Bid tab 140124

Let Mar 20, 2014 · · Leflore Sign up free

‹ Mar 2014 results

BRIDGE AND APPROACHES COUNTY ROAD (EW-142): OVER CASTON CREEK , 0.7 MILE WEST AND 0.5 MILE SOUTH OF THE US -59/US-270 JCT. PROJECT LENGTH = 0.406 MILES

Let date
Thursday, March 20, 2014
Contract
140124
J/P numbers
25096(04)
District
County
Leflore
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (EW-142): OVER CASTON CREEK , 0.7 MILE WEST AND 0.5 MILE SOUTH OF THE US -59/US-270 JCT. PROJECT LENGTH = 0.406 MILES
Project number
CIRB-140D(160)RB

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$2,226,977
1 BECCO CONTRACTORS, INC. Low bidder $2,074,431 -6.8%
2 OBC, INC. $2,117,182 -4.9% +2.1%
3 HUB Construction, Inc. $2,133,224 -4.2% +2.8%
4 MANHATTAN ROAD & BRIDGE COMPANY, LLC $2,266,597 +1.8% +9.3%
5 IHC Scott, INC. $2,597,600 +16.6% +25.2%

Bid tab: unit prices 59 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 BECCO CONTRACTO…#2 OBC, INC.#3 HUB Constructio…#4 MANHATTAN ROAD …#5 IHC Scott, INC.
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $80,000.00 $13,800.00 $35,000.00 $11,000.00 $6,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION4,940CY $6.00 $7.00 $8.63 $7.50 $10.50 $13.70
3202(D) 0184 UNCLASSIFIED BORROW2,389CY $8.00 $12.00 $9.78 $9.00 $15.00 $20.70
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $8,900.00 $50,000.00 $9,200.00 $3,600.00 $13,000.00 $12,000.00
5221(C) 2801 TEMPORARY SILT FENCE4,034LF $2.00 $3.00 $2.00 $4.00 $1.45 $1.95
6221(F) 0100 TEMPORARY SILT DIKE266LF $7.00 $10.00 $7.69 $8.00 $7.85 $10.40
7230(A) 2806 SOLID SLAB SODDING18,291SY $2.50 $2.00 $1.83 $2.00 $1.85 $2.50
8233(A) 2817 VEGETATIVE MULCHING7.86AC $500.00 $200.00 $205.85 $350.00 $385.00 $523.00
9303(A) 2100 AGGREGATE BASE TYPE A1,181CY $45.00 $75.00 $63.82 $60.00 $72.00 $101.00
10325 5271 SEPARATOR FABRIC6,864SY $1.50 $1.00 $1.31 $2.00 $1.50 $1.35
11402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E382TON $30.00 $35.00 $31.91 $35.00 $35.00 $60.70
12407(B) 0250 TACK COAT449GAL $3.00 $2.00 $2.01 $2.00 $1.84 $2.45
13408 5774 PRIME COAT4,334GAL $6.00 $3.00 $3.63 $3.50 $3.20 $4.45
14411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,016TON $85.00 $88.00 $101.44 $97.00 $92.00 $124.00
15411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)738TON $95.00 $90.00 $104.28 $105.00 $95.00 $128.00
16509(D) 0325 CLASS C CONCRETE10CY $300.00 $500.00 $482.26 $300.00 $300.00 $810.00
17610(B) 0604 6" CONCRETE DRIVEWAY70SY $80.00 $85.00 $85.48 $60.00 $90.00 $77.40
18613(A) 0491 18" R.C.PIPE CLASS III40LF $25.00 $100.00 $84.03 $60.00 $91.00 $74.10
19613(B) 4527 21" X 15" CORR. GALV. STEEL PIPE ARCH90LF $23.00 $70.00 $41.18 $30.00 $43.00 $51.60
20613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $250.00 $1,800.00 $921.38 $750.00 $850.00 $1,660.00
21613(P) 7025 21" X 15" GALV. STEEL CULVERT END SECTION ARCH6EA $250.00 $600.00 $345.81 $150.00 $170.00 $895.00
22619(B) 4728 REMOVAL OF ASPHALT PAVEMENT3,456SY $4.00 $3.00 $5.70 $3.50 $2.75 $6.10
23619(B) 4766 REMOVAL OF CONCRETE DRIVEWAY85SY $5.00 $8.00 $17.25 $10.00 $10.50 $8.65
24624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)2,691LF $5.00 $7.00 $7.07 $5.50 $6.46 $7.00
25501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON210CY $12.00 $15.00 $38.50 $15.00 $45.00 $23.00
26501(G) 6309 CLSM BACKFILL108CY $120.00 $120.00 $161.55 $152.00 $150.00 $143.00
27503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,834.67LF $250.00 $235.00 $242.55 $230.00 $235.00 $320.00
28504(A) 1304 APPROACH SLAB141.6SY $150.00 $190.00 $171.06 $174.00 $165.00 $174.00
29504(B) 1305 SAW-CUT GROOVING1,541.9SY $200.00 $5.00 $4.24 $5.00 $4.10 $4.20
30504(C) 6250 SEALED EXPANSION JOINT70.34LF $200.00 $250.00 $296.56 $275.00 $250.00 $263.00
31504(D) 6239 CONCRETE RAIL (TR3)986.33LF $65.00 $110.00 $80.02 $65.00 $65.00 $79.50
32506(A) 1322 STRUCTURAL STEEL2,260LB $3.00 $2.00 $2.09 $2.50 $2.00 $2.80
33507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY16EA $3.00 $1,000.00 $1,267.85 $650.00 $1,800.00 $1,217.00
34507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY16EA $3.00 $1,000.00 $1,267.85 $650.00 $1,800.00 $1,217.00
35509(A) 1326 CLASS AA CONCRETE439CY $475.00 $300.00 $517.94 $575.00 $410.00 $562.00
36509(B) 1328 CLASS A CONCRETE166.5CY $475.00 $700.00 $519.79 $600.00 $560.00 $479.00
37511(A) 1332 REINFORCING STEEL127,312LB $1.00 $1.00 $1.05 $0.9500 $1.10 $1.00
38514(A) 6010 PILES, FURNISHED (HP 10X42)140LF $30.00 $35.00 $37.44 $40.00 $36.00 $42.80
39514(A) 6011 PILES, FURNISHED (HP 12X53)407LF $30.00 $40.00 $45.12 $50.00 $46.00 $49.70
40514(B) 6292 PILES, DRIVEN (HP 10X42)140LF $11.00 $25.00 $8.80 $15.00 $15.00 $24.90
41514(B) 6294 PILES, DRIVEN (HP 12X53)407LF $11.00 $25.00 $8.80 $15.00 $18.50 $30.20
42514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
43516(A) 6094 DRILLED SHAFTS 48" DIAMETER222LF $1,000.00 $400.00 $935.38 $1,090.00 $1,250.00 $819.00
44516(C) 6200 CROSSHOLE SONIC LOGGING2EA $2,500.00 $5,000.00 $2,090.00 $5,000.00 $2,700.00 $7,812.00
45601(B) 1353 TYPE I-A PLAIN RIPRAP1,950TON $30.00 $50.00 $43.90 $45.00 $32.00 $66.90
46601(C) 1355 TYPE I-A FILTER BLANKET500TON $25.00 $40.00 $33.25 $34.00 $27.00 $55.40
47613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND64LF $20.00 $30.00 $24.99 $25.00 $20.00 $28.10
48613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.120LF $20.00 $25.00 $17.50 $20.00 $15.00 $24.70
49619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $2,500.00 $40,000.00 $27,500.00 $50,000.00 $150,000.00 $105,000.00
50623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,250.00 $1,600.00 $2,200.00 $2,400.00 $1,500.00 $1,973.00
51623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,230.00 $2,500.00 $2,530.00 $2,500.00 $2,300.00 $3,100.00
52850(A) 8110 SHEET ALUMINUM SIGNS12.5SF $15.00 $15.00 $15.40 $15.00 $14.50 $32.60
53851(C) 8324 2" SQUARE TUBE POST28LF $10.00 $11.00 $11.00 $12.00 $10.50 $11.30
54853 9033 DELINEATORS(TYPE 2, CODE 1)30EA $20.00 $25.00 $22.00 $25.00 $21.00 $28.20
55855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)8,600LF $1.50 $0.9000 $0.8600 $0.9000 $0.8200 $1.15
56880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $3,500.00 $3,436.06 $5,000.00 $3,180.00 $5,000.00
57642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $6,000.00 $15,000.00 $21,835.00 $10,000.00 $20,000.00 $20,000.00
58220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $6,000.00 $3,850.00 $5,000.00 $2,023.00 $15,000.00
59641 1399 MOBILIZATION1LSUM $130,000.00 $125,000.00 $103,139.27 $95,000.00 $138,000.00 $125,000.00