| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$35,000.00 |
$24,450.00 |
$200.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 21,631 | CY |
$7.00 |
$11.00 |
$6.50 |
$8.75 |
$7.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,250 | CY |
$8.50 |
$11.00 |
$7.50 |
$14.00 |
$12.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$12,000.00 |
$25,000.00 |
$16,956.00 |
$30,000.00 |
$30,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,093 | LF |
$2.00 |
$1.50 |
$1.85 |
$4.00 |
$2.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 168 | LF |
$9.00 |
$4.00 |
$9.00 |
$10.00 |
$9.00 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 850 | LF |
$2.00 |
$2.50 |
$2.80 |
$2.25 |
$2.50 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 32,784 | SY |
$1.80 |
$1.30 |
$1.50 |
$1.15 |
$1.25 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 6.77 | AC |
$575.00 |
$300.00 |
$381.00 |
$295.00 |
$300.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 6.77 | AC |
$750.00 |
$300.00 |
$381.00 |
$295.00 |
$300.00 |
| 11 | 241 2832 |
MOWING | 13.54 | AC |
$100.00 |
$20.00 |
$120.00 |
$95.00 |
$100.00 |
| 12 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 1,915 | CY |
$45.00 |
$42.00 |
$41.50 |
$43.46 |
$50.00 |
| 13 | 307(D) 4230 |
LIME | 283 | TON |
$180.00 |
$160.00 |
$172.00 |
$155.00 |
$100.00 |
| 14 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 15,694 | SY |
$3.00 |
$3.25 |
$2.40 |
$3.95 |
$2.00 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 9,702 | SY |
$1.50 |
$1.25 |
$1.35 |
$1.03 |
$1.50 |
| 16 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 792 | TON |
$25.00 |
$25.00 |
$24.00 |
$22.45 |
$20.00 |
| 17 | 407(B) 0250 |
TACK COAT | 1,693 | GAL |
$3.40 |
$3.00 |
$4.25 |
$3.34 |
$3.00 |
| 18 | 408 5774 |
PRIME COAT | 7,910 | GAL |
$6.30 |
$2.50 |
$6.00 |
$4.64 |
$3.00 |
| 19 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 4,138 | TON |
$70.00 |
$65.00 |
$87.25 |
$68.71 |
$65.00 |
| 20 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,594 | TON |
$80.00 |
$79.00 |
$102.00 |
$80.54 |
$80.00 |
| 21 | 509(D) 0325 |
CLASS C CONCRETE | 179 | CY |
$325.00 |
$300.00 |
$349.00 |
$400.00 |
$400.00 |
| 22 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 356 | LF |
$33.00 |
$26.00 |
$45.00 |
$40.00 |
$100.00 |
| 23 | 613(B) 0696 |
60" CORR. GALV. STEEL PIPE | 200 | LF |
$120.00 |
$100.00 |
$100.00 |
$100.00 |
$250.00 |
| 24 | 613(H) 0450 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 111 | LF |
$13.00 |
$8.50 |
$27.25 |
$30.00 |
$30.00 |
| 25 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 37 | LF |
$18.00 |
$15.00 |
$27.25 |
$30.00 |
$30.00 |
| 26 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$455.00 |
$335.00 |
$470.00 |
$400.00 |
$1,200.00 |
| 27 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 4 | EA |
$1,000.00 |
$410.00 |
$622.00 |
$1,500.00 |
$500.00 |
| 28 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$14,000.00 |
$25,000.00 |
$8,824.00 |
$5,000.00 |
$35,000.00 |
| 29 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 9,997 | SY |
$4.50 |
$2.00 |
$4.25 |
$4.00 |
$5.00 |
| 30 | 619(C) 0924 |
SAWING PAVEMENT | 739 | LF |
$2.50 |
$2.00 |
$4.25 |
$10.74 |
$5.00 |
| 31 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 1,181 | LF |
$6.00 |
$8.00 |
$8.25 |
$10.15 |
$11.00 |
| 32 | 624(C) 7181 |
FENCE-STYLE SWF (6 BARBED WIRE) | 1,804 | LF |
$8.00 |
$8.00 |
$8.25 |
$10.40 |
$11.00 |
| 33 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,370 | CY |
$5.00 |
$17.00 |
$5.95 |
$9.00 |
$10.00 |
| 34 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 177 | CY |
$25.00 |
$30.00 |
$19.00 |
$40.00 |
$15.00 |
| 35 | 509(A) 1326 |
CLASS AA CONCRETE | 428 | CY |
$500.00 |
$400.00 |
$417.00 |
$400.00 |
$450.00 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 61,510 | LB |
$0.9500 |
$1.05 |
$0.9000 |
$1.00 |
$1.00 |
| 37 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$15,000.00 |
$15,000.00 |
$5,000.00 |
$5,000.00 |
| 38 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,540 | LF |
$0.1700 |
$0.1100 |
$0.1400 |
$0.1000 |
$0.1100 |
| 39 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 500 | EA |
$0.4700 |
$1.10 |
$1.25 |
$1.00 |
$1.10 |
| 40 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 650 | LF |
$0.1800 |
$1.10 |
$1.25 |
$1.00 |
$1.10 |
| 41 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,200 | SD |
$0.2300 |
$1.10 |
$1.25 |
$1.00 |
$1.10 |
| 42 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 2,880 | SD |
$0.5600 |
$0.3000 |
$0.3000 |
$0.2500 |
$0.3000 |
| 43 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,400 | SD |
$1.04 |
$1.10 |
$1.25 |
$1.00 |
$1.10 |
| 44 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,160 | SD |
$0.3500 |
$1.00 |
$0.9500 |
$0.7500 |
$0.8000 |
| 45 | 880(C) 8848 |
WING BARRICADES | 480 | SD |
$0.9500 |
$1.10 |
$1.25 |
$1.00 |
$1.10 |
| 46 | 880(D) 8854 |
VERTICAL PANELS | 6,000 | SD |
$0.1500 |
$0.2000 |
$0.2000 |
$0.1500 |
$0.2000 |
| 47 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,240 | SD |
$0.1700 |
$0.1200 |
$0.1400 |
$0.1000 |
$0.1100 |
| 48 | 880(F) 8878 |
DRUMS | 3,000 | SD |
$0.1600 |
$0.1800 |
$0.1900 |
$0.1500 |
$0.2000 |
| 49 | 880(G) 8890 |
CHANNELIZER CONES | 1,800 | SD |
$0.1900 |
$0.2200 |
$0.2500 |
$0.2000 |
$0.2500 |
| 50 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 268 | SD |
$11.25 |
$11.00 |
$12.00 |
$10.00 |
$11.00 |
| 51 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 7,900 | LF |
$0.4000 |
$0.7500 |
$0.9000 |
$0.7000 |
$0.8000 |
| 52 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$45,000.00 |
$30,000.00 |
$8,000.00 |
$8,500.00 |
$45,000.00 |
| 53 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$3,175.00 |
$6,000.00 |
$5,000.00 |
| 54 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$95,000.00 |
$50,000.00 |
$95,000.00 |
$154,000.00 |
$100,000.00 |