA $1,500.00 $1,500.00 $2,090.00 $3,400.00
50613(M) 7186 TYPE A4 CULVERT END TREATMENT13EA $850.00 $1,000.00 $880.00 $850.00
51613(M) 7188 TYPE C4 CULVERT END TREATMENT1EA $1,300.00 $1,100.00 $1,649.99 $1,600.00
52613(M) 7192 TYPE BB4 CULVERT END TREATMENT2EA $1,125.00 $1,500.00 $1,650.01 $1,600.00
53613(Q) 5946 OUTLET LATERAL HEADWALL8EA $500.00 $800.00 $425.89 $418.00
54619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $10,000.00 $17,692.58 $34,241.88 $31,000.00
55619(B) 4725 REMOVAL OF FENCE3,465LF $1.00 $4.00 $4.22 $2.40
56619(B) 4728 REMOVAL OF ASPHALT PAVEMENT17,617SY $7.50 $4.00 $3.40 $5.45
57619(B) 4766 REMOVAL OF CONCRETE DRIVEWAY787SY $8.00 $4.00 $9.57 $8.90
58619(B) 4792 REMOVAL OF SIDEWALK197SY $7.00 $4.00 $13.33 $9.00
59624(E) 4290 FENCE-STYLE CLF (5'HIGH, CLASS A)310LF $6.00 $18.00 $41.90 $15.00
60629(E) 5048 REMOVE AND RESET MAILBOX7EA $100.00 $110.00 $108.35 $135.00
61802(B) 8340 2" PVC SCH.40 PLASTIC CONDUIT BORED100LF $16.00 $22.00 $9.24 $8.90
62802(B) 8342 2" PVC SCH.40 PLASTIC CONDUIT TRENCHED200LF $6.50 $9.00 $6.60 $6.40
63802(B) 8344 3" PVC SCH.40 PLASTIC CONDUIT BORED400LF $22.00 $33.00 $18.15 $17.50
64802(B) 8346 3" PVC SCH.40 PLASTIC CONDUIT TRENCHED200LF $12.00 $11.00 $18.15 $17.50
65803(A) 8065 PULL BOX(SIZE I)9EA $350.00 $440.00 $407.00 $392.00
66803(A) 8066 PULL BOX(SIZE II)2EA $400.00 $495.00 $495.00 $477.00
67804(A) 2915 STRUCTURAL CONCRETE23.2CY $500.00 $660.00 $418.00 $403.00
68804(B) 2916 REINFORCING STEEL3,098.2LB $1.75 $1.10 $1.60 $1.55
69805(D) 8742 (PL)REMOVE & RESET TRAFFIC SIGNAL EQUIPMENT1LSUM $2,000.00 $7,000.00 $3,300.01 $3,180.00
70806(A) 8312 32'MH POLE 40'TS & 10'LMA(G.STL.)1EA $8,000.00 $10,000.00 $9,563.23 $9,215.00
71806(A) 8313 32'MH POLE 45'TS & 10'LMA(G.STL.)2EA $8,500.00 $11,000.00 $12,484.39 $12,025.00
72806(A) 8314 32'MH POLE 50'TS & 10'LMA(G.STL.)2EA $9,000.00 $12,000.00 $15,751.55 $15,175.00
73806(A) 8351 32'MH POLE 25',TS & 10'LMA(G.STL.)1EA $6,500.00 $7,000.00 $8,459.88 $8,150.00
74806(A) 8352 32'MH POLE,20'TS & 10'LMA(G.STL.)1EA $6,000.00 $6,000.00 $8,452.45 $8,150.00
75806(B) 8894 10' MTG.HT.TS PED.POLE(G.STL.)1EA $5,000.00 $1,100.00 $723.53 $700.00
76809(A) 8090 ROADWAY LUMINAIRE7EA $1,000.00 $700.00 $490.87 $475.00
77811 8040 1/C NO.6 ELECTRICAL CONDUCTOR1,400LF $1.20 $2.20 $1.79 $1.75
78811 8044 1/C NO.10 ELECTRICAL CONDUCTOR1,100LF $1.00 $0.7000 $1.20 $1.20
79825 8550 TRAFFIC SIGNAL CONTROLLER ASSEMBLY2EA $25,000.00 $30,000.00 $30,027.78 $29,000.00
80828 8132 (PL)DETECTION SYSTEM (VIDEO)1LSUM $36,500.00 $50,000.00 $47,541.97 $45,800.00
81830 8000 PEDESTRIAN PUSH BUTTON12EA $750.00 $1,300.00 $1,650.00 $1,585.00
82831 8231 1WAY 3SEC. ADJ. SIG. HD. S-614EA $550.00 $700.00 $682.00 $655.00
83831 8252 1WAY 3SEC. ADJ. SIG. HD. S-94EA $515.00 $700.00 $715.00 $685.00
84831 8295 1WAY 2SEC. ADJ. PED. SIG. HD. S-2012EA $525.00 $700.00 $539.00 $520.00
85833 3030 BACKPLATE18EA $70.00 $150.00 $159.50 $150.00
86834(A) 8207 5/C TRAFFIC SIGNAL ELECTRICAL CABLE1,100LF $1.25 $2.75 $1.65 $1.60
87834(A) 8208 7/C TRAFFIC SIGNAL ELECTRICAL CABLE250LF $1.50 $3.30 $1.98 $1.90
88834(A) 8209 9/C TRAFFIC SIGNAL ELECTRICAL CABLE200LF $2.25 $3.50 $2.75 $2.65
89834(A) 8210 12/C TRAFFIC SIGNAL ELECTRICAL CABLE1,400LF $2.65 $4.40 $3.68 $3.55
90834(A) 8213 21/C TRAFFIC SIGNAL ELECTRICAL CABLE250LF $3.15 $5.50 $5.06 $4.90
91834(C) 8359 UNDERGROUND COMMUNICATION CABLE1,200LF $1.00 $2.50 $0.7100 $0.7000
92850(C) 8118 MAST ARM MOUNTED SIGNS(ALUMINUM)96.75SF $45.00 $50.00 $41.80 $40.00
93805(A) 8700 REMOVAL OF SIGN FOOTING1EA $800.00 $2,500.00 $1,815.93 $212.00
94805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS8EA $630.00 $55.00 $27.50 $26.00
95805(D) 8756 (PL)REMOVE & RESET EXISTING SIGNS2EA $225.00 $3,300.00 $137.50 $133.00
96850(A) 8110 SHEET ALUMINUM SIGNS44SF $20.00 $22.00 $17.60 $16.00
97851(C) 8327 2 1/4" SQUARE TUBE POST60LF $16.50 $11.00 $6.60 $6.35
98856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)14,533LF $0.7500 $1.00 $0.5500 $0.5500
99856(A) 8540 TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE)97LF $1.75 $11.00 $2.20 $2.15
100856(A) 8548 TRAFFIC STRIPE(MULTI-POLY)(12" WIDE)154LF $5.00 $11.00 $3.30 $3.20
101856(A) 8555 TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE)742LF $2.50 $11.00 $5.50 $5.30
102856(B) 8860 TRAFFIC STRIPE(MULTI-POLY.)(ARROWS)15EA $150.00 $220.00 $110.00 $106.00
103856(B) 8880 TRAFFIC STRIPE(MULTI-POLY.)(WORDS)2EA $200.00 $220.00 $275.00 $265.00
104857(A) 8839 CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE)22,735LF $0.2500 $0.4000 $0.1700 $0.1500
105857(E) 8890 (PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-2200EA $0.6000 $2.20 $2.20 $2.10
106857(F) 8006 PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE)7,506LF $0.2000 $0.4000 $0.2700 $0.2500
107880(A) 8812 ARROW DISPLAY(TYPE C)90SD $5.00 $1.10 $5.50 $5.30
108880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF3,840SD $0.4000 $1.10 $1.10 $1.10
109880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF9,690SD $0.3000 $0.2000 $0.5500 $0.5500
110880(B) 8824 CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF3,870SD $0.6000 $1.10 $1.10 $1.10
111880(C) 8836 CONSTRUCTION BARRICADES(TYPE II)240SD $0.2000 $0.3000 $1.10 $1.10
112880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)7,830SD $0.2500 $0.4000 $0.5500 $0.5000
113880(E) 8860 WARNING LIGHTS(TYPE A)13,980SD $0.1000 $0.0500 $0.0600 $0.0500
114880(F) 8878 DRUMS15,510SD $0.6000 $0.1000 $0.0600 $0.0500
115880(G) 8890 CHANNELIZER CONES17,580SD $0.1500 $0.1000 $0.2200 $0.2000
116882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN900SD $10.00 $2.20 $5.50 $5.30
117642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $30,000.00 $20,000.00 $33,480.12 $31,000.00
118220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $5,000.00 $2,200.00 $16,000.00
119641 1552 MOBILIZATION1LSUM $165,500.00 $175,000.00 $133,000.00 $278,668.49