| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$6,000.00 |
$6,000.00 |
$14,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,446 | CY |
$4.00 |
$8.69 |
$5.00 |
$6.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,167 | CY |
$5.00 |
$9.34 |
$6.50 |
$7.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$14,740.97 |
$7,084.00 |
$16,200.00 |
$9,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,418 | LF |
$3.00 |
$1.60 |
$1.60 |
$4.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 210 | LF |
$8.00 |
$5.00 |
$5.00 |
$10.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 21,227 | SY |
$1.00 |
$1.65 |
$1.65 |
$1.34 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 4.39 | AC |
$500.00 |
$375.00 |
$375.00 |
$195.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 815 | CY |
$30.00 |
$42.00 |
$52.68 |
$31.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 97 | TON |
$30.00 |
$20.00 |
$32.00 |
$42.00 |
| 11 | 408 5774 |
PRIME COAT | 3,175 | GAL |
$5.00 |
$4.75 |
$7.22 |
$4.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 776 | TON |
$90.00 |
$91.00 |
$87.20 |
$91.74 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 80 | CY |
$250.00 |
$350.00 |
$425.00 |
$357.00 |
| 14 | 611(G) 6000 |
INLET (SMD-TYPE 1) | 1 | EA |
$2,500.00 |
$3,000.00 |
$3,500.00 |
$3,500.00 |
| 15 | 613(A) 0491 |
18" R.C.PIPE CLASS III | 38 | LF |
$40.00 |
$56.00 |
$45.00 |
$49.50 |
| 16 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 40 | LF |
$70.00 |
$90.00 |
$70.00 |
$82.12 |
| 17 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 56 | LF |
$20.00 |
$25.00 |
$25.00 |
$32.00 |
| 18 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 30 | LF |
$35.00 |
$32.50 |
$35.00 |
$42.00 |
| 19 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 28 | LF |
$40.00 |
$40.00 |
$40.00 |
$49.40 |
| 20 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 1 | EA |
$500.00 |
$1,000.00 |
$500.00 |
$700.00 |
| 21 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$900.00 |
$1,500.00 |
$900.00 |
$990.00 |
| 22 | 613(P) 0760 |
18" GALV. STEEL CULVERT END SECTION ROUND | 2 | EA |
$200.00 |
$185.00 |
$200.00 |
$320.00 |
| 23 | 613(P) 4571 |
28" X 20" GALV. STEEL CULVERT END SECTION ARCH | 2 | EA |
$300.00 |
$200.00 |
$300.00 |
$340.00 |
| 24 | 613(P) 4572 |
35" X 24" GALV. STEEL CULVERT END SECTION ARCH | 2 | EA |
$350.00 |
$300.00 |
$350.00 |
$434.00 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 78 | CY |
$25.00 |
$30.00 |
$24.00 |
$22.00 |
| 26 | 501(D) 6353 |
UNCLASSIFIED BACKFILL | 64 | CY |
$16.00 |
$60.00 |
$40.00 |
$22.00 |
| 27 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 710 | LF |
$200.00 |
$200.00 |
$250.00 |
$200.00 |
| 28 | 504(B) 1305 |
SAW-CUT GROOVING | 453.8 | SY |
$4.50 |
$5.40 |
$5.50 |
$5.40 |
| 29 | 504(C) 6250 |
SEALED EXPANSION JOINT | 29.42 | LF |
$200.00 |
$350.00 |
$335.00 |
$286.00 |
| 30 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 417 | LF |
$75.00 |
$65.00 |
$68.00 |
$92.00 |
| 31 | 506(A) 1322 |
STRUCTURAL STEEL | 4,420 | LB |
$3.50 |
$1.00 |
$4.50 |
$2.00 |
| 32 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 16 | EA |
$750.00 |
$1,050.00 |
$1,000.00 |
$967.00 |
| 33 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 8 | EA |
$750.00 |
$1,050.00 |
$1,000.00 |
$967.00 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 139.4 | CY |
$450.00 |
$625.00 |
$575.00 |
$859.00 |
| 35 | 509(B) 1328 |
CLASS A CONCRETE | 86.2 | CY |
$400.00 |
$625.00 |
$775.00 |
$873.00 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 45,366 | LB |
$1.00 |
$1.00 |
$1.25 |
$0.8000 |
| 37 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 419 | LF |
$30.00 |
$29.00 |
$36.00 |
$37.00 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 419 | LF |
$15.00 |
$25.50 |
$16.00 |
$11.00 |
| 39 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 87 | LF |
$500.00 |
$715.00 |
$600.00 |
$681.00 |
| 40 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 650 | TON |
$30.00 |
$35.00 |
$37.00 |
$32.00 |
| 41 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 150 | TON |
$30.00 |
$31.50 |
$35.00 |
$25.00 |
| 42 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$7,475.00 |
$5,000.00 |
$10,000.00 |
| 43 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 3 | EA |
$2,500.00 |
$2,000.00 |
$2,000.00 |
$3,000.00 |
| 44 | 623(F) 6034 |
GUARDRAIL ANCHOR UNIT (TYPE III) | 1 | EA |
$2,300.00 |
$1,750.00 |
$1,750.00 |
$3,100.00 |
| 45 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 11.43 | SF |
$18.00 |
$12.00 |
$12.00 |
$35.00 |
| 46 | 851(C) 8324 |
2" SQUARE TUBE POST | 28 | LF |
$14.00 |
$6.00 |
$6.00 |
$8.00 |
| 47 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 6,280 | LF |
$0.5000 |
$0.6500 |
$0.6500 |
$0.6200 |
| 48 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$2,200.00 |
$2,200.00 |
$1,875.00 |
| 49 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$3,000.00 |
$9,500.00 |
$8,400.00 |
$8,400.00 |
| 50 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$4,200.00 |
$2,500.00 |
| 51 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$60,000.00 |
$90,000.00 |
$35,000.00 |
$93,100.00 |