IDOT Jobs

All dates · 617 jobs · $829,644,000 Sign up free
★ My Jobs

Filtered by: District: District 5 Clear all

617 jobs · $829,644,000 estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Nov 8, 2019 70545 DouglasDistrict 5 Bridge replacement, bridge removal/demolition on IL 130 over the Embarras River. — Executed Nov 26 New Sangamo Construction Company $5,765,527 ·
Nov 8, 2019 70E06 VermilionDistrict 5 Six spot locations of bridge painting on I-74. — Executed Nov 26 New Venus Painting Co. $1,456,964 ·
Nov 8, 2019 70E09 VermilionDistrict 5 Weigh in Motion Data Collection System on FAI-74 approximately 1.0 mile west of Oakwood. — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $405,354 ·
Nov 8, 2019 70E34 VermilionDistrict 5 One mile of patching on I-74 (EB and WB) from G-Street to E of US 150/IL 1 in Danville. — Executed Nov 26 New G. M. Sipes Construction, Inc. $207,280 ·
Nov 8, 2019 70E35 ChampaignDeWittDistrict 5 Tree removal and seeding on I-74 Westbound at Farmer City exit and on US 45 at NCL of Thomasboro. — Executed Nov 26 New J.H. Moore, Inc. d/b/a Castle Electric, Inc. $46,668 ·
Jan 17, 2020 46534 VariousDistrict 5 Pavement marking repair at various locations in DeWitt, McLean, and Piatt Counties. — Executed Nov 26 New A. C. Pavement Striping Co. $949,959 ·
Jan 17, 2020 70912 McLeanDistrict 5 Interstate resurfacing and ramp repair S of Lexington to Livingston Co Line 9.67 miles. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $14,966,522 ·
Jan 17, 2020 70B92 ChampaignDistrict 5 Bridge deck repairs to SN(s) 010-0031,010-0032,010-0089, and 010-0175. — Executed Nov 26 New Stark Excavating, Inc. $2,399,490 ·
Jan 17, 2020 70E37 ChampaignVermilionDistrict 5 Standard overlay and cold milling at I-57 at I-74 ramps; I-74 at Oakwood ramps; Oakwood Rd S of I-74 interchange; I-74 W of I-57/I-74 interchange. — Executed Nov 26 New Open Road Paving Company LLC $559,464 ·
Jan 17, 2020 70E44 VariousDistrict 5 506.1 miles of spraying, approximately 1405 acres of state right of way along all interstate routes including interchanges in Champaign, Dewitt, Douglas, McLean, Piatt and Vermilion Counties. — Executed Nov 26 New The Daltons Inc. $105,848 ·
Jan 17, 2020 91571 VermilionDistrict 5 Replace the Bridge carrying TR 42A over an unnamed stream 0.50 miles south of Armstrong. — Executed Nov 26 New Stark Excavating, Inc. $399,725 ·
Jan 17, 2020 91583 McLeanDistrict 5 Replace the bridg ecarrying TR94 over Kings Mill Creek located 4.5 miles Northwest of Shirley. — Executed Nov 26 New Stark Excavating, Inc. $798,771 ·
Mar 6, 2020 70C64 ChampaignDistrict 5 Bridge superstrucure replacements over ICRR/TR 158 (Oak St) and over FAU 7169 Market St in Champaign. — Rejected Nov 26 New Sangamo Construction Company $32,652,848 ·
Mar 6, 2020 70D77 DouglasDistrict 5 Bridge repairs at SN 021-0030 over Embarras River 1.5 miles S of Camargo. Bridge repairs at SN 021-0031 over Scattering Fork 3.0 miles S of Camargo. — Executed Nov 26 New Sangamo Construction Company $620,114 ·
Mar 6, 2020 70D86 McLeanDistrict 5 6.287 miles oc Ultra-Thin Bonded Wearing Course on I-55/I-74 from Fox Creek Rd to Sugar Creek in Bloomington/Normal. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $6,485,906 ·
Mar 6, 2020 70E07 VermilionDistrict 5 2020 National Preservation Project to modernize traffic signals at two intersections on IL Rt 1/US Rt 150 at Hegeler Ave S of Tilton and Lyons Rd N of Belgium. — Executed Nov 26 New Capitol Construction Group, LLC d/b/a Egizii Electric $555,695 ·
Mar 6, 2020 70E27 ChampaignDistrict 5 BRIDGE DECK SEALING ALONG VARIOUS ROUTES. — Executed Nov 26 New All States Painting, Inc. $154,900 ·
Mar 6, 2020 70E32 McLeanDistrict 5 8.390 miles of patching from W of I-55 to the Livingston County Line. — Executed Nov 26 New Lion Construction 1, LLC $321,387 ·
Mar 6, 2020 70E33 ChampaignDistrict 5 1.18 miles of class B patching on FAS 533 (Market St) from Harris Rd to Hensley Rd N of Champaign. — Executed Nov 26 New G. M. Sipes Construction, Inc. $224,855 ·
Mar 6, 2020 70E46 McLeanDistrict 5 2020 National Highway Preservation Project to replace five of the light towers and add an additional light tower at the interchanges of I-39 and US Bus 51 along I-55. — Executed Nov 26 New Capitol Construction Group, LLC d/b/a Egizii Electric $355,451 ·
Mar 6, 2020 91579 DeWittDistrict 5 Resurfacing Center Street from Adams Street to VanBuren Street, and from Woodlawn Street to Washington in the City of Clinton. — Rejected Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $1,252,583 ·
Mar 6, 2020 91584 DouglasDistrict 5 Replace the bridge carrying TR136A over Scattering Fork, located 4 miles southwest of Camargo. — Executed Nov 26 New Depew and Owen Builders, Inc. $649,048 ·
Mar 6, 2020 91591 EdgarDistrict 5 Guardrail and terminal removal and the installation of new guardrail and terminals on various routes. — Executed Nov 26 New Lovewell Fencing, Inc. $920,467 ·
Apr 24, 2020 70B38 ChampaignDistrict 5 Bridge replacements under mattis ave. NW of Champaign. — Executed Nov 26 New Stark Excavating, Inc. $20,849,840 ·
Apr 24, 2020 70B98 ChampaignDistrict 5 Bridge replacement under US 150 NW of Champaign. — Executed Nov 26 New Stark Excavating, Inc. $7,645,546 ·
Apr 24, 2020 70D63 ChampaignDistrict 5 321.6 ft of bridge deck repairs on SN 010-0056 carrying IL 47 over I-72. — Executed Nov 26 New Stark Excavating, Inc. $714,776 ·
Apr 24, 2020 70D65 McLeanDistrict 5 Bridge deck overlay of FAI 39 from 2100 N to 2200 N at Hudson. — Executed Nov 26 New Stark Excavating, Inc. $3,960,429 ·
Apr 24, 2020 70D73 McLeanDistrict 5 Rest area improvement at Funks Grove Rest Area. — Executed Nov 26 New Otto Baum Company, Inc. $1,123,868 ·
Apr 24, 2020 70D80 ChampaignPiattDistrict 5 Driving lane inlay on FAI 74 approximately 1.3 miles W of Champaign County Line to 0.2 mile W of IL Rte 47 in Mahomet. — Executed Nov 26 New Open Road Paving Company LLC $4,265,475 ·
Apr 24, 2020 70E11 PiattDistrict 5 7.288 miles of Bituminous Surface Treatment A-1 on IL 105 from SCL of Bement. — Executed Nov 26 New Earl Walker Company, Inc. $308,809 ·
Apr 24, 2020 70E15 McLeanDistrict 5 Bridge joint replace/repair, bridge deck repairs to SN 057-0022 and 057-0023. — Executed Nov 26 New Stark Excavating, Inc. $773,590 ·
Apr 24, 2020 70E28 EdgarDistrict 5 0.041 Mile of pavement removal, earth excavation, and jointed PCC pavement at the sign shop parking lot in Paris. — Executed Nov 26 New Feutz Contractors, Inc. $383,735 ·
Apr 24, 2020 70E40 DeWittMcLeanDistrict 5 25.55 miles of patching Macon/DeWitt to 2.9 miles S of I-74/US 51 interchange. — Executed Nov 26 New Beniach Construction Co., Inc. $446,314 ·
Apr 24, 2020 70E60 VariousDistrict 5 Districtwide smart work zone technology. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $555,000 ·
Apr 24, 2020 91590 DeWittDistrict 5 Sidewalk construction on John Street from Allen Steet to Water Street in Farmer City. — Executed Nov 26 New Stark Excavating, Inc. $131,255 ·
Jun 12, 2020 46543 McLeanPiattDistrict 5 Grooving and pavement striping in Piatt and McLean counties. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,763,650 ·
Jun 12, 2020 70710 DouglasDistrict 5 2.011 miles of standard resurfacing/ADA improvements on ILL 133 from US 45 in Arcola to 0.5 miles E of I-57 and US 45 from ILL 133 to Madison St. — Executed Nov 26 New Ne-Co Asphalt Co., Inc. $1,915,428 ·
Jun 12, 2020 70C25 ChampaignPiattDistrict 5 11.033 miles of resurfacing of I-72 from White Heath Rd NE of White Heath to I-57 W of Champaign. Work includes Fiber-Mod Asphalt Crack Sealing and Micro-Surfacing 2 Pass in Piatt County and IL 10 ramps, HMA surface removal 2" and 2" Polymer HMA resurfacing in Champaign County and IL 47 ramps. — Executed Nov 26 New Open Road Paving Company LLC $8,357,789 ·
Jun 12, 2020 70D74 DouglasEdgarDistrict 5 10.387 miles of resurfacing (3P policy standard overlay), new shoulders, milled rumble overlay, and culvert replacement from Vermilion/Edgar Co. line to 1800th Rd N of Brocton. — Executed Nov 26 New Open Road Paving Company LLC $7,391,354 ·
Jun 12, 2020 70D82 VermilionDistrict 5 2.887 miles 3P Designed Overlay: 3- Cold Central Plant Recycle (CCPR) mixture, 1.5- HMA surface course, and Aggregate Type B from ECL of Indianola to Georgetown/Indianola Rd. — Executed Nov 26 New Cross Construction, Inc. $1,694,875 ·
Jun 12, 2020 70E16 McLeanDistrict 5 2.989 miles of Standard overlay on Old Rte 66 from Shirley to I-74. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $1,476,692 ·
Jun 12, 2020 70E31 McLeanDistrict 5 Resurfacing (SMART) 0.3 mile W of I-55 to Old Route 66 W of Chenoa. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $96,406 ·
Jun 12, 2020 70E39 ChampaignVermilionDistrict 5 0.226 mile of patching on I-74 at US 150, and 9.015 miles of patching on I-57 from MM 244 to Ford County line. — Executed Nov 26 New Beniach Construction Co., Inc. $244,755 ·
Jun 12, 2020 70E45 McLeanDistrict 5 0.833 mile of patching at Carlock Weigh Station. — Executed Nov 26 New Beniach Construction Co., Inc. $135,953 ·
Jun 12, 2020 70E69 ChampaignDistrict 5 2020 National Highway Preservation Project to install new traffic signals at the I-57 NB and SB ramps with FAP 807 (Curtis Rd). — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $448,301 ·
Jun 12, 2020 70E71 ChampaignDeWittDouglasDistrict 5 13.8 miles of Pollinator Habitat signs along US 45 from Douglas/Coles County line to Windsor Rd in Champaign. Tree removal, weed control, and seeding are included. — Executed Nov 26 New CSD Environmental Services, Inc. $405,276 ·
Jun 12, 2020 91585 McLeanDistrict 5 Resurfacing CH 14 from IL 165 to CH 29 in Towanda — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $1,992,414 ·
Jun 12, 2020 91589 McLeanDistrict 5 Sidewalk construction at various locations within 2 miles of the Sheridan Elementary Shcool in Bloomington. — Executed Nov 26 New Stark Excavating, Inc. $207,192 ·
Jul 31, 2020 70A92 VermilionDistrict 5 Bridge superstructure replacements over Salt Fork Vermilion River. — Executed Nov 26 New ICC Group Inc. $17,683,000 ·
Jul 31, 2020 91593 VermilionDistrict 5 Replace the bridge carrying TR 186 over Windfall Creek, 3 miles southeast of Jamesburg. — Executed Nov 26 New Big O Services, LLC $333,547 ·
Jul 31, 2020 91595 VermilionDistrict 5 Replace the bridge carrying TR 15 over Whiskey Creek, 2.5 miles southeast of Rankin. — Executed Nov 26 New Big O Services, LLC $269,637 ·
Sep 18, 2020 70602 ChampaignDistrict 5 0.1 miles, bridge superstructure, Copper Slough W of Duncan Rd. — Executed Nov 26 New Stark Excavating, Inc. $667,652 ·
Sep 18, 2020 70E94 McLeanDistrict 5 Bridge Joint Repair of S.N. 057-0223 carrying Raab Rd. over 1-55. — Executed Nov 26 New Stark Excavating, Inc. $231,290 ·
Nov 6, 2020 70616 ChampaignDistrict 5 Bridge replacement, 0.16 miles road reconstruction and widening over the Salt Fork Vermilion River 0.50 miles NE of Sidney. — Executed Nov 26 New Stark Excavating, Inc. $2,539,782 ·
Nov 6, 2020 70D87 McLeanDistrict 5 Bridge Painting at 5 Structure Locations on 1-39 and 1-55 in Mclean County. — Executed Nov 26 New Venus Painting Co. $1,738,976 ·
Nov 6, 2020 70F16 VariousDistrict 5 Maintenance and Lighting Repair at District 5 Facilities. — Executed Nov 26 New Capitol Construction Group, LLC d/b/a Egizii Electric $352,058 ·
Nov 6, 2020 90922 VermilionDistrict 5 Bridge Replacement under Tilton Rd. in Tilton. — Executed Nov 26 New ICC Group Inc. $5,270,000 ·
Nov 6, 2020 91588 ChampaignDistrict 5 Sidewalk removal and construction of new sidewalks and a multi-use path at the intersection of Sheldon Street and Campbell Avenue east of Northview Elementary in Rantoul. — Executed Nov 26 New Feutz Contractors, Inc. $241,586 ·
Jan 15, 2021 70A65 McLeanDistrict 5 3P Policy Standard Overlay ADA Improvements from W of Commerce Pkwy to 0.1 Mi N of E Washington St Gross Length = Net Length = 13,054.36 FT= 2.472 Mile. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $6,473,808 ·
Jan 15, 2021 70D16 McLeanDistrict 5 Bridge Deck Overlay at Funk's Grove Rest Area. — Executed Nov 26 New Stark Excavating, Inc. $3,668,318 ·
Jan 15, 2021 70D96 DouglasDistrict 5 Six bridge deck overlays at various locations between Arcola and Hindsboro. — Executed Nov 26 New Sangamo Construction Company $1,348,258 ·
Jan 15, 2021 70E36 ChampaignDouglasVermilionDistrict 5 Salt Containment Structures at Fithian, Leverett, and Tuscola facilities. — Executed Nov 26 New Stark Excavating, Inc. $347,926 ·
Jan 15, 2021 70F23 VariousDistrict 5 567.5 miles of spraying, approximately 2004 acres on state right of way along US 51 on interstate routes including interchanges in Champaign, Dewitt, McLean, Piatt, and Vermilion Counties. — Executed Nov 26 New The Daltons Inc. $116,455 ·
Jan 15, 2021 91586 VermilionDistrict 5 Pavement removal, construction of PCC pavement, sidewalks, curb and gutter, on CH 36 from South Forest Avenue to US 150. — Executed Nov 26 New Feutz Contractors, Inc. $467,341 ·
Jan 15, 2021 91596 ChampaignDistrict 5 Resurfcing Maplewood Drive from the north city limits of Rantoul to Veteran's Parkway in Rantoul. — Executed Nov 26 New Cross Construction, Inc. $1,151,287 ·
Mar 5, 2021 46927 McLeanDistrict 5 The work includes HMA resurfacing of roadway and parking areas, striping of of parking areas, sign replacements, aggregate resurfacing of camp sites and hunting lots, guardrail replacement, concrete barrier wall construction, and other misc. improvement items at Moraine View State Recreation Area (IDNR) in LeRoy, McLean County. — Executed Nov 26 New H. J. Eppel & Co. $2,654,792 ·
Mar 5, 2021 70C93 DeWittDistrict 5 Bridge Deck Overlay S.N. 020-0043 over N Fork Salt Creek 3 Mi W of Dewitt. — Executed Nov 26 New White Construction LLC $794,393 ·
Mar 5, 2021 70E78 VariousDistrict 5 BRIDGE DECK SEALING ALONG VARIOUS ROUTES THROUGHOUT REGION 3 / DISTRICT 5. — Executed Nov 26 New All States Painting, Inc. $169,900 ·
Mar 5, 2021 70E99 DeWittMcLeanDistrict 5 BRIDGE JOINT REPAIR/REPLACE AT VARIOUS LOCATIONS IN DEWITT AND MCLEAN COUNTIES. — Executed Nov 26 New Path Construction Company, Inc. $448,820 ·
Mar 5, 2021 70F24 VariousDistrict 5 Tree Removal and seeding at various routes in various counties throughout the District. — Executed Nov 26 New Endrizzi Contracting, Inc $324,180 ·
Mar 5, 2021 70F25 ChampaignDistrict 5 Bridge Painting, 1.0 and 2.0 Mi S of Ludlow. — Executed Nov 26 New Civil Coatings and Construction Inc. $338,940 ·
Apr 23, 2021 70947 VermilionDistrict 5 3P Policy (Standard Overlay) Resurfacing from S OF TILTON TO S OF CATLIN. — Executed Nov 26 New Open Road Paving Company LLC $1,396,862 ·
Apr 23, 2021 70990 DeWittDistrict 5 3P Resurfacing Standard overlay, ADA improvements from Logan Co. line to Van Buren St. in Clinton. Project length 9.48 miles. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $4,310,314 ·
Apr 23, 2021 70C16 DeWittDistrict 5 3P Resurfacing Standard overlay from Logan Co. line to 0.3 miles W. of US 51 at Clinton. Project length 9.91 miles. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $4,197,068 ·
Apr 23, 2021 70D99 ChampaignDistrict 5 5.3 miles of micro-surfacing joint repair of center line on us 45, from Curtis Rd in savoy to N of Tolono. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $279,272 ·
Apr 23, 2021 70E18 McLeanDistrict 5 Designed Overlay on Old Rte. 66 from Logan Co. line to Shirley for a net length of 9.57 miles. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $5,233,531 ·
Apr 23, 2021 70E49 McLeanDistrict 5 Interstate Bridge Preservation/ Bridge Deck Overlay at I-39/US 51 Over Mackinaw River North of Hudson. — Executed Nov 26 New Stark Excavating, Inc. $3,710,497 ·
Apr 23, 2021 70E81 VermilionDistrict 5 12.963 Miles of Smart Resurfacing from Ford County Line to IL Rte. 1 at Hoopeston. — Executed Nov 26 New Cross Construction, Inc. $3,925,502 ·
Apr 23, 2021 70E83 DeWittDistrict 5 5.601 Miles. SMART Resurfacing, ILL 54 to ILL 10 N of Weldon. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $1,982,180 ·
Apr 23, 2021 70E92 DouglasEdgarDistrict 5 12.579 Miles of Cape Seal Operations from ILL 130 South to ILL 49. — Executed Nov 26 New Beniach Construction Co., Inc. $933,139 ·
Apr 23, 2021 70F02 DeWittPiattDistrict 5 Bridge beam replacement and bridge repair at SN 074-0076 and 020-0045. — Executed Nov 26 New White Construction LLC $880,524 ·
Apr 23, 2021 70F04 DeWittDistrict 5 5.179 miles of micro surfacing joint repair from Mclean/Dewitt co line to the Dewitt/Piatt Co. line. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $353,199 ·
Apr 23, 2021 70F05 McLeanDistrict 5 Class a special patching on nearly 2 miles of Eb/Wb 1-74 near Carlock. — Executed Nov 26 New Kinney Contractors, Inc. $121,468 ·
Apr 23, 2021 70F06 McLeanDistrict 5 .245 Miles of Partial Width Resurfacing Under Veterans Parkway and Under I-55B in Bloomington. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $143,207 ·
Apr 23, 2021 70F08 DouglasDistrict 5 11.36 MI of patching along FAI 57 from S of Arcola to N of Tuscola. — Executed Nov 26 New Beniach Construction Co., Inc. $136,258 ·
Apr 23, 2021 70F09 ChampaignDistrict 5 0.253 miles, patching, at 1-74 North of Mahomet on ILL 47. — Executed Nov 26 New G. M. Sipes Construction, Inc. $145,616 ·
Apr 23, 2021 70F10 VermilionDistrict 5 3.072 Ml of patching on FAS 331 from US 150 to Homer/Catlin Rd. — Executed Nov 26 New G. M. Sipes Construction, Inc. $138,517 ·
Apr 23, 2021 70F11 VermilionDistrict 5 1.36 Mi of patching on FAI 74 from L Street in Tilton to E of IL 1 in Danville. — Executed Nov 26 New G. M. Sipes Construction, Inc. $358,400 ·
Apr 23, 2021 70F12 ChampaignDistrict 5 0.425 Miles, Longitudinal joint repair, Guardian Dr. to 1-74 Ramps in Urbana. — Executed Nov 26 New Cross Construction, Inc. $79,277 ·
Apr 23, 2021 70F13 ChampaignDistrict 5 Partial width resurfacing 0.216 Mi on US 150, between Elm St to Main St; 0.089 Mi on IL US 150; 0.033 Mi on ILL 49, just N of US 150. — Executed Nov 26 New Scanlon Excavating & Concrete, Inc. $245,749 ·
Apr 23, 2021 91592 ChampaignDistrict 5 Pavement reconstruction including widening, Cold-in-Place recycling, HMA pavement and shoulder, box and pipe culverts, and ditch widening. Project is on CH 15 from IL 130 to Sidney. — Executed Nov 26 New Open Road Paving Company LLC $5,394,552 ·
Apr 23, 2021 91600 PiattDistrict 5 Replace the bridge carrying TR 51 over a tributary to the Sangamon River, 2 miles north of White Heath. — Executed Nov 26 New Stark Excavating, Inc. $408,815 ·
Apr 23, 2021 91601 ChampaignDistrict 5 Replace the bridge carrying CH 17 over Kaskaskia Ditch, 1.1 miles west of Sadorus. — Executed Nov 26 New White Construction LLC $1,256,245 ·
Apr 23, 2021 91603 McLeanDistrict 5 Cold-in-Place recycling with HMA binder and surface course on CH 39 from White Oak Road to Ziebarth Road. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $1,305,243 ·
Jun 11, 2021 46579 VariousDistrict 5 Pavement marking repair at various locations in Dewitt, Champaign, Vermilion, and District wide. — Executed Nov 26 New Varsity Striping & Construction Co. $923,675 ·
Jun 11, 2021 70B02 EdgarDistrict 5 1.702 Miles Total/11.113 Miles Net of 3P Policy Standard Overlay, Misc. Roadway Work, New Shoulders, Milled Rumble Strip from 1800th RD N of Brocton to Kansas NCL. — Executed Nov 26 New Howell Paving, Inc. $6,206,182 ·
Jun 11, 2021 70B99 ChampaignDistrict 5 Interchange Reconstruction: 1-57 improvements from South of Norfolk Southern RR to Olympian Dr. (+/-1.95 mi.); 1-74 improvements from Duncan Rd. to Prospect Ave. (+/-2.66 mi.) — Executed Nov 26 New William Charles Construction Company, LLC and White Construction, LLC JV $125,800,347 ·
Jun 11, 2021 70F03 McLeanDistrict 5 The project is to replace four light towers with twelve new LED highway light poles at the interchange of I-74 and FAS 1478 (Chestnut St) in LeRoy, IL in McLean County. — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $128,858 ·
Jun 11, 2021 70F17 VariousDistrict 5 District-Wide On-Call Tree Removal. — Rejected Nov 26 New Endrizzi Contracting, Inc $308,730 ·
Jun 11, 2021 70F22 VariousDistrict 5 Installation of new Advances Traffic Management System (ATMS) on various routes throughout District 3. — Executed Nov 26 New Bodine Electric of Decatur $935,642 ·
101–200 of 617‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.