| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$37,500.00 |
$21,500.00 |
$8,526.00 |
$10,000.00 |
$16,500.00 |
$32,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,456 | CY |
$8.50 |
$5.00 |
$9.10 |
$4.99 |
$5.50 |
$4.95 |
$12.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 100 | CY |
$15.00 |
$20.00 |
$7.75 |
$11.67 |
$13.00 |
$16.50 |
$14.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 5,215 | LF |
$3.50 |
$1.55 |
$1.75 |
$1.61 |
$1.50 |
$1.71 |
$1.72 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 200 | LF |
$8.00 |
$9.30 |
$8.00 |
$9.59 |
$5.00 |
$8.80 |
$5.74 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 14,000 | SY |
$1.75 |
$1.70 |
$1.62 |
$1.91 |
$1.65 |
$1.71 |
$1.89 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.89 | AC |
$600.00 |
$670.00 |
$650.00 |
$744.20 |
$385.00 |
$440.00 |
$446.55 |
| 8 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 2,342 | TON |
$32.00 |
$26.00 |
$27.84 |
$26.13 |
$29.00 |
$23.84 |
$49.00 |
| 9 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$375.00 |
$350.00 |
$290.00 |
$373.52 |
$410.00 |
$402.88 |
$330.00 |
| 10 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 76 | LF |
$32.00 |
$27.00 |
$27.00 |
$44.25 |
$49.00 |
$16.50 |
$43.00 |
| 11 | 613(L) 4516 |
28" X 20" PREFAB. CULVERT END SECTION, ARCH | 4 | EA |
$400.00 |
$170.00 |
$275.00 |
$284.25 |
$315.00 |
$27.50 |
$340.00 |
| 12 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$8,000.00 |
$2,436.00 |
$2,700.00 |
$22,000.00 |
$25,000.00 |
| 13 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 200 | LF |
$7.00 |
$1.00 |
$7.50 |
$2.44 |
$5.50 |
$4.40 |
$3.80 |
| 14 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 262.5 | LF |
$20.00 |
$20.00 |
$115.50 |
$13.49 |
$33.00 |
$13.29 |
$19.00 |
| 15 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 7 | EA |
$1,200.00 |
$2,420.00 |
$1,375.00 |
$2,455.18 |
$830.00 |
$2,418.90 |
$950.00 |
| 16 | 623(F) 4447 |
GUARDRAIL ANCHOR UNIT (TYPE B) | 1 | EA |
$1,200.00 |
$1,660.00 |
$495.00 |
$1,687.03 |
$550.00 |
$1,662.10 |
$635.00 |
| 17 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$2,320.00 |
$1,650.00 |
$2,352.46 |
$1,500.00 |
$2,317.70 |
$1,600.00 |
| 18 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 1,163 | CY |
$15.00 |
$5.00 |
$6.15 |
$7.31 |
$8.65 |
$13.80 |
$12.00 |
| 19 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 106.44 | CY |
$15.00 |
$15.00 |
$11.87 |
$16.75 |
$20.00 |
$17.25 |
$12.00 |
| 20 | 509(A) 1326 |
CLASS AA CONCRETE | 212 | CY |
$550.00 |
$485.00 |
$490.00 |
$367.68 |
$430.00 |
$536.56 |
$370.00 |
| 21 | 511(A) 1332 |
REINFORCING STEEL | 42,930 | LB |
$0.9000 |
$1.00 |
$0.8800 |
$0.8200 |
$1.00 |
$1.01 |
$1.03 |
| 22 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$8,000.00 |
$5,000.00 |
$12,000.00 |
$11,039.95 |
$12,500.00 |
$17,250.00 |
$30,000.00 |
| 23 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$15.00 |
$15.00 |
$11.00 |
$31.67 |
$30.00 |
$28.75 |
$12.00 |
| 24 | 501(F) 6352 |
GRANULAR BACKFILL | 58 | CY |
$65.00 |
$60.00 |
$75.00 |
$112.97 |
$105.00 |
$131.85 |
$79.00 |
| 25 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 149 | LF |
$205.00 |
$215.00 |
$218.50 |
$232.23 |
$220.00 |
$226.51 |
$220.00 |
| 26 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 314 | LF |
$225.00 |
$220.00 |
$230.00 |
$271.77 |
$245.00 |
$260.48 |
$245.00 |
| 27 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$160.00 |
$170.00 |
$235.00 |
$184.73 |
$175.00 |
$176.71 |
$190.00 |
| 28 | 504(B) 1305 |
SAW-CUT GROOVING | 465.8 | SY |
$5.00 |
$4.30 |
$5.50 |
$5.33 |
$4.75 |
$4.45 |
$4.93 |
| 29 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 370 | LF |
$82.00 |
$65.00 |
$72.50 |
$82.06 |
$77.25 |
$91.77 |
$100.00 |
| 30 | 506(A) 1322 |
STRUCTURAL STEEL | 700 | LB |
$4.25 |
$2.70 |
$2.75 |
$8.22 |
$6.75 |
$4.30 |
$3.40 |
| 31 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,000.00 |
$300.00 |
$420.00 |
$1,172.33 |
$1,050.00 |
$762.20 |
$265.00 |
| 32 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 6 | EA |
$1,100.00 |
$1,250.00 |
$600.00 |
$1,372.28 |
$1,300.00 |
$984.10 |
$885.00 |
| 33 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 6 | EA |
$400.00 |
$750.00 |
$840.00 |
$981.71 |
$930.00 |
$821.72 |
$500.00 |
| 34 | 509(A) 1326 |
CLASS AA CONCRETE | 140.2 | CY |
$525.00 |
$600.00 |
$592.50 |
$788.65 |
$740.00 |
$651.56 |
$600.00 |
| 35 | 509(B) 1328 |
CLASS A CONCRETE | 64.4 | CY |
$525.00 |
$600.00 |
$611.00 |
$778.00 |
$725.00 |
$671.22 |
$625.00 |
| 36 | 511(A) 1332 |
REINFORCING STEEL | 44,600 | LB |
$0.9000 |
$1.00 |
$0.8700 |
$1.06 |
$1.00 |
$1.18 |
$1.06 |
| 37 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 1,009 | LF |
$32.00 |
$35.00 |
$26.60 |
$39.06 |
$37.00 |
$29.41 |
$25.00 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 1,009 | LF |
$15.00 |
$15.00 |
$11.40 |
$15.99 |
$15.00 |
$17.25 |
$16.00 |
| 39 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 175 | LF |
$650.00 |
$800.00 |
$684.00 |
$828.65 |
$785.00 |
$883.72 |
$750.00 |
| 40 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$1,500.00 |
$2,000.00 |
$2,400.00 |
$2,264.72 |
$2,125.00 |
$1,063.75 |
$1,200.00 |
| 41 | 516(D) 6400 |
CSL ACCESS TUBES | 905 | LF |
$7.75 |
$11.00 |
$13.50 |
$12.52 |
$11.50 |
$9.03 |
$12.00 |
| 42 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 805 | TON |
$40.00 |
$36.00 |
$39.81 |
$43.74 |
$44.50 |
$44.17 |
$63.00 |
| 43 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 223 | TON |
$38.00 |
$29.00 |
$31.79 |
$34.50 |
$36.50 |
$36.73 |
$55.00 |
| 44 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 1,018 | SY |
$6.00 |
$7.00 |
$3.00 |
$6.09 |
$7.25 |
$5.88 |
$6.00 |
| 45 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$25.00 |
$30.00 |
$49.02 |
$42.00 |
$24.70 |
$15.00 |
| 46 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$25.00 |
$30.00 |
$19.49 |
$16.00 |
$40.97 |
$16.00 |
| 47 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$15,000.00 |
$12,000.00 |
$14,000.00 |
$20,097.00 |
$40,000.00 |
$28,750.00 |
$30,000.00 |
| 48 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 99 | CY |
$15.00 |
$5.00 |
$18.50 |
$7.31 |
$8.65 |
$27.50 |
$12.00 |
| 49 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 93.59 | CY |
$15.00 |
$15.00 |
$25.00 |
$12.18 |
$13.65 |
$27.50 |
$15.00 |
| 50 | 506(A) 1322 |
STRUCTURAL STEEL | 1,400 | LB |
$4.25 |
$2.70 |
$3.00 |
$7.31 |
$8.25 |
$1.10 |
$9.00 |
| 51 | 509(A) 1326 |
CLASS AA CONCRETE | 114.59 | CY |
$550.00 |
$500.00 |
$567.50 |
$367.68 |
$410.00 |
$678.24 |
$430.00 |
| 52 | 511(A) 1332 |
REINFORCING STEEL | 12,786 | LB |
$0.9000 |
$1.00 |
$1.05 |
$0.9500 |
$1.00 |
$1.41 |
$1.03 |
| 53 | 619(B) 0291 |
REMOVAL OF HEADWALL | 1 | EA |
$5,000.00 |
$5,000.00 |
$8,750.00 |
$4,263.00 |
$5,000.00 |
$8,250.00 |
$20,000.00 |
| 54 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$3,025.00 |
$3,750.00 |
$3,348.28 |
$6,000.00 |
$3,023.90 |
$6,900.00 |
| 55 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$16,000.00 |
$11,850.00 |
$11,000.00 |
$6,090.00 |
$12,000.00 |
$11,825.00 |
$14,000.00 |
| 56 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,000.00 |
$2,400.00 |
$6,500.00 |
$4,263.00 |
$5,000.00 |
$3,850.00 |
$5,700.00 |
| 57 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$75,000.00 |
$43,000.00 |
$58,000.00 |
$46,669.70 |
$70,000.00 |
$69,082.11 |
$90,000.00 |