| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$7,500.00 |
$10,050.34 |
$9,700.00 |
$15,000.00 |
$20,150.00 |
$10,000.00 |
$7,500.00 |
$15,000.00 |
| 2 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$13,000.00 |
$43,306.43 |
$17,500.00 |
$25,000.00 |
$50,975.00 |
$20,000.00 |
$23,000.00 |
$48,000.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$5,025.17 |
$6,000.00 |
$7,500.00 |
$30,300.00 |
$7,000.00 |
$5,000.00 |
$12,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$1.60 |
$1.35 |
$1.35 |
$1.70 |
$4.30 |
$1.50 |
$1.40 |
$1.50 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 350 | LF |
$7.60 |
$7.00 |
$7.00 |
$8.50 |
$11.50 |
$8.00 |
$7.00 |
$8.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 7,000 | SY |
$1.60 |
$1.55 |
$1.55 |
$1.75 |
$1.80 |
$1.65 |
$1.80 |
$1.55 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.04 | AC |
$660.00 |
$200.00 |
$200.00 |
$250.00 |
$700.00 |
$750.00 |
$200.00 |
$740.00 |
| 8 | 307(A) 4200 |
FLY ASH | 197 | TON |
$68.00 |
$82.00 |
$82.00 |
$105.00 |
$68.75 |
$90.00 |
$70.00 |
$82.00 |
| 9 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 3,642 | SY |
$2.90 |
$3.00 |
$2.00 |
$4.00 |
$4.25 |
$5.00 |
$8.00 |
$3.50 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 50 | TON |
$32.00 |
$36.00 |
$40.00 |
$46.50 |
$105.00 |
$35.00 |
$38.00 |
$43.00 |
| 11 | 407(B) 0250 |
TACK COAT | 576 | GAL |
$3.10 |
$3.00 |
$2.50 |
$3.00 |
$2.75 |
$2.75 |
$3.50 |
$2.50 |
| 12 | 408 5774 |
PRIME COAT | 1,275 | GAL |
$6.00 |
$1.50 |
$8.00 |
$5.00 |
$7.80 |
$8.80 |
$2.00 |
$8.00 |
| 13 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 439 | TON |
$78.00 |
$82.60 |
$90.00 |
$85.00 |
$87.50 |
$99.00 |
$96.00 |
$90.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 446 | TON |
$73.00 |
$68.00 |
$85.00 |
$85.00 |
$79.00 |
$94.00 |
$79.00 |
$85.00 |
| 15 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 438 | TON |
$95.00 |
$92.00 |
$100.00 |
$90.00 |
$99.00 |
$110.00 |
$107.00 |
$100.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 20 | CY |
$350.00 |
$340.00 |
$400.00 |
$165.00 |
$365.00 |
$350.00 |
$250.00 |
$350.00 |
| 17 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 345 | TON |
$45.00 |
$43.00 |
$45.00 |
$55.00 |
$60.50 |
$45.00 |
$55.00 |
$60.00 |
| 18 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 60 | LF |
$32.00 |
$32.00 |
$32.00 |
$47.96 |
$67.75 |
$30.00 |
$35.00 |
$60.00 |
| 19 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 4 | EA |
$1,000.00 |
$1,750.00 |
$1,800.00 |
$900.00 |
$3,150.00 |
$1,200.00 |
$1,200.00 |
$1,400.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$3,000.00 |
$5,025.17 |
$3,000.00 |
$1,300.00 |
$8,350.00 |
$2,500.00 |
$4,000.00 |
$5,000.00 |
| 21 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,118 | SY |
$3.10 |
$2.55 |
$10.00 |
$5.00 |
$8.75 |
$5.00 |
$5.00 |
$5.00 |
| 22 | 619(C) 0924 |
SAWING PAVEMENT | 50 | LF |
$2.80 |
$50.00 |
$15.00 |
$6.00 |
$49.00 |
$5.00 |
$5.00 |
$5.00 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 225 | LF |
$16.00 |
$26.67 |
$18.00 |
$30.00 |
$29.25 |
$33.00 |
$40.00 |
$20.00 |
| 24 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 2 | EA |
$1,900.00 |
$1,825.00 |
$1,750.00 |
$2,000.00 |
$2,000.00 |
$2,000.00 |
$2,400.00 |
$1,800.00 |
| 25 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 8 | EA |
$10.00 |
$8.00 |
$14.00 |
$8.00 |
$8.75 |
$10.00 |
$15.00 |
$30.00 |
| 26 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,420 | CY |
$7.20 |
$8.31 |
$7.00 |
$15.50 |
$5.80 |
$10.00 |
$10.00 |
$6.00 |
| 27 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 315 | CY |
$24.00 |
$11.00 |
$5.00 |
$14.00 |
$22.00 |
$20.00 |
$25.00 |
$15.00 |
| 28 | 509(A) 1326 |
CLASS AA CONCRETE | 606.7 | CY |
$550.00 |
$378.00 |
$382.99 |
$380.00 |
$340.00 |
$565.00 |
$577.00 |
$500.00 |
| 29 | 509(D) 0325 |
CLASS C CONCRETE | 40 | CY |
$350.00 |
$340.00 |
$325.00 |
$200.00 |
$285.00 |
$400.00 |
$450.00 |
$350.00 |
| 30 | 511(A) 1332 |
REINFORCING STEEL | 101,850 | LB |
$0.9500 |
$0.8000 |
$0.9000 |
$1.10 |
$1.05 |
$0.9000 |
$1.00 |
$1.00 |
| 31 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,300 | TON |
$45.00 |
$43.00 |
$46.00 |
$52.00 |
$50.00 |
$43.00 |
$50.00 |
$60.00 |
| 32 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 280 | TON |
$38.00 |
$32.00 |
$42.00 |
$48.00 |
$42.00 |
$36.00 |
$40.00 |
$50.00 |
| 33 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$5,025.17 |
$5,000.00 |
$5,000.00 |
$11,000.00 |
$5,000.00 |
$7,000.00 |
$10,000.00 |
| 34 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,050.00 |
$1,800.00 |
$4,500.00 |
$3,350.00 |
$3,355.00 |
$2,000.00 |
$2,000.00 |
| 35 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 3,680 | LF |
$0.7500 |
$0.5000 |
$0.6000 |
$0.7000 |
$0.5500 |
$0.5300 |
$0.7500 |
$0.6500 |
| 36 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$4,000.00 |
$4,805.00 |
$5,485.00 |
$6,500.00 |
$9,750.00 |
$6,500.00 |
$7,500.00 |
$6,000.00 |
| 37 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,000.00 |
$3,500.00 |
$1,900.00 |
$1,600.00 |
$2,500.00 |
$8,000.00 |
$2,700.00 |
| 38 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$65,000.00 |
$90,600.00 |
$70,970.54 |
$57,030.00 |
$65,400.00 |
$45,000.00 |
$33,000.00 |
$65,000.00 |