| 1 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 43,245 | CY |
$4.30 |
$8.00 |
$5.50 |
$4.26 |
$4.16 |
$9.75 |
$4.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 19,838 | CY |
$5.00 |
$8.00 |
$10.50 |
$7.46 |
$5.40 |
$8.23 |
$5.15 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$96,600.00 |
$100,000.00 |
$32,000.00 |
$42,605.85 |
$70,189.31 |
$120,000.00 |
$67,000.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 18,500 | LF |
$1.90 |
$2.00 |
$1.98 |
$1.97 |
$1.02 |
$3.01 |
$1.95 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 1,218 | LF |
$5.50 |
$10.00 |
$10.45 |
$16.70 |
$7.52 |
$6.70 |
$10.25 |
| 6 | 229 4318 |
DITCH LINER PROTECTION | 12,300 | LF |
$0.9500 |
$1.25 |
$1.18 |
$1.17 |
$1.07 |
$2.00 |
$1.15 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 115,898 | SY |
$1.50 |
$1.50 |
$1.35 |
$1.35 |
$1.18 |
$1.45 |
$1.34 |
| 8 | 232(A) 2813 |
SEEDING METHOD A | 24 | AC |
$300.00 |
$200.00 |
$204.75 |
$203.63 |
$311.55 |
$250.00 |
$201.00 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 24 | AC |
$300.00 |
$200.00 |
$204.75 |
$203.63 |
$515.68 |
$219.47 |
$201.00 |
| 10 | 241 2832 |
MOWING | 48 | AC |
$60.00 |
$50.00 |
$46.20 |
$45.95 |
$53.72 |
$61.90 |
$45.35 |
| 11 | 307(A) 4200 |
FLY ASH | 4,567 | TON |
$65.00 |
$55.00 |
$56.18 |
$59.48 |
$65.31 |
$66.11 |
$55.00 |
| 12 | 307(D) 4230 |
LIME | 488 | TON |
$160.00 |
$90.00 |
$185.75 |
$175.54 |
$145.00 |
$186.14 |
$163.00 |
| 13 | 307(E) 4240 |
CEMENTITIOUS STABILIZED SUBGRADE | 84,553 | SY |
$2.30 |
$2.00 |
$2.06 |
$1.83 |
$1.77 |
$1.41 |
$1.95 |
| 14 | 307(G) 4260 |
LIME PRETREATMENT | 34,826 | SY |
$3.00 |
$0.5000 |
$2.25 |
$1.83 |
$0.4500 |
$3.94 |
$1.30 |
| 15 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,362 | TON |
$25.00 |
$18.00 |
$20.50 |
$34.77 |
$20.56 |
$28.04 |
$21.00 |
| 16 | 407(B) 0250 |
TACK COAT | 31,104 | GAL |
$2.50 |
$2.00 |
$3.00 |
$2.22 |
$3.50 |
$3.21 |
$3.05 |
| 17 | 408 5774 |
PRIME COAT | 20,651 | GAL |
$3.25 |
$2.00 |
$5.44 |
$3.60 |
$5.25 |
$2.83 |
$6.25 |
| 18 | 409(A) 4242 |
FABRIC REINFORCEMENT | 93,495 | SY |
$3.00 |
$1.00 |
$1.06 |
$1.01 |
$1.00 |
$0.9100 |
$1.45 |
| 19 | 409(B) 4268 |
BITUMINOUS BINDER | 18,700 | GAL |
$2.70 |
$3.50 |
$4.42 |
$4.49 |
$4.50 |
$3.36 |
$4.35 |
| 20 | 411(B) 5940 |
SUPERPAVE, TYPE S3(PG 70-28 OK) | 15,915 | TON |
$67.00 |
$61.00 |
$68.00 |
$71.13 |
$74.00 |
$74.75 |
$78.35 |
| 21 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 32,463 | TON |
$61.00 |
$54.00 |
$59.50 |
$67.73 |
$71.00 |
$66.95 |
$68.20 |
| 22 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 9,861 | TON |
$75.00 |
$82.00 |
$78.00 |
$83.99 |
$81.00 |
$77.27 |
$79.20 |
| 23 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,934 | TON |
$70.00 |
$73.00 |
$67.00 |
$69.63 |
$70.50 |
$71.39 |
$71.65 |
| 24 | 412 5267 |
COLD MILLING PAVEMENT | 79,426 | SY |
$3.00 |
$1.50 |
$0.8400 |
$1.10 |
$2.50 |
$1.54 |
$1.65 |
| 25 | 414(A) 0210 |
P.C.CONCRETE PAVEMENT(PLACEMENT) | 1,362 | SY |
$15.00 |
$35.00 |
$13.41 |
$33.38 |
$12.50 |
$8.44 |
$25.75 |
| 26 | 414(G) 5275 |
P.C. CONCRETE FOR PAVEMENT | 227 | CY |
$120.00 |
$110.00 |
$92.71 |
$98.48 |
$110.00 |
$112.55 |
$108.15 |
| 27 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 160 | CY |
$20.00 |
$15.00 |
$31.50 |
$20.89 |
$30.00 |
$52.12 |
$15.45 |
| 28 | 509(A) 0319 |
CLASS AA CONCRETE | 262 | CY |
$450.00 |
$550.00 |
$743.40 |
$621.34 |
$745.00 |
$315.14 |
$391.40 |
| 29 | 509(D) 0325 |
CLASS C CONCRETE | 960 | CY |
$250.00 |
$360.00 |
$210.00 |
$313.28 |
$210.00 |
$253.23 |
$216.30 |
| 30 | 511(A) 0332 |
REINFORCING STEEL | 32,166 | LB |
$0.8000 |
$1.30 |
$0.8900 |
$0.6800 |
$0.8900 |
$1.13 |
$1.05 |
| 31 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 348 | TON |
$37.00 |
$40.00 |
$49.78 |
$33.27 |
$32.50 |
$30.21 |
$26.80 |
| 32 | 609(A) 0288 |
CONCRETE CURB (6" MNTBLE-INTEGRAL) | 3,501 | LF |
$4.00 |
$6.00 |
$18.86 |
$14.83 |
$15.00 |
$15.53 |
$18.35 |
| 33 | 610(B) 0604 |
6" CONCRETE DRIVEWAY | 144 | SY |
$50.00 |
$75.00 |
$90.00 |
$56.82 |
$45.00 |
$47.27 |
$43.25 |
| 34 | 611(G) 5100 |
INLET CI DES. 1 (STD) | 2 | EA |
$2,000.00 |
$3,500.00 |
$2,692.03 |
$1,780.50 |
$3,500.00 |
$2,250.97 |
$2,060.00 |
| 35 | 611(G) 5111 |
INLET CI DES. 1 (2C) | 1 | EA |
$2,500.00 |
$8,500.00 |
$4,809.56 |
$3,976.87 |
$3,500.00 |
$2,250.97 |
$2,935.50 |
| 36 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 58 | LF |
$70.00 |
$60.00 |
$80.35 |
$39.48 |
$64.80 |
$39.31 |
$64.00 |
| 37 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 60 | LF |
$95.00 |
$100.00 |
$110.21 |
$63.14 |
$81.00 |
$57.32 |
$76.25 |
| 38 | 613(A) 4410 |
28 1/2" X 18" R.C.PIPE ARCH CLASS A-III | 868 | LF |
$70.00 |
$70.00 |
$48.79 |
$41.10 |
$86.40 |
$57.94 |
$75.20 |
| 39 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 136 | LF |
$22.00 |
$38.00 |
$27.80 |
$46.97 |
$22.00 |
$49.57 |
$25.75 |
| 40 | 613(L) 4584 |
28 1/2" X 18" PREFAB. CULVERT END SECTION, ARCH | 50 | EA |
$1,000.00 |
$1,000.00 |
$709.67 |
$925.54 |
$595.00 |
$54.81 |
$618.00 |
| 41 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,000.00 |
$700.00 |
$741.97 |
$1,149.22 |
$545.00 |
$1,340.57 |
$618.00 |
| 42 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$1,300.00 |
$1,239.30 |
$925.55 |
$700.00 |
$1,840.68 |
$721.00 |
| 43 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 98 | CY |
$15.00 |
$50.00 |
$30.57 |
$27.50 |
$20.00 |
$60.79 |
$25.75 |
| 44 | 613(V) 1180 |
TRENCH EXCAVATION | 138 | CY |
$20.00 |
$25.00 |
$34.83 |
$36.70 |
$20.00 |
$35.54 |
$22.70 |
| 45 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$30,000.00 |
$20,000.00 |
$13,672.45 |
$18,270.98 |
$45,000.00 |
$19,553.03 |
$41,500.00 |
| 46 | 619(B) 0291 |
REMOVAL OF HEADWALL | 32 | EA |
$1,000.00 |
$1,500.00 |
$283.50 |
$1,044.26 |
$750.00 |
$722.05 |
$2,100.00 |
| 47 | 619(C) 0924 |
SAWING PAVEMENT | 68,877 | LF |
$2.00 |
$1.00 |
$1.13 |
$2.15 |
$4.00 |
$1.14 |
$3.00 |
| 48 | 624(A) 4281 |
FENCE-STYLE WWF | 405 | LF |
$10.00 |
$4.00 |
$4.46 |
$4.44 |
$4.57 |
$4.78 |
$3.75 |
| 49 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 16,880 | LF |
$6.00 |
$4.00 |
$3.68 |
$3.76 |
$3.76 |
$3.94 |
$3.55 |
| 50 | 629(A) 4958 |
MAILBOX INSTALLATION-SINGLE | 9 | EA |
$50.00 |
$100.00 |
$313.69 |
$88.76 |
$106.35 |
$112.55 |
$103.00 |
| 51 | 629(B) 4959 |
MAILBOX INSTALLATION-MULTIPLE | 3 | EA |
$70.00 |
$250.00 |
$210.00 |
$193.19 |
$212.69 |
$3.38 |
$206.00 |
| 52 | 629(C) 4960 |
MAILBOX | 15 | EA |
$28.00 |
$30.00 |
$26.25 |
$36.55 |
$26.59 |
$16.88 |
$25.75 |
| 53 | 629(D) 4961 |
REMOVAL OF MAILBOX INSTALLATION | 15 | EA |
$10.00 |
$5.00 |
$5.25 |
$80.91 |
$5.32 |
$5.63 |
$5.15 |
| 54 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 20,000 | LF |
$0.2500 |
$0.1100 |
$0.1100 |
$0.1600 |
$0.1100 |
$0.1100 |
$0.1000 |
| 55 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 5,000 | EA |
$0.3500 |
$0.5400 |
$0.5300 |
$0.4700 |
$0.5300 |
$0.5600 |
$0.5500 |
| 56 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 20,000 | LF |
$0.2500 |
$0.1600 |
$0.1600 |
$0.4700 |
$0.1600 |
$0.1700 |
$0.1500 |
| 57 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 540 | SD |
$12.67 |
$5.40 |
$5.25 |
$5.22 |
$5.32 |
$7.41 |
$5.15 |
| 58 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 3,240 | SD |
$0.4500 |
$0.8500 |
$0.7900 |
$0.5700 |
$0.8000 |
$0.8400 |
$0.8000 |
| 59 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,620 | SD |
$0.5600 |
$1.08 |
$1.05 |
$2.09 |
$1.06 |
$1.13 |
$1.05 |
| 60 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 5,400 | SD |
$1.25 |
$2.16 |
$2.10 |
$2.09 |
$2.13 |
$2.25 |
$2.10 |
| 61 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,620 | SD |
$0.7500 |
$0.2700 |
$0.2600 |
$0.5700 |
$0.2700 |
$0.2800 |
$0.3000 |
| 62 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 6,750 | SD |
$0.1500 |
$0.1100 |
$0.1100 |
$0.2600 |
$0.1100 |
$0.1100 |
$0.1000 |
| 63 | 880(F) 8878 |
DRUMS | 13,770 | SD |
$0.2500 |
$0.1100 |
$0.1100 |
$0.3700 |
$0.1100 |
$0.1100 |
$0.1000 |
| 64 | 880(G) 8890 |
CHANNELIZER CONES | 36,990 | SD |
$0.1300 |
$0.0500 |
$0.0500 |
$0.3700 |
$0.0500 |
$0.0600 |
$0.0500 |
| 65 | 880(I) 8902 |
FLAGGER | 540 | SD |
$150.00 |
$100.00 |
$200.00 |
$14.29 |
$225.00 |
$270.12 |
$115.00 |
| 66 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 540 | SD |
$7.50 |
$8.00 |
$7.88 |
$26.11 |
$7.98 |
$8.44 |
$7.75 |
| 67 | 805(D) 8760 |
(PL)REMOVE & RESET GROUND MOUNTED SIGN | 6 | EA |
$240.00 |
$216.00 |
$210.00 |
$104.43 |
$212.70 |
$225.10 |
$206.00 |
| 68 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 205.3 | SF |
$14.60 |
$12.00 |
$11.55 |
$15.66 |
$11.70 |
$12.94 |
$11.35 |
| 69 | 851(C) 8324 |
2" SQUARE TUBE POST | 442.5 | LF |
$8.00 |
$8.00 |
$7.35 |
$10.44 |
$7.44 |
$7.88 |
$7.25 |
| 70 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 89,805 | LF |
$0.6500 |
$0.3500 |
$0.3300 |
$0.5200 |
$0.3300 |
$0.3500 |
$0.3300 |
| 71 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$60,000.00 |
$50,000.00 |
$62,500.00 |
$64,953.03 |
$73,698.77 |
$51,772.32 |
$93,000.00 |
| 72 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,500.00 |
$4,000.00 |
$5,775.00 |
$569.12 |
$10,000.00 |
$3,000.00 |
$16,000.00 |
| 73 | 640(A) 1426 |
FIELD OFFICE | 1 | EA |
$7,500.00 |
$10,000.00 |
$9,866.67 |
$3,187.09 |
$10,500.00 |
$5,627.43 |
$10,000.00 |
| 74 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$315,000.00 |
$365,000.00 |
$312,000.00 |
$80,552.50 |
$100,000.00 |
$300,000.00 |
$375,000.00 |