| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$12,000.00 |
$25,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 103,228 | CY |
$5.00 |
$4.00 |
$6.25 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,000 | CY |
$7.00 |
$20.00 |
$10.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$30,000.00 |
$30,000.00 |
$32,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 456 | LF |
$2.00 |
$2.44 |
$2.60 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 2,576 | LF |
$6.00 |
$7.66 |
$7.80 |
| 7 | 229 4318 |
DITCH LINER PROTECTION | 100 | LF |
$2.00 |
$9.00 |
$9.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 181,332.3 | SY |
$1.00 |
$1.38 |
$1.40 |
| 9 | 232(B) 2814 |
SEEDING METHOD B | 21 | AC |
$330.00 |
$721.00 |
$730.00 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 21 | AC |
$330.00 |
$689.00 |
$700.00 |
| 11 | 233(E) 2822 |
EXCELSIOR MAT | 8,225 | SY |
$3.00 |
$2.44 |
$2.50 |
| 12 | 241 2832 |
MOWING | 74 | AC |
$74.00 |
$129.00 |
$130.00 |
| 13 | 303(B) 2110 |
AGGREGATE BASE TYPE B | 37,082 | CY |
$38.00 |
$39.15 |
$65.50 |
| 14 | 310(B) 0149 |
SUBGRADE, METHOD B | 120,221 | SY |
$1.00 |
$0.9500 |
$1.76 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 130,217 | SY |
$1.30 |
$1.00 |
$1.00 |
| 16 | 326(A) 0100 |
GEOTEXTILE REINFORCEMENT | 130,217 | SY |
$1.50 |
$1.70 |
$2.10 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 7,301 | TON |
$19.00 |
$21.85 |
$30.00 |
| 18 | 408 5774 |
PRIME COAT | 28,468 | GAL |
$3.70 |
$4.00 |
$5.00 |
| 19 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 19,329 | TON |
$70.00 |
$71.50 |
$79.00 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 18,884 | TON |
$67.00 |
$64.78 |
$72.50 |
| 21 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 11,900 | TON |
$73.00 |
$75.95 |
$93.00 |
| 22 | 412 5267 |
COLD MILLING PAVEMENT | 2,546 | SY |
$4.00 |
$3.50 |
$3.75 |
| 23 | 509(A) 1326 |
CLASS AA CONCRETE | 1,217 | CY |
$355.00 |
$275.00 |
$275.00 |
| 24 | 509(D) 0325 |
CLASS C CONCRETE | 72 | CY |
$275.00 |
$250.00 |
$250.00 |
| 25 | 511(A) 0332 |
REINFORCING STEEL | 175,073 | LB |
$0.8000 |
$0.9000 |
$0.9000 |
| 26 | 601(G) 1362 |
TYPE III LAID UP RIPRAP | 173.4 | SY |
$30.00 |
$40.00 |
$45.00 |
| 27 | 601(I) 6312 |
FILTER FABRIC (RIPRAP) | 173.4 | SY |
$3.50 |
$3.25 |
$5.00 |
| 28 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 746 | SY |
$50.00 |
$50.00 |
$90.00 |
| 29 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 829 | LF |
$25.00 |
$22.10 |
$30.00 |
| 30 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 75 | LF |
$32.00 |
$28.75 |
$34.00 |
| 31 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 94 | LF |
$42.00 |
$36.35 |
$57.00 |
| 32 | 613(B) 0692 |
36" CORR. GALV. STEEL PIPE | 402 | LF |
$56.00 |
$43.80 |
$62.00 |
| 33 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 200 | LF |
$18.00 |
$35.00 |
$16.50 |
| 34 | 613(I) 1096 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 100 | LF |
$14.00 |
$35.00 |
$16.50 |
| 35 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 24 | EA |
$830.00 |
$800.00 |
$800.00 |
| 36 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 2 | EA |
$1,050.00 |
$1,000.00 |
$1,000.00 |
| 37 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,200.00 |
$2,000.00 |
$2,000.00 |
| 38 | 613(M) 7189 |
TYPE D4 CULVERT END TREATMENT | 6 | EA |
$1,400.00 |
$2,500.00 |
$2,500.00 |
| 39 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$14,000.00 |
$10,000.00 |
$21,500.00 |
| 40 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 69,213 | SY |
$1.90 |
$1.00 |
$2.80 |
| 41 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 480 | LF |
$17.00 |
$15.45 |
$15.75 |
| 42 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 1 | EA |
$2,200.00 |
$2,025.00 |
$2,200.00 |
| 43 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 17,958 | LF |
$3.70 |
$4.51 |
$5.80 |
| 44 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 3 | EA |
$100.00 |
$100.00 |
$105.00 |
| 45 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 3 | EA |
$16.00 |
$10.00 |
$10.00 |
| 46 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 39 | EA |
$60.00 |
$50.00 |
$70.00 |
| 47 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 381.6 | SF |
$17.00 |
$14.00 |
$14.50 |
| 48 | 851(C) 8324 |
2" SQUARE TUBE POST | 500 | LF |
$9.00 |
$7.25 |
$7.50 |
| 49 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 10 | EA |
$12.50 |
$15.00 |
$15.50 |
| 50 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 65,521 | LF |
$0.5500 |
$0.5500 |
$0.5600 |
| 51 | 855(A) 8814 |
TRAFFIC STRIPE(PLASTIC)(8" WIDE) | 1,402 | LF |
$1.20 |
$1.00 |
$1.05 |
| 52 | 855(A) 8818 |
TRAFFIC STRIPE(PLASTIC)(12" WIDE) | 3,194 | LF |
$2.20 |
$1.50 |
$1.55 |
| 53 | 855(A) 8825 |
TRAFFIC STRIPE(PLASTIC)(24" WIDE) | 41 | LF |
$10.00 |
$10.00 |
$10.50 |
| 54 | 855(B) 8818 |
TRAFFIC STRIPE(PLASTIC)(ARROWS) | 24 | EA |
$100.00 |
$75.00 |
$78.00 |
| 55 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 5,094 | LF |
$0.4000 |
$0.2500 |
$0.2600 |
| 56 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 104,792 | LF |
$0.0800 |
$0.1200 |
$0.1200 |
| 57 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 10,188 | LF |
$0.7000 |
$0.6500 |
$0.6500 |
| 58 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 2,000 | SD |
$7.00 |
$8.00 |
$8.20 |
| 59 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 3,760 | LF |
$22.00 |
$26.30 |
$32.00 |
| 60 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 2,700 | LF |
$5.00 |
$4.50 |
$12.00 |
| 61 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,470 | SD |
$0.5500 |
$0.2000 |
$0.2000 |
| 62 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 220 | SD |
$0.8500 |
$4.00 |
$4.20 |
| 63 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,170 | SD |
$1.30 |
$1.50 |
$1.55 |
| 64 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 6,530 | SD |
$0.2500 |
$0.4000 |
$0.4200 |
| 65 | 880(C) 8848 |
WING BARRICADES | 520 | SD |
$0.9000 |
$1.00 |
$1.05 |
| 66 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 13,060 | SD |
$0.1200 |
$0.3500 |
$0.3600 |
| 67 | 880(F) 8878 |
DRUMS | 51,530 | SD |
$0.1000 |
$0.1200 |
$0.1200 |
| 68 | 880(K) 8908 |
SURVEILLANCE TRAFFIC CONTROL | 220 | SD |
$200.00 |
$300.00 |
$200.00 |
| 69 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 50 | HOUR |
$70.00 |
$75.00 |
$100.00 |
| 70 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 660 | SD |
$16.00 |
$15.00 |
$15.50 |
| 71 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$102,000.00 |
$50,000.00 |
| 72 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$4,000.00 |
$4,000.00 |
$4,000.00 |
| 73 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$8,000.00 |
$5,000.00 |
$9,000.00 |
| 74 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$325,000.00 |
$120,000.00 |
$409,850.00 |