| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$18,000.00 |
$15,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 9,160 | CY |
$6.25 |
$7.00 |
$11.00 |
| 3 | 205(A) 4230 |
TYPE A-SALVAGED TOPSOIL | 1,687 | CY |
$3.00 |
$7.75 |
$10.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 4,499 | LF |
$3.00 |
$1.59 |
$1.85 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 440 | LF |
$8.00 |
$10.85 |
$8.00 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 11,734 | SY |
$2.00 |
$1.79 |
$2.16 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.51 | AC |
$350.00 |
$677.00 |
$650.00 |
| 8 | 310(B) 0149 |
SUBGRADE, METHOD B | 8,749 | SY |
$3.00 |
$0.8500 |
$3.00 |
| 9 | 311(B) 0152 |
PROCESSING EXISTING BASE & SURFACE, METHOD B | 2,812 | LF |
$4.00 |
$4.75 |
$6.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 697 | TON |
$20.00 |
$51.00 |
$29.00 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,825 | TON |
$75.00 |
$66.00 |
$89.00 |
| 12 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 969 | TON |
$85.00 |
$83.00 |
$107.00 |
| 13 | 509(D) 0325 |
CLASS C CONCRETE | 70.6 | CY |
$300.00 |
$375.00 |
$325.00 |
| 14 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 243 | LF |
$60.00 |
$68.00 |
$98.00 |
| 15 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 50 | LF |
$90.00 |
$77.00 |
$175.00 |
| 16 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 330 | LF |
$25.00 |
$31.00 |
$27.00 |
| 17 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 8 | EA |
$1,100.00 |
$650.00 |
$1,000.00 |
| 18 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$1,100.00 |
$1,500.00 |
| 19 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 12 | EA |
$900.00 |
$1,000.00 |
$900.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$8,500.00 |
$12,500.00 |
| 21 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 882 | SY |
$5.00 |
$3.50 |
$5.00 |
| 22 | 619(C) 0924 |
SAWING PAVEMENT | 110 | LF |
$5.00 |
$4.50 |
$10.00 |
| 23 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,500.00 |
$1,185.00 |
$1,500.00 |
| 24 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,200.00 |
$1,940.00 |
$2,420.00 |
| 25 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 84 | CY |
$15.00 |
$27.50 |
$8.00 |
| 26 | 501(G) 6309 |
CLSM BACKFILL | 80 | CY |
$115.00 |
$120.00 |
$155.00 |
| 27 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 256.67 | LF |
$200.00 |
$185.00 |
$185.00 |
| 28 | 504(A) 1304 |
APPROACH SLAB | 109.6 | SY |
$160.00 |
$170.00 |
$195.00 |
| 29 | 504(B) 1305 |
SAW-CUT GROOVING | 214.9 | SY |
$7.00 |
$9.10 |
$12.00 |
| 30 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 191 | LF |
$65.00 |
$68.50 |
$80.00 |
| 31 | 506(A) 1322 |
STRUCTURAL STEEL | 1,690 | LB |
$3.00 |
$2.90 |
$3.00 |
| 32 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$750.00 |
$1,000.00 |
$1,000.00 |
| 33 | 509(A) 1326 |
CLASS AA CONCRETE | 61.7 | CY |
$475.00 |
$450.00 |
$575.00 |
| 34 | 509(B) 1328 |
CLASS A CONCRETE | 70.5 | CY |
$450.00 |
$450.00 |
$610.00 |
| 35 | 511(A) 1332 |
REINFORCING STEEL | 23,188 | LB |
$1.00 |
$0.9000 |
$0.9000 |
| 36 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 100 | LF |
$35.00 |
$30.50 |
$38.50 |
| 37 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 205 | LF |
$40.00 |
$42.00 |
$52.50 |
| 38 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 100 | LF |
$12.00 |
$21.00 |
$16.50 |
| 39 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 205 | LF |
$15.00 |
$25.25 |
$22.50 |
| 40 | 514(K) 6260 |
(PL)PILOT HOLES | 185 | LF |
$150.00 |
$110.00 |
$150.00 |
| 41 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,156 | TON |
$30.00 |
$29.50 |
$34.04 |
| 42 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 251 | TON |
$25.00 |
$34.75 |
$28.78 |
| 43 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 996 | SY |
$2.00 |
$2.50 |
$4.00 |
| 44 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 70 | LF |
$25.00 |
$35.00 |
$45.00 |
| 45 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 20 | LF |
$25.00 |
$35.00 |
$72.00 |
| 46 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$7,200.00 |
$11,000.00 |
| 47 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 25.5 | SF |
$15.00 |
$18.00 |
$25.00 |
| 48 | 851(C) 8330 |
2 1/2" SQUARE TUBE POST | 50 | LF |
$10.00 |
$10.00 |
$15.00 |
| 49 | 853 9039 |
DELINEATORS(TYPE 2, CODE 3) | 10 | EA |
$10.00 |
$24.00 |
$25.00 |
| 50 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 11,248 | LF |
$1.00 |
$0.2900 |
$0.3700 |
| 51 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$1,890.00 |
$5,500.00 |
| 52 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$5,000.00 |
$10,600.00 |
$10,650.00 |
| 53 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$6,000.00 |
$3,500.00 |
$4,350.00 |
| 54 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$50,000.00 |
$77,500.00 |
$61,000.00 |