Bid tab 120135

Let Mar 15, 2012 · Division 2 · Marshall Sign up free

‹ Mar 2012 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-353): OVER CANEY CREEK 1.7 MILES SOUTH AND 0.4 MILES WEST OF US -70/SH-32 JCT. PROJECT LENGTH = 0.275 MILES

Let date
Thursday, March 15, 2012
Contract
120135
J/P numbers
21097(04)
District
Division 2
County
Marshall
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-353): OVER CANEY CREEK 1.7 MILES SOUTH AND 0.4 MILES WEST OF US -70/SH-32 JCT. PROJECT LENGTH = 0.275 MILES
Project number
BRO-148D(041)CI

Bidders 6

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$886,674
1 L & N BRIDGE, LLC Low bidder $854,853 -3.6%
2 HUB Construction, Inc. $931,382 +5.0% +9.0%
3 K & R BUILDERS, INC. $959,607 +8.2% +12.3%
4 OVERLAND CORPORATION $969,259 +9.3% +13.4%
5 CP3 ENTERPRISES, INC. $988,442 +11.5% +15.6%
6 EARTH BUILDERS, L.P. $1,048,305 +18.2% +22.6%

Bid tab: unit prices 56 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 L & N BRIDGE, L…#2 HUB Constructio…#3 K & R BUILDERS,…#4 OVERLAND CORPOR…#5 CP3 ENTERPRISES…#6 EARTH BUILDERS,…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $6,000.00 $7,600.00 $15,000.00 $9,500.00 $12,000.00 $2,192.40 $35,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION21,160CY $7.00 $5.85 $7.00 $7.00 $5.75 $5.23 $9.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $10,000.00 $7,822.50 $7,500.00 $8,550.00 $8,000.00 $4,881.74 $7,500.00
4210 0121 OBLITERATING ABANDONED ROAD600LF $8.00 $5.25 $5.00 $6.50 $10.00 $6.49 $40.00
5221(C) 2801 TEMPORARY SILT FENCE100LF $2.00 $2.10 $3.00 $3.00 $2.10 $2.44 $2.20
6221(F) 0100 TEMPORARY SILT DIKE310LF $10.00 $8.00 $6.00 $10.00 $8.40 $9.26 $9.00
7230(A) 2806 SOLID SLAB SODDING21,450SY $2.00 $1.22 $2.00 $1.40 $1.20 $1.34 $1.35
8233(A) 2817 VEGETATIVE MULCHING4.5AC $450.00 $510.00 $350.00 $375.00 $520.00 $590.12 $600.00
9303(A) 2100 AGGREGATE BASE TYPE A1,180CY $35.00 $44.00 $45.00 $51.00 $50.00 $47.40 $44.00
10325 5271 SEPARATOR FABRIC5,416SY $2.00 $1.30 $2.00 $1.50 $1.45 $1.28 $1.50
11402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E522TON $22.00 $19.50 $20.00 $22.50 $24.00 $24.79 $22.00
12407(B) 0250 TACK COAT691GAL $4.00 $3.15 $4.00 $4.00 $3.00 $4.87 $3.80
13408 5774 PRIME COAT3,174GAL $5.00 $5.50 $6.00 $5.90 $5.00 $5.91 $6.00
14411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,032TON $70.00 $78.25 $90.00 $85.78 $90.40 $109.13 $80.00
15411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)535TON $75.00 $94.50 $100.00 $103.50 $99.00 $111.41 $95.00
16509(D) 0325 CLASS C CONCRETE20CY $350.00 $400.00 $250.00 $290.00 $300.00 $249.39 $330.00
17601(A) 0297 TYPE I PLAIN RIPRAP1,113TON $30.00 $30.00 $30.00 $36.00 $38.00 $44.47 $44.00
18613(A) 0493 30" R.C.PIPE CLASS III40LF $80.00 $85.00 $80.00 $81.00 $142.00 $106.60 $85.00
19613(A) 0496 48" R.C.PIPE CLASS III82LF $150.00 $175.00 $175.00 $150.00 $250.00 $163.10 $150.00
20613(B) 0689 18" CORR. GALV. STEEL PIPE60LF $35.00 $25.00 $25.00 $19.40 $44.00 $49.08 $40.00
21613(B) 0690 24" CORR. GALV. STEEL PIPE110LF $40.00 $32.00 $35.00 $26.21 $50.00 $57.89 $42.00
22613(L) 5730 24" PREFAB. CULVERT END SECTION, ROUND4EA $700.00 $570.00 $700.00 $326.70 $530.00 $785.94 $900.00
23613(L) 5732 30" PREFAB. CULVERT END SECTION, ROUND2EA $800.00 $770.00 $900.00 $860.00 $1,275.00 $1,805.99 $1,400.00
24613(L) 5738 48" PREFAB. CULVERT END SECTION, ROUND4EA $1,000.00 $1,550.00 $1,600.00 $1,575.00 $2,300.00 $2,492.15 $2,000.00
25619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $7,200.00 $3,500.00 $6,500.00 $7,500.00 $2,375.11 $6,000.00
26619(C) 0924 SAWING PAVEMENT40LF $10.00 $4.20 $6.00 $10.00 $4.50 $9.50 $5.00
27850(A) 8110 SHEET ALUMINUM SIGNS10SF $20.00 $33.60 $30.00 $40.00 $26.00 $38.97 $20.00
28855(A) 8812 TRAFFIC STRIPE(PLASTIC)(4" WIDE)5,500LF $0.6000 $0.6900 $0.9000 $0.8500 $0.7500 $0.7700 $1.10
29501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON220CY $17.00 $10.00 $15.00 $11.00 $15.50 $12.06 $10.00
30501(F) 6352 GRANULAR BACKFILL92CY $50.00 $75.00 $50.00 $75.00 $53.00 $100.85 $40.00
31503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)258.67LF $160.00 $175.00 $190.00 $208.00 $230.00 $228.01 $168.00
32504(A) 1304 APPROACH SLAB170SY $120.00 $150.00 $180.00 $193.00 $185.00 $186.35 $155.00
33504(B) 1305 SAW-CUT GROOVING245SY $4.00 $5.50 $8.00 $6.50 $4.15 $7.13 $6.00
34504(D) 6239 CONCRETE RAIL (TR3)198.1LF $65.00 $65.00 $75.00 $68.00 $80.00 $74.54 $75.00
35506(A) 1322 STRUCTURAL STEEL420LB $4.00 $2.00 $1.85 $3.50 $1.90 $3.84 $2.50
36507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY4EA $1,000.00 $1,400.00 $1,250.00 $1,250.00 $1,300.00 $1,370.25 $1,300.00
37507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY4EA $1,000.00 $1,400.00 $1,250.00 $1,250.00 $1,300.00 $1,370.35 $1,300.00
38509(A) 1326 CLASS AA CONCRETE67.1CY $500.00 $425.00 $550.00 $525.00 $560.00 $575.51 $590.00
39509(B) 1328 CLASS A CONCRETE80CY $450.00 $425.00 $500.00 $540.00 $525.00 $591.95 $500.00
40511(A) 1332 REINFORCING STEEL28,160LB $0.6000 $1.00 $1.00 $0.9400 $1.05 $1.03 $0.8500
41514(A) 6010 PILES, FURNISHED (HP 10X42)82LF $20.00 $45.00 $40.00 $37.80 $42.00 $41.44 $30.00
42514(A) 6011 PILES, FURNISHED (HP 12X53)176LF $35.00 $45.00 $50.00 $43.75 $53.00 $47.96 $38.00
43514(B) 6292 PILES, DRIVEN (HP 10X42)82LF $12.00 $30.00 $10.00 $16.20 $10.30 $17.76 $48.00
44514(B) 6294 PILES, DRIVEN (HP 12X53)176LF $20.00 $30.00 $10.00 $18.75 $10.30 $20.55 $48.00
45514(K) 6260 (PL)PILOT HOLES258LF $150.00 $35.00 $90.00 $120.00 $93.00 $131.54 $75.00
46601(B) 1353 TYPE I-A PLAIN RIPRAP1,510TON $30.00 $36.50 $35.00 $36.00 $36.00 $39.46 $44.00
47601(C) 1355 TYPE I-A FILTER BLANKET485TON $28.00 $29.00 $30.00 $27.00 $32.00 $29.60 $38.00
48613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND74LF $20.00 $10.50 $25.00 $31.53 $26.00 $34.56 $18.00
49613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.50LF $15.00 $6.50 $15.00 $28.23 $16.00 $32.69 $18.00
50619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $8,000.00 $5,000.00 $15,000.00 $8,000.00 $15,500.00 $17,508.75 $12,000.00
51623(A) 1418 BEAM GUARDRAIL W-BEAM SINGLE200LF $25.00 $15.54 $22.00 $17.30 $22.50 $16.22 $20.00
52623(F) 6033 GUARDRAIL ANCHOR UNIT (TYPE II)4EA $2,000.00 $2,205.00 $2,300.00 $2,453.25 $2,400.00 $2,451.23 $2,500.00
53880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $5,000.00 $2,677.50 $3,500.00 $3,500.00 $5,000.00 $2,976.49 $6,000.00
54642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $5,000.00 $3,000.00 $5,000.00 $10,000.00 $10,000.00 $12,180.00 $25,000.00
55220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $2,500.00 $2,000.00 $4,500.00 $3,500.00 $1,461.60 $3,000.00
56641 1399 MOBILIZATION1LSUM $67,000.00 $55,000.00 $20,000.00 $38,000.00 $42,000.00 $33,787.32 $30,000.00