| 1 | 202(D) 0184 |
UNCLASSIFIED BORROW | 8,465 | CY |
$6.00 |
$10.33 |
$10.60 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$80,000.00 |
$112,931.29 |
$118,500.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 3,430 | LF |
$1.50 |
$1.24 |
$1.35 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,820 | LF |
$6.20 |
$6.95 |
$7.40 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 40,650 | SY |
$1.50 |
$1.05 |
$1.10 |
| 6 | 233(A) 2817 |
VEGETATIVE MULCHING | 8.4 | AC |
$450.00 |
$195.00 |
$206.00 |
| 7 | 307(A) 4200 |
FLY ASH | 3,423 | TON |
$54.00 |
$53.11 |
$54.10 |
| 8 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 67,883 | SY |
$2.25 |
$2.51 |
$2.55 |
| 9 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 12,940 | LF |
$3.50 |
$5.37 |
$3.90 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 276 | TON |
$38.00 |
$53.00 |
$51.25 |
| 11 | 407(B) 0250 |
TACK COAT | 6,724 | GAL |
$3.25 |
$2.78 |
$3.95 |
| 12 | 408 5774 |
PRIME COAT | 23,759 | GAL |
$3.35 |
$2.78 |
$4.10 |
| 13 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 18,968 | TON |
$77.00 |
$79.82 |
$81.75 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,641 | TON |
$87.00 |
$86.54 |
$97.25 |
| 15 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 116 | CY |
$20.00 |
$40.00 |
$12.95 |
| 16 | 501(G) 6309 |
CLSM BACKFILL | 116 | CY |
$145.00 |
$104.80 |
$180.00 |
| 17 | 509(A) 0319 |
CLASS AA CONCRETE | 100.65 | CY |
$525.00 |
$710.00 |
$670.00 |
| 18 | 509(B) 0321 |
CLASS A CONCRETE | 1.1 | CY |
$1,000.00 |
$3,000.00 |
$710.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$325.00 |
$367.00 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 15,377.7 | LB |
$1.00 |
$1.10 |
$1.30 |
| 21 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 40 | LF |
$70.00 |
$168.96 |
$81.00 |
| 22 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 40 | LF |
$80.00 |
$194.55 |
$96.50 |
| 23 | 613(A) 0495 |
42" R.C.PIPE CLASS III | 40 | LF |
$135.00 |
$232.73 |
$152.40 |
| 24 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 40 | LF |
$145.00 |
$258.95 |
$182.50 |
| 25 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 608 | LF |
$29.00 |
$37.47 |
$34.60 |
| 26 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 406 | LF |
$34.00 |
$43.30 |
$38.80 |
| 27 | 613(B) 4527 |
21" X 15" CORR. GALV. STEEL PIPE ARCH | 36 | LF |
$35.00 |
$39.15 |
$41.50 |
| 28 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,250.00 |
$2,357.80 |
$3,105.00 |
| 29 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,050.00 |
$1,467.13 |
$2,105.00 |
| 30 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,150.00 |
$1,655.89 |
$2,265.00 |
| 31 | 613(L) 5736 |
42" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,320.00 |
$2,471.30 |
$3,650.00 |
| 32 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 28 | EA |
$900.00 |
$700.00 |
$1,485.00 |
| 33 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 16 | EA |
$1,060.00 |
$730.00 |
$1,795.00 |
| 34 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$20,000.00 |
$22,253.00 |
$34,215.00 |
| 35 | 619(B) 0291 |
REMOVAL OF HEADWALL | 6 | EA |
$1,800.00 |
$1,700.00 |
$2,265.00 |
| 36 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 481 | LF |
$2.75 |
$2.45 |
$3.00 |
| 37 | 619(C) 0924 |
SAWING PAVEMENT | 112 | LF |
$3.50 |
$4.75 |
$5.45 |
| 38 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 700 | LF |
$19.50 |
$18.00 |
$17.40 |
| 39 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 8 | EA |
$1,600.00 |
$1,675.00 |
$2,132.00 |
| 40 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 8 | EA |
$2,200.00 |
$2,200.00 |
$2,207.00 |
| 41 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 110.62 | SF |
$36.00 |
$36.00 |
$47.50 |
| 42 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 78,271 | LF |
$0.5000 |
$0.3900 |
$0.4200 |
| 43 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$18,000.00 |
$14,500.00 |
$18,500.00 |
| 44 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 876 | CY |
$9.50 |
$6.50 |
$18.55 |
| 45 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 89 | CY |
$10.50 |
$44.00 |
$37.15 |
| 46 | 509(A) 1326 |
CLASS AA CONCRETE | 191.32 | CY |
$490.00 |
$605.00 |
$460.00 |
| 47 | 511(A) 1332 |
REINFORCING STEEL | 26,917.6 | LB |
$0.9500 |
$1.10 |
$1.30 |
| 48 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 50 | TON |
$60.00 |
$55.20 |
$65.00 |
| 49 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 17 | TON |
$50.00 |
$53.76 |
$83.95 |
| 50 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,000.00 |
$3,200.00 |
$34,500.00 |
| 51 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$32,000.00 |
$37,335.00 |
$69,225.00 |
| 52 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$8,500.00 |
$6,750.00 |
$16,450.00 |
| 53 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$150,000.00 |
$164,825.00 |
$196,100.00 |