| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 13,824 | CY |
$10.00 |
$5.54 |
$11.00 |
$10.00 |
$10.00 |
$15.50 |
$20.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,450 | CY |
$20.00 |
$9.76 |
$18.00 |
$12.50 |
$22.50 |
$31.00 |
$30.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$36,000.00 |
$12,531.13 |
$28,266.00 |
$10,000.00 |
$30,000.00 |
$37,000.00 |
$30,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,365 | LF |
$2.50 |
$1.19 |
$2.00 |
$1.25 |
$1.85 |
$2.00 |
$1.19 |
| 5 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 12 | EA |
$150.00 |
$200.00 |
$200.00 |
$250.00 |
$225.50 |
$200.00 |
$200.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 386 | LF |
$15.00 |
$6.12 |
$8.00 |
$7.00 |
$11.55 |
$8.25 |
$6.12 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 52,069 | SY |
$1.50 |
$1.16 |
$1.40 |
$1.25 |
$1.45 |
$1.45 |
$0.9700 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 7.6 | AC |
$500.00 |
$99.00 |
$300.00 |
$125.00 |
$495.00 |
$310.00 |
$99.00 |
| 9 | 241 2832 |
MOWING | 200 | AC |
$60.00 |
$48.00 |
$40.00 |
$100.00 |
$60.50 |
$41.00 |
$48.00 |
| 10 | 307(A) 4200 |
FLY ASH | 4,806 | TON |
$70.00 |
$85.48 |
$62.00 |
$85.00 |
$75.25 |
$68.25 |
$80.50 |
| 11 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 110,176 | SY |
$2.00 |
$0.8000 |
$2.50 |
$2.20 |
$1.85 |
$2.35 |
$3.00 |
| 12 | 310(B) 0149 |
SUBGRADE, METHOD B | 3,160 | SY |
$4.00 |
$0.8000 |
$2.00 |
$2.50 |
$4.35 |
$2.00 |
$3.00 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 646 | TON |
$30.00 |
$37.74 |
$38.00 |
$65.00 |
$53.50 |
$41.50 |
$40.00 |
| 14 | 407(B) 0250 |
TACK COAT | 31,609 | GAL |
$3.00 |
$2.17 |
$2.45 |
$2.20 |
$2.50 |
$4.00 |
$2.50 |
| 15 | 408 5774 |
PRIME COAT | 40,692 | GAL |
$5.00 |
$1.16 |
$3.25 |
$3.50 |
$6.35 |
$4.60 |
$2.50 |
| 16 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 13,202 | TON |
$75.00 |
$84.67 |
$88.00 |
$85.00 |
$93.00 |
$86.65 |
$88.50 |
| 17 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 46,841 | TON |
$75.00 |
$76.16 |
$79.00 |
$75.00 |
$85.00 |
$78.40 |
$84.50 |
| 18 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 14,854 | TON |
$80.00 |
$87.81 |
$91.00 |
$88.00 |
$94.00 |
$92.35 |
$91.00 |
| 19 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 8,621 | TON |
$80.00 |
$79.25 |
$80.00 |
$81.00 |
$87.00 |
$84.50 |
$89.00 |
| 20 | 412 5267 |
COLD MILLING PAVEMENT | 4,170 | SY |
$3.00 |
$2.98 |
$2.50 |
$6.00 |
$6.00 |
$5.00 |
$13.00 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 29 | CY |
$250.00 |
$280.00 |
$280.00 |
$300.00 |
$460.00 |
$300.00 |
$280.00 |
| 22 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 2 | EA |
$2,500.00 |
$1,755.29 |
$1,755.29 |
$4,000.00 |
$3,705.00 |
$1,800.00 |
$1,755.29 |
| 23 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 128 | LF |
$60.00 |
$52.46 |
$59.71 |
$55.00 |
$84.00 |
$61.50 |
$59.71 |
| 24 | 613(A) 4495 |
22" X 13" R.C.PIPE ARCH CLASS A-III | 140 | LF |
$95.00 |
$84.33 |
$84.19 |
$90.00 |
$64.75 |
$87.00 |
$84.19 |
| 25 | 613(A) 4496 |
28" X 18" R.C.PIPE ARCH CLASS A-III | 140 | LF |
$115.00 |
$102.44 |
$102.10 |
$110.00 |
$76.75 |
$105.00 |
$102.10 |
| 26 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 40 | LF |
$45.00 |
$38.20 |
$42.00 |
$55.00 |
$154.75 |
$44.00 |
$42.00 |
| 27 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,250.00 |
$2,139.45 |
$2,139.45 |
$2,200.00 |
$3,900.00 |
$2,200.00 |
$2,139.45 |
| 28 | 613(M) 7191 |
TYPE AA4 CULVERT END TREATMENT | 2 | EA |
$1,350.00 |
$2,190.89 |
$2,190.89 |
$2,300.00 |
$4,250.00 |
$2,300.00 |
$2,190.89 |
| 29 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 2 | EA |
$1,500.00 |
$2,373.83 |
$2,373.83 |
$2,400.00 |
$4,525.00 |
$2,500.00 |
$2,373.83 |
| 30 | 613(N) 7520 |
TYPE A6 SLOPED CONCRETE END SECTION | 1 | EA |
$1,500.00 |
$3,500.00 |
$3,500.00 |
$3,750.00 |
$4,000.00 |
$3,600.00 |
$3,500.00 |
| 31 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$4,760.55 |
$11,060.00 |
$15,000.00 |
$27,000.00 |
$14,500.00 |
$11,060.00 |
| 32 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,882 | SY |
$5.00 |
$7.56 |
$6.75 |
$15.00 |
$8.00 |
$9.35 |
$14.00 |
| 33 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 950 | LF |
$20.00 |
$15.95 |
$15.95 |
$15.95 |
$16.25 |
$16.45 |
$15.95 |
| 34 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 2 | EA |
$1,000.00 |
$1,985.00 |
$695.00 |
$695.00 |
$727.50 |
$716.00 |
$695.00 |
| 35 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 2 | EA |
$2,500.00 |
$695.00 |
$1,985.00 |
$1,985.00 |
$2,150.00 |
$2,045.00 |
$1,985.00 |
| 36 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 20,000 | LF |
$0.1500 |
$0.1400 |
$0.1400 |
$0.1400 |
$0.2200 |
$0.1500 |
$0.1400 |
| 37 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 16,560 | EA |
$0.8000 |
$0.4000 |
$0.4000 |
$0.4000 |
$0.5700 |
$0.4500 |
$0.4000 |
| 38 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 29,710 | LF |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.2600 |
$0.1000 |
$0.1000 |
| 39 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 495 | SD |
$1.25 |
$2.00 |
$2.00 |
$2.00 |
$1.10 |
$2.10 |
$2.00 |
| 40 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 16,710 | SD |
$0.5000 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1000 |
| 41 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 3,545 | SD |
$1.25 |
$1.00 |
$1.00 |
$1.00 |
$1.65 |
$1.10 |
$1.00 |
| 42 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 4,170 | SD |
$1.50 |
$2.00 |
$2.00 |
$2.00 |
$1.65 |
$2.10 |
$2.00 |
| 43 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 3,030 | SD |
$1.50 |
$1.00 |
$1.00 |
$1.00 |
$2.55 |
$1.10 |
$1.00 |
| 44 | 880(C) 8848 |
WING BARRICADES | 1,200 | SD |
$1.50 |
$1.00 |
$1.00 |
$1.00 |
$0.1000 |
$1.10 |
$1.00 |
| 45 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 8,770 | SD |
$0.1500 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.3000 |
$0.1000 |
$0.1000 |
| 46 | 880(F) 8878 |
DRUMS | 15,510 | SD |
$0.4000 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.3000 |
$0.1000 |
$0.1000 |
| 47 | 880(G) 8890 |
CHANNELIZER CONES | 14,925 | SD |
$0.1000 |
$0.1000 |
$0.1000 |
$0.1000 |
$0.3000 |
$0.1000 |
$0.1000 |
| 48 | 880(I) 8902 |
FLAGGER | 60 | SD |
$250.00 |
$50.00 |
$75.00 |
$300.00 |
$10.00 |
$52.00 |
$500.00 |
| 49 | 880(W) 8800 |
PILOT CAR | 1 | LSUM |
$10,000.00 |
$1,988.94 |
$1,100.00 |
$30,000.00 |
$500.00 |
$15,000.00 |
$16,000.00 |
| 50 | 413(B) 4863 |
RUMBLE STRIP-METHOD HMA-CYC | 85,383 | LF |
$0.2000 |
$0.0800 |
$0.0900 |
$0.2000 |
$0.0800 |
$0.1000 |
$0.0900 |
| 51 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$50.00 |
$50.00 |
$50.00 |
$50.00 |
$93.50 |
$52.00 |
$50.00 |
| 52 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 7 | EA |
$100.00 |
$100.00 |
$100.00 |
$100.00 |
$357.50 |
$105.00 |
$100.00 |
| 53 | 805(D) 8764 |
(PL)REMOVE & RESET/RELOCATE ITS EQUIPMENT | 2 | EA |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$1,000.00 |
$2,640.00 |
$1,050.00 |
$1,000.00 |
| 54 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 627 | SF |
$13.50 |
$14.00 |
$14.00 |
$14.00 |
$23.10 |
$14.50 |
$14.00 |
| 55 | 851(C) 8324 |
2" SQUARE TUBE POST | 1,140.5 | LF |
$9.00 |
$7.00 |
$7.00 |
$7.00 |
$9.90 |
$7.25 |
$7.00 |
| 56 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 22 | EA |
$15.00 |
$20.00 |
$20.00 |
$20.00 |
$13.25 |
$20.50 |
$20.00 |
| 57 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 117,132 | LF |
$0.4000 |
$0.3100 |
$0.3100 |
$0.3100 |
$0.3500 |
$0.3000 |
$0.3100 |
| 58 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 5,205 | LF |
$0.6000 |
$0.6500 |
$0.6500 |
$0.6500 |
$0.6500 |
$0.7000 |
$0.6500 |
| 59 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 4,105 | LF |
$2.25 |
$1.00 |
$1.00 |
$1.00 |
$0.7000 |
$1.05 |
$1.00 |
| 60 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 158 | LF |
$2.50 |
$10.00 |
$10.00 |
$10.00 |
$1.35 |
$10.50 |
$10.00 |
| 61 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 47 | EA |
$100.00 |
$70.00 |
$70.00 |
$70.00 |
$100.00 |
$72.50 |
$70.00 |
| 62 | 880(C) 8845 |
BARRICADES(TYPE III) | 3 | EA |
$250.00 |
$125.00 |
$125.00 |
$125.00 |
$346.50 |
$130.00 |
$125.00 |
| 63 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$65,000.00 |
$10,000.00 |
$45,500.00 |
$75,000.00 |
$75,000.00 |
$75,000.00 |
$74,700.00 |
| 64 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$1,000.00 |
$5,000.00 |
$25,000.00 |
$5,000.00 |
$25,000.00 |
$5,000.00 |
| 65 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$360,000.00 |
$263,077.71 |
$210,000.00 |
$409,000.00 |
$134,997.01 |
$535,000.00 |
$422,250.00 |