| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$6,096.83 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,844 | CY |
$8.00 |
$8.49 |
$6.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,355 | CY |
$12.00 |
$15.60 |
$12.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$8,000.00 |
$14,304.84 |
$12,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 2,485 | LF |
$3.00 |
$2.44 |
$3.00 |
| 6 | 221(D) 2803 |
TEMPORARY SEDIMENT FILTER | 1 | EA |
$300.00 |
$434.62 |
$500.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 168 | LF |
$10.50 |
$8.64 |
$8.50 |
| 8 | 221(G) 0152 |
TEMPORARY ROCK FILTER DAM TYPE 3 | 160 | CY |
$100.00 |
$91.81 |
$125.00 |
| 9 | 229 4318 |
DITCH LINER PROTECTION | 300 | LF |
$2.00 |
$2.17 |
$2.50 |
| 10 | 230(A) 2806 |
SOLID SLAB SODDING | 8,196 | SY |
$1.75 |
$2.12 |
$2.00 |
| 11 | 232(A) 2813 |
SEEDING METHOD A | 1 | AC |
$300.00 |
$869.22 |
$865.00 |
| 12 | 233(A) 2817 |
VEGETATIVE MULCHING | 1 | AC |
$300.00 |
$869.22 |
$865.00 |
| 13 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 329 | CY |
$50.00 |
$47.23 |
$50.00 |
| 14 | 307(D) 4230 |
LIME | 88 | TON |
$175.00 |
$181.52 |
$165.00 |
| 15 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 4,910 | SY |
$4.00 |
$3.39 |
$4.00 |
| 16 | 325 5271 |
SEPARATOR FABRIC | 2,108 | SY |
$2.00 |
$1.42 |
$3.50 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 150 | TON |
$40.00 |
$26.36 |
$30.00 |
| 18 | 407(B) 0250 |
TACK COAT | 310 | GAL |
$4.00 |
$2.53 |
$2.75 |
| 19 | 408 5774 |
PRIME COAT | 1,382 | GAL |
$7.00 |
$7.83 |
$8.50 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 693 | TON |
$80.00 |
$89.36 |
$99.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 462 | TON |
$95.00 |
$112.56 |
$125.00 |
| 22 | 509(D) 0325 |
CLASS C CONCRETE | 28 | CY |
$350.00 |
$543.26 |
$350.00 |
| 23 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,401.54 |
$17,000.00 |
| 24 | 619(B) 4725 |
REMOVAL OF FENCE | 3,045 | LF |
$1.50 |
$2.17 |
$2.50 |
| 25 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 3,462 | SY |
$3.25 |
$3.18 |
$7.50 |
| 26 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 162 | LF |
$5.00 |
$2.88 |
$4.00 |
| 27 | 619(C) 0924 |
SAWING PAVEMENT | 1,000 | LF |
$3.00 |
$2.34 |
$3.00 |
| 28 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,200 | LF |
$4.00 |
$6.46 |
$6.00 |
| 29 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,175 | CY |
$8.00 |
$7.94 |
$6.50 |
| 30 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 135 | CY |
$30.00 |
$32.60 |
$40.00 |
| 31 | 509(A) 1326 |
CLASS AA CONCRETE | 519.9 | CY |
$350.00 |
$455.94 |
$450.00 |
| 32 | 511(A) 1332 |
REINFORCING STEEL | 97,088 | LB |
$1.00 |
$0.7100 |
$0.9000 |
| 33 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$5,000.00 |
$10,596.91 |
$15,000.00 |
| 34 | 805(D) 8756 |
(PL)REMOVE & RESET EXISTING SIGNS | 2 | EA |
$100.00 |
$108.65 |
$110.00 |
| 35 | 853 9030 |
DELINEATORS(TYPE 1, CODE 3) | 4 | EA |
$15.00 |
$15.21 |
$21.00 |
| 36 | 854(A) 8800 |
TRAFFIC STRIPE(PAINT)(4" WIDE) | 2,715 | LF |
$0.3500 |
$0.2700 |
$0.3000 |
| 37 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 6,400 | LF |
$0.2500 |
$0.1600 |
$0.1800 |
| 38 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 4,000 | LF |
$0.3000 |
$0.2700 |
$0.3000 |
| 39 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 160 | SD |
$30.00 |
$10.87 |
$12.00 |
| 40 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 800 | LF |
$25.00 |
$23.36 |
$35.00 |
| 41 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 900 | SD |
$0.6000 |
$1.09 |
$1.10 |
| 42 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 540 | SD |
$0.8000 |
$4.35 |
$4.40 |
| 43 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,040 | SD |
$1.00 |
$3.26 |
$3.30 |
| 44 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 80 | SD |
$2.00 |
$4.35 |
$4.40 |
| 45 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 880 | SD |
$0.5000 |
$0.1100 |
$0.1100 |
| 46 | 880(F) 8878 |
DRUMS | 6,260 | SD |
$0.3000 |
$0.0500 |
$0.0600 |
| 47 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$6,500.00 |
$10,539.33 |
$9,500.00 |
| 48 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,125.00 |
$710.59 |
$2,900.00 |
| 49 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$6,000.00 |
$3,552.95 |
$6,430.00 |
| 50 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$70,000.00 |
$50,211.54 |
$70,000.00 |