D5 CM PATCH 2020-2
Bidders 3
| # | Contractor | Total bid | vs estimate | vs low |
|---|---|---|---|---|
| EE | Engineer's estimate | — | ||
| 1 | G. M. Sipes Construction, Inc. Low bidder | $224,855 | ||
| 2 | Veya, Inc. | $254,880 | +13.4% | |
| 3 | Scanlon Excavating & Concrete, Inc. | $322,238 | +43.3% |
| Seq | Bid code | Description | Qty | Unit | Estimate | #1 G. M. Sipes Con… | #2 Veya, Inc. | #3 Scanlon Excavat… |
|---|---|---|---|---|---|---|---|---|
| 1 | 44200050 | WELDED WIRE REINF | 698 | SQ YD | $10.00 | $10.50 | $15.00 | |
| 2 | 44200994 | CL B PATCH T2 12 | 99 | SQ YD | $225.00 | $300.00 | $250.00 | |
| 3 | 44200998 | CL B PATCH T3 12 | 78 | SQ YD | $225.00 | $316.00 | $250.00 | |
| 4 | 44201000 | CL B PATCH T4 12 | 383 | SQ YD | $200.00 | $222.00 | $250.00 | |
| 5 | 44201063 | CL B PATCH T2 18 | 9 | SQ YD | $250.00 | $337.00 | $300.00 | |
| 6 | 44201067 | CL B PATCH T3 18 | 35 | SQ YD | $250.00 | $325.00 | $300.00 | |
| 7 | 44201069 | CL B PATCH T4 18 | 203 | SQ YD | $225.00 | $225.00 | $300.00 | |
| 8 | 44201299 | DOWEL BARS 1 1/2 | 825 | EACH | $7.50 | $17.50 | $16.00 | |
| 9 | 44213200 | SAW CUTS | 1,649 | FOOT | $4.95 | $3.50 | $7.00 | |
| 10 | 44213204 | TIE BARS 3/4 | 135 | EACH | $5.00 | $18.41 | $15.00 | |
| 11 | 67100100 | MOBILIZATION | 1 | L SUM | $9,000.00 | $15,000.00 | $20,000.00 | |
| 12 | 70100450 | TRAF CONT-PROT 701201 | 1 | L SUM | $20,000.00 | $8,000.00 | $50,000.00 | |
| 13 | 70107025 | CHANGEABLE MESSAGE SN | 6 | CAL DA | $125.00 | $400.00 | $150.00 |