| 1 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$50,000.00 |
$65,000.00 |
$61,500.00 |
$60,000.00 |
$63,000.00 |
$61,490.36 |
| 2 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,620 | LF |
$1.75 |
$1.18 |
$3.00 |
$1.42 |
$1.18 |
$1.18 |
| 3 | 221(F) 0100 |
TEMPORARY SILT DIKE | 224 | LF |
$8.00 |
$5.44 |
$7.25 |
$5.99 |
$5.44 |
$5.44 |
| 4 | 230(A) 2806 |
SOLID SLAB SODDING | 8,343 | SY |
$1.45 |
$1.17 |
$1.17 |
$1.35 |
$1.17 |
$1.17 |
| 5 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.73 | AC |
$420.00 |
$348.00 |
$348.00 |
$200.00 |
$348.00 |
$348.00 |
| 6 | 307(A) 4200 |
FLY ASH | 138 | TON |
$80.00 |
$61.70 |
$61.70 |
$71.00 |
$61.70 |
$61.70 |
| 7 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 3,632 | SY |
$3.50 |
$4.15 |
$4.15 |
$4.78 |
$4.15 |
$4.15 |
| 8 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 1,202 | LF |
$9.50 |
$6.65 |
$6.65 |
$10.75 |
$9.00 |
$6.65 |
| 9 | 407(B) 0250 |
TACK COAT | 171 | GAL |
$6.25 |
$5.50 |
$5.50 |
$6.00 |
$5.50 |
$5.50 |
| 10 | 408 5774 |
PRIME COAT | 1,272 | GAL |
$6.25 |
$5.50 |
$5.50 |
$6.00 |
$5.50 |
$5.50 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 792 | TON |
$102.00 |
$110.00 |
$110.00 |
$126.50 |
$110.00 |
$110.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 378 | TON |
$118.00 |
$122.00 |
$122.00 |
$140.30 |
$122.00 |
$122.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$200.00 |
$350.00 |
$312.50 |
$350.00 |
$450.00 |
| 14 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 8 | LF |
$98.00 |
$210.00 |
$170.00 |
$185.00 |
$175.00 |
$120.00 |
| 15 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$975.00 |
$1,595.00 |
$2,500.00 |
$1,500.00 |
$2,000.00 |
$1,400.00 |
| 16 | 619(C) 0924 |
SAWING PAVEMENT | 50 | LF |
$5.00 |
$10.00 |
$8.00 |
$21.00 |
$8.00 |
$10.00 |
| 17 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 2,500 | LF |
$1.90 |
$0.5500 |
$0.5500 |
$0.6500 |
$0.5500 |
$0.5500 |
| 18 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$18.00 |
$25.00 |
$18.00 |
$9.00 |
$25.00 |
$50.00 |
| 19 | 501(G) 6309 |
CLSM BACKFILL | 76 | CY |
$155.00 |
$150.00 |
$140.00 |
$165.00 |
$150.00 |
$150.00 |
| 20 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 179 | LF |
$200.00 |
$235.00 |
$320.00 |
$237.00 |
$250.00 |
$390.00 |
| 21 | 504(B) 1305 |
SAW-CUT GROOVING | 152 | SY |
$6.25 |
$19.00 |
$15.00 |
$16.25 |
$14.00 |
$14.00 |
| 22 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 176 | LF |
$76.00 |
$80.00 |
$78.00 |
$87.00 |
$95.00 |
$115.00 |
| 23 | 506(A) 1322 |
STRUCTURAL STEEL | 280 | LB |
$3.00 |
$4.50 |
$4.50 |
$4.00 |
$4.00 |
$25.00 |
| 24 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$850.00 |
$770.00 |
$1,900.00 |
$900.00 |
$1,100.00 |
$1,750.00 |
| 25 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$850.00 |
$770.00 |
$1,900.00 |
$900.00 |
$1,100.00 |
$1,750.00 |
| 26 | 509(A) 1326 |
CLASS AA CONCRETE | 48.5 | CY |
$575.00 |
$785.00 |
$700.00 |
$712.50 |
$800.00 |
$950.00 |
| 27 | 509(B) 1328 |
CLASS A CONCRETE | 60.4 | CY |
$625.00 |
$785.00 |
$750.00 |
$725.00 |
$800.00 |
$950.00 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 21,248 | LB |
$0.9000 |
$1.00 |
$1.10 |
$0.9200 |
$1.10 |
$1.50 |
| 29 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 106 | LF |
$34.00 |
$57.00 |
$58.00 |
$54.60 |
$40.00 |
$21.00 |
| 30 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 235 | LF |
$38.00 |
$60.00 |
$70.00 |
$70.00 |
$47.00 |
$30.00 |
| 31 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 106 | LF |
$16.00 |
$7.00 |
$14.00 |
$23.40 |
$11.00 |
$19.50 |
| 32 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 235 | LF |
$16.00 |
$6.00 |
$14.00 |
$30.00 |
$11.00 |
$19.50 |
| 33 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 34 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 354 | TON |
$50.00 |
$40.00 |
$65.00 |
$47.61 |
$55.00 |
$70.00 |
| 35 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 119 | TON |
$44.00 |
$35.00 |
$50.00 |
$42.94 |
$50.00 |
$70.00 |
| 36 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$28.00 |
$28.00 |
$35.00 |
$39.00 |
$30.00 |
$30.00 |
| 37 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 30 | LF |
$28.00 |
$28.00 |
$36.00 |
$39.00 |
$22.00 |
$25.00 |
| 38 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,000.00 |
$8,500.00 |
$10,000.00 |
$4,675.00 |
$12,000.00 |
$8,435.25 |
| 39 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,650.00 |
$2,100.00 |
$1,990.00 |
$2,300.00 |
$1,990.00 |
$1,990.00 |
| 40 | 623(F) 6029 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 4 | EA |
$1,500.00 |
$1,100.00 |
$1,025.00 |
$1,200.00 |
$1,025.00 |
$1,025.00 |
| 41 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$5,500.00 |
$5,047.00 |
$6,000.00 |
$6,000.00 |
$5,047.00 |
| 42 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$8,200.00 |
$7,500.00 |
$9,500.00 |
$8,000.00 |
$8,300.00 |
| 43 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,500.00 |
$2,400.00 |
$4,500.00 |
$4,000.00 |
$2,500.00 |
$4,500.00 |
| 44 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$46,500.00 |
$34,000.00 |
$38,000.00 |
$55,000.00 |
$65,000.00 |