| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$1,500.00 |
$1,600.00 |
$7,100.00 |
$7,000.00 |
$8,800.00 |
$2,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,422 | CY |
$7.00 |
$11.50 |
$19.00 |
$10.50 |
$7.70 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 584 | CY |
$10.00 |
$18.50 |
$19.00 |
$15.58 |
$14.30 |
$25.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$8,000.00 |
$7,000.00 |
$14,777.21 |
$13,200.00 |
$3,500.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,581 | LF |
$2.00 |
$3.00 |
$2.50 |
$3.40 |
$2.75 |
$3.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 252 | LF |
$7.00 |
$10.00 |
$8.95 |
$10.83 |
$9.85 |
$10.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 1,769 | SY |
$3.00 |
$2.95 |
$2.50 |
$3.36 |
$2.75 |
$3.00 |
| 8 | 232(B) 2814 |
SEEDING METHOD B | 0.74 | AC |
$500.00 |
$995.00 |
$1,500.00 |
$1,139.84 |
$1,650.00 |
$1,650.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.37 | AC |
$450.00 |
$995.00 |
$1,500.00 |
$1,139.84 |
$1,650.00 |
$1,650.00 |
| 10 | 241 2832 |
MOWING | 0.74 | AC |
$65.00 |
$895.00 |
$100.00 |
$1,020.16 |
$110.00 |
$110.00 |
| 11 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,607 | CY |
$55.00 |
$43.00 |
$44.00 |
$43.00 |
$40.70 |
$50.00 |
| 12 | 325 5271 |
SEPARATOR FABRIC | 6,480 | SY |
$1.50 |
$1.50 |
$1.50 |
$1.78 |
$3.30 |
$3.00 |
| 13 | 407(B) 0250 |
TACK COAT | 240 | GAL |
$3.00 |
$5.00 |
$5.00 |
$5.00 |
$5.50 |
$6.00 |
| 14 | 408 5774 |
PRIME COAT | 1,135 | GAL |
$5.00 |
$5.00 |
$5.00 |
$4.50 |
$5.50 |
$7.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 447 | TON |
$95.00 |
$83.29 |
$125.00 |
$97.00 |
$91.62 |
$107.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 367 | TON |
$120.00 |
$93.88 |
$125.00 |
$120.00 |
$103.27 |
$133.00 |
| 17 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 149 | SY |
$15.00 |
$40.00 |
$27.00 |
$96.73 |
$50.00 |
$45.00 |
| 18 | 414(B) 5725 |
DOWEL JOINTED P.C. CONCRETE PAVEMENT(PLACEMENT ) | 5,286 | SY |
$20.00 |
$30.00 |
$28.00 |
$20.11 |
$42.00 |
$30.00 |
| 19 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 1,359 | CY |
$125.00 |
$135.00 |
$133.00 |
$130.00 |
$140.00 |
$200.00 |
| 20 | 609(A) 0287 |
CONCRETE CURB (4" MNTBLE-INTEGRAL) | 2,075 | LF |
$4.00 |
$4.00 |
$2.00 |
$7.45 |
$2.00 |
$19.00 |
| 21 | 609(A) 0300 |
CONCRETE CURB (6" BARRIER-INTEGRAL) | 1,205 | LF |
$5.00 |
$5.85 |
$2.50 |
$11.18 |
$2.50 |
$20.00 |
| 22 | 609(B) 1513 |
1'-8" COMB. CURB & GUTTER (6" BARRIER) | 1,455 | LF |
$20.00 |
$26.50 |
$20.00 |
$27.33 |
$27.00 |
$19.00 |
| 23 | 610(C) 0608 |
4" CONCRETE DIVIDING STRIP | 451 | SY |
$25.00 |
$23.00 |
$47.00 |
$30.38 |
$87.00 |
$52.00 |
| 24 | 613(J) 5915 |
EDGE DRAIN CONDUIT-PERFORATED | 1,428 | LF |
$8.00 |
$11.00 |
$8.00 |
$11.92 |
$9.90 |
$15.00 |
| 25 | 613(K) 5916 |
EDGE DRAIN OUTLET LATERAL-NONPERFORATED | 450 | LF |
$15.00 |
$17.00 |
$10.00 |
$6.39 |
$9.90 |
$15.00 |
| 26 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 8 | EA |
$500.00 |
$1,000.00 |
$250.00 |
$911.87 |
$605.00 |
$850.00 |
| 27 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$2,000.00 |
$2,500.00 |
$10,000.00 |
$9,813.20 |
$11,000.00 |
$2,500.00 |
| 28 | 619(B) 4726 |
REMOVAL OF CURB AND GUTTER | 1,454 | LF |
$5.00 |
$4.50 |
$4.00 |
$6.75 |
$4.40 |
$6.00 |
| 29 | 619(B) 4727 |
REMOVAL OF CONCRETE PAVEMENT | 5,217 | SY |
$5.00 |
$8.50 |
$5.00 |
$6.98 |
$7.70 |
$25.00 |
| 30 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,076 | SY |
$4.00 |
$5.00 |
$4.00 |
$5.33 |
$4.40 |
$10.00 |
| 31 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 1,306 | LF |
$2.00 |
$2.00 |
$2.29 |
$2.47 |
$4.40 |
$2.00 |
| 32 | 619(B) 4791 |
REMOVAL OF CURB | 3,174 | LF |
$2.00 |
$3.15 |
$4.00 |
$3.69 |
$3.30 |
$5.00 |
| 33 | 619(B) 6130 |
REMOVAL OF 4" CONCRETE DIVIDING STRIP | 450 | SY |
$3.00 |
$7.50 |
$3.00 |
$12.42 |
$7.70 |
$15.00 |
| 34 | 619(C) 0924 |
SAWING PAVEMENT | 1,830 | LF |
$3.00 |
$5.00 |
$3.50 |
$1.93 |
$5.50 |
$5.00 |
| 35 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 250 | LF |
$25.00 |
$15.50 |
$13.75 |
$17.67 |
$17.05 |
$18.00 |
| 36 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 6 | EA |
$2,500.00 |
$2,100.00 |
$2,055.00 |
$2,393.67 |
$2,310.00 |
$2,350.00 |
| 37 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 6 | EA |
$3,500.00 |
$1,625.00 |
$1,510.00 |
$1,852.24 |
$1,787.50 |
$1,800.00 |
| 38 | 501(G) 6309 |
CLSM BACKFILL | 30 | CY |
$250.00 |
$155.00 |
$300.00 |
$176.68 |
$440.00 |
$325.00 |
| 39 | 504(A) 1304 |
APPROACH SLAB | 298 | SY |
$175.00 |
$215.00 |
$240.00 |
$245.07 |
$270.00 |
$250.00 |
| 40 | 504(B) 1305 |
SAW-CUT GROOVING | 1,106.6 | SY |
$5.00 |
$4.05 |
$4.05 |
$4.62 |
$4.50 |
$5.00 |
| 41 | 504(E) 6190 |
42" F-SHAPED PARAPET | 369.4 | LF |
$115.00 |
$115.00 |
$120.00 |
$131.08 |
$285.00 |
$125.00 |
| 42 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 265.5 | LF |
$35.00 |
$40.00 |
$50.00 |
$45.59 |
$35.00 |
$25.00 |
| 43 | 505(E) 1000 |
HYDRODEMOLITION | 972.8 | SY |
$100.00 |
$65.00 |
$120.00 |
$74.09 |
$85.00 |
$150.00 |
| 44 | 509(A) 1326 |
CLASS AA CONCRETE | 151.4 | CY |
$750.00 |
$925.00 |
$750.00 |
$1,054.35 |
$810.00 |
$850.00 |
| 45 | 509(D) 1331 |
CLASS C CONCRETE | 13.6 | CY |
$400.00 |
$650.00 |
$800.00 |
$740.90 |
$2,600.00 |
$1,200.00 |
| 46 | 510(C) 6137 |
SLOPE WALL (4") | 526.2 | SY |
$85.00 |
$140.00 |
$130.00 |
$159.58 |
$160.00 |
$130.00 |
| 47 | 511 6306 |
MECHANICAL SPLICES | 187 | EA |
$30.00 |
$35.00 |
$27.00 |
$39.89 |
$11.00 |
$25.00 |
| 48 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 24,807 | LB |
$1.10 |
$1.60 |
$1.70 |
$1.82 |
$0.7000 |
$1.40 |
| 49 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 30 | SY |
$500.00 |
$330.00 |
$375.00 |
$376.15 |
$432.00 |
$500.00 |
| 50 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 434 | SY |
$5.00 |
$3.50 |
$3.50 |
$3.99 |
$3.85 |
$4.00 |
| 51 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 804 | LF |
$30.00 |
$25.00 |
$35.00 |
$28.50 |
$27.50 |
$20.00 |
| 52 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 26.8 | GAL |
$60.00 |
$65.00 |
$60.00 |
$74.09 |
$66.00 |
$80.00 |
| 53 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 79.6 | SY |
$600.00 |
$500.00 |
$750.00 |
$569.92 |
$665.00 |
$600.00 |
| 54 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 449 | SF |
$75.00 |
$80.00 |
$60.00 |
$91.19 |
$67.00 |
$65.00 |
| 55 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 50 | SY |
$30.00 |
$50.00 |
$25.00 |
$2,849.61 |
$82.00 |
$50.00 |
| 56 | 540 4515 |
(PL)REPAIR BRIDGE ITEM (TYPE A) | 44 | EA |
$100.00 |
$125.00 |
$50.00 |
$142.48 |
$71.00 |
$100.00 |
| 57 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$25,000.00 |
$60,000.00 |
$70,000.00 |
$62,691.33 |
$215,000.00 |
$70,000.00 |
| 58 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 3 | EA |
$150.00 |
$100.00 |
$200.00 |
$227.97 |
$220.00 |
$220.00 |
| 59 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 24 | EA |
$25.00 |
$12.00 |
$10.00 |
$11.40 |
$11.00 |
$11.00 |
| 60 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 16,743 | LF |
$0.7500 |
$0.6000 |
$0.3200 |
$0.3600 |
$0.3500 |
$0.3600 |
| 61 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 2,400 | LF |
$0.8000 |
$0.8500 |
$0.5000 |
$0.5700 |
$0.5500 |
$0.5500 |
| 62 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 5,527 | LF |
$1.00 |
$1.20 |
$0.6500 |
$0.7400 |
$0.7200 |
$0.7200 |
| 63 | 871(A) 8325 |
(SP)IMPACT ATTENUATOR | 2 | EA |
$4,500.00 |
$18,500.00 |
$18,500.00 |
$21,087.09 |
$20,350.00 |
$24,000.00 |
| 64 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 4,750 | LF |
$0.2000 |
$0.5000 |
$0.1500 |
$0.1700 |
$0.1700 |
$0.1700 |
| 65 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 5,075 | LF |
$1.00 |
$1.00 |
$0.7500 |
$0.8500 |
$0.8300 |
$0.8300 |
| 66 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 22,000 | LF |
$0.2500 |
$0.1500 |
$0.2000 |
$0.2300 |
$0.2200 |
$0.2200 |
| 67 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 180 | SD |
$10.00 |
$10.00 |
$10.00 |
$11.40 |
$11.00 |
$11.00 |
| 68 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 4,748 | LF |
$30.00 |
$14.50 |
$10.00 |
$18.81 |
$26.95 |
$30.00 |
| 69 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 887 | LF |
$4.00 |
$7.50 |
$15.00 |
$5.70 |
$5.50 |
$10.00 |
| 70 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 5,495 | SD |
$0.7000 |
$0.5000 |
$0.5000 |
$0.5700 |
$0.5500 |
$0.5500 |
| 71 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,170 | SD |
$1.00 |
$2.00 |
$2.00 |
$2.28 |
$2.20 |
$2.50 |
| 72 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 2,345 | SD |
$1.50 |
$3.00 |
$2.00 |
$2.28 |
$2.20 |
$2.50 |
| 73 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 800 | SD |
$1.10 |
$2.50 |
$2.00 |
$2.28 |
$2.20 |
$2.50 |
| 74 | 880(C) 8848 |
WING BARRICADES | 1,080 | SD |
$1.50 |
$1.00 |
$1.00 |
$1.14 |
$1.10 |
$1.10 |
| 75 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 2,525 | SD |
$0.2000 |
$0.3500 |
$0.5000 |
$0.5700 |
$0.5500 |
$0.5500 |
| 76 | 880(F) 8878 |
DRUMS | 13,780 | SD |
$0.2500 |
$0.5500 |
$0.2500 |
$0.2800 |
$0.2800 |
$0.3000 |
| 77 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$26,000.00 |
$15,000.00 |
$19,000.00 |
$7,200.00 |
$5,000.00 |
| 78 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$7,000.00 |
$4,000.00 |
$7,408.98 |
$28,600.00 |
$7,000.00 |
| 79 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$105,934.95 |
$177,000.00 |
$167,000.00 |
$140,200.62 |
$155,000.00 |
$136,000.00 |