Filtered by: District: District 1 Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Sep 21, 2018 | 61C21 | DuPageDistrict 1 | Construction of a multi-use path from Butterfield Road to South of Butterfield Road in the City of Elmhurst. | — | Executed | Lorig Construction Company $650,954 · | ||
| Sep 21, 2018 | 61E00 | WillDistrict 1 | Reconstruction of Moen Avenue from Mound Road to Larkin Avenue in the Village of Rockdale. | — | Executed | P. T. Ferro Construction Co. $4,999,401 · | ||
| Sep 21, 2018 | 61E88 | DuPageDistrict 1 | Construction of a shared use path adjacent to Montgomery Road from Waubonsie Creek Trail to Middlebury Drive in the City of Aurora. | — | Executed | D. Construction, Inc. $588,452 · | ||
| Sep 21, 2018 | 61E98 | DuPageDistrict 1 | Roadway resurfacing and sidewalk installation on Greenbrook Boulevard from County Farm Road to Lake Street. | — | Executed | J. A. Johnson Paving Company $885,885 · | ||
| Sep 21, 2018 | 61F02 | CookDistrict 1 | Traffic signal installation at 99th Street and Ridgeland Avenue in the Village of Chicago Ridge. | — | Executed | City Lights, LTD. $578,285 · | ||
| Sep 21, 2018 | 62A28 | CookDistrict 1 | Culvert replacement in the village of Calument. | — | Executed | D. Construction, Inc. $396,566 · | ||
| Sep 21, 2018 | 62B63 | CookDistrict 1 | Pavement widening, resurfacing, traffic signal modernization, and pedestrian ramp improvement for Plainfield Road at Willow Springs Road in Countryside. | — | Executed | Alliance Contractors, Inc. $947,875 · | ||
| Sep 21, 2018 | 62F52 | VariousDistrict 1 | Annual maintenance and operation of traffic signals, highway lighting, pump stations, surveillance, and other electrical systems in District 1. | — | Executed | Meade Inc. $26,979,205 · | ||
| Sep 21, 2018 | 62G45 | CookDistrict 1 | Building demolition located at 1680 Sauk Trail Road in Sauk Village. | — | Executed | Scanlon Excavating & Concrete, Inc. $85,529 · | ||
| Sep 21, 2018 | 62G81 | VariousDistrict 1 | Repair and installation of guardrail along various expressways and arterial highways throughout District One. | — | Executed | Kujo, Inc. $1,878,925 · | ||
| Sep 21, 2018 | 62G82 | VariousDistrict 1 | High tensin cable barrier repairs on various expressway medians district wide. | — | Executed | Fence Masters, Inc. $344,475 · | ||
| Nov 9, 2018 | 46472 | DuPageWillDistrict 1 | Replacing damaged and deteriorated overhead sign structures, componenets, and supports, described in the schedule of locations. | — | Executed | Aldridge Electric, Inc. $3,199,710 · | ||
| Nov 9, 2018 | 46473 | CookDistrict 1 | Repairing and replacing damaged or deteriorated overhead sign structures, components, and supports at locations described in the Schedule of Locations. | — | Executed | Kujo, Inc. $2,862,608 · | ||
| Nov 9, 2018 | 60R79 | LakeDistrict 1 | Bridge deck overlay and bridge joint repairs at two structures carrying US 12 over Nippersink Lake Channel and over Pistkee Lake Channel. | — | Executed | Lorig Construction Company $2,241,247 · | ||
| Nov 9, 2018 | 60T13 | McHenryDistrict 1 | Channelization and traffic signal installation at the intersection of IL Route 173 and Wilmot Road. | — | Executed | Campanella and Sons, Inc. $1,983,425 · | ||
| Nov 9, 2018 | 60X79 | CookDistrict 1 | Widening, realignment, and reconstruction of eastbound I-290 ramp to I-90/94 northbound of the Jane Byrne Interchange, includes construction of five concrete retaining walls, drainage work and ITS in the City of Chicago. | — | Executed | James McHugh Construction Co. $33,852,455 · | ||
| Nov 9, 2018 | 60X93 | CookDistrict 1 | Reconstruction of five major system center ramps of Jane Byrne Interchange, some are on structures with retaining walls, ITS and signing, in the City of Chicago. | — | Executed | James McHugh Construction Co. $63,047,568 · | ||
| Nov 9, 2018 | 61E06 | DuPageDistrict 1 | Intersection improvement with signal timing progression and resurfacing on FAU Route 1504 (55th Street) from Dunham Road to Clerendon Hills Road. | — | Executed | R. W. Dunteman Company $8,525,282 · | ||
| Nov 9, 2018 | 61E67 | KaneDistrict 1 | Reconstruct the intersection of Main Street and Deerpath Road in the City of Batavia. | — | Executed | R. W. Dunteman Company $1,716,769 · | ||
| Nov 9, 2018 | 61E99 | KaneDistrict 1 | Traffic signal improvement on Randall Road from Silver Glen Road to County Line Road. | — | Executed | Thorne Electric, Inc. $4,681,132 · | ||
| Nov 9, 2018 | 61F03 | CookDistrict 1 | Sidewalk construction on 26th Street from Harlem Avenue to Riverside Drive; Riverside Drive from Maple Avenue to 27th Street; and Riverside Drive from 26th Street to Home Avenue in the City of Berwyn. | — | Rejected | Davis Concrete Construction Co. $181,996 · | ||
| Nov 9, 2018 | 61F04 | KaneDistrict 1 | construct a portion of Long Meadow Parkway on a new alignment, widen and reconstruct IL 25, including the intersection with Bolz Road. Located near the intersection of IL 25 and Bolz Road in the Village of Carpentersville. | — | Executed | Plote Construction, Inc. $5,591,043 · | ||
| Nov 9, 2018 | 61F05 | DuPageDistrict 1 | Install conduit, handholes and fiber optic interconnect cable to connect existing traffic signal controllers to the existing DuPage County Central System Network, located at various locations in DuPage County. | — | Executed | Thorne Electric, Inc. $3,355,558 · | ||
| Nov 9, 2018 | 61F07 | CookDistrict 1 | Resurfacing Kirchoff Road from Hicks Road to New Wilke Road in the City of Rolling Meadows. | — | Executed | Arrow Road Construction Co. $2,073,879 · | ||
| Nov 9, 2018 | 61F11 | KaneDistrict 1 | Resurfcing Aucutt Road from Orchard Road to IL Route 31 in the Village of Montgomery. | — | Executed | D. Construction, Inc. $522,896 · | ||
| Nov 9, 2018 | 61F14 | CookDistrict 1 | Resurfacing and ADA sidewalk improvements on Smith Street from Palatine Road to Dundee Road in the Village of Palatine. | — | Executed | Arrow Road Construction Co. $1,357,145 · | ||
| Nov 9, 2018 | 61F16 | CookDistrict 1 | Roadway reconstruction on FAU Route 1076 (Locust Road) from Lake Avenue to Wilmette Avenue in the Village of Wilmette. | — | Executed | A Lamp Concrete Contractors, Inc. $4,089,411 · | ||
| Nov 9, 2018 | 61F19 | WillDistrict 1 | Reconstruction and resurfacing on Sioux Drive and Dove Drive from Sunset Drive to West Eames Street and from Navajo Drive to Sunsewt Drive in the Village of Channahon. | — | Executed | P. T. Ferro Construction Co. $1,607,993 · | ||
| Nov 9, 2018 | 62A36 | CookDistrict 1 | Intersection improvement, drainage, traffic modernization, shared-use path and watermain relocation on IL 68 in the Villages of Barrington and Inverness. | — | Executed | Martam Construction Incorporated $2,526,633 · | ||
| Nov 9, 2018 | 62B31 | KaneDistrict 1 | Removal and replacement of existing box culverts over Harmony Creek and over Eakin Creek West. This project includes new culverts, pavement markings, signage, and new guardrail. | — | Executed | Rausch Infrastructure LLC_DO NOT USE $2,373,225 · | ||
| Nov 9, 2018 | 62C71 | CookDistrict 1 | Resurfacing on IL 7/US 6 (Wolf Road from just north of Southwest Highway to approximately 75 ft north of 151 Street in the Village of Orland Park. | — | Executed | D. Construction, Inc. $1,200,451 · | ||
| Nov 9, 2018 | 62D35 | LakeDistrict 1 | Drainage improvements along IL 59 and IL 22 in the village of North Barrington. Includes storm sewer, culvert lining and partial culvert barrel replacement. | — | Executed | Martam Construction Incorporated $889,433 · | ||
| Nov 9, 2018 | 62D43 | KaneKendallDistrict 1 | Bridge repair and overlay at IL 31 over BNSF railroad structure. Work includes deck scarification, concrete joint repair and construction, structural repair of concrete and approach slab replacement. | — | Executed | D. Construction, Inc. $2,429,071 · | ||
| Nov 9, 2018 | 62F16 | KaneDistrict 1 | Intersection reconstruction with installation of a roundabout at IL 47 and Plato Road. | — | Executed | Curran Contracting Company $3,377,730 · | ||
| Nov 9, 2018 | 62F57 | DuPageDistrict 1 | 4.5 miles of resurfacing (3P) and pedestrian ramps on IL 64 from Gary Avenue to IL 53. | — | Executed | R. W. Dunteman Company $6,955,644 · | ||
| Nov 9, 2018 | 62G32 | CookDistrict 1 | Bridge repair that includes structural steel repair to the structure carrying 79th Street over the CSX Railroad in the Village of Bridgeview. | — | Executed | Sumit Construction Co., Inc. $103,465 · | ||
| Nov 9, 2018 | 62G84 | CookDistrict 1 | Cleaning and painting designated steel surfaces of SN 016-0669 carrying Addison Street over I-90/94 in the City of Chicago. | — | Executed | Capital Industrial Services $899,933 · | ||
| Nov 9, 2018 | 62G89 | CookDistrict 1 | Cleaning and painting 2 structures on I-90/94 in Chicago: 1) SN 016-0204 - eastbound ramp to Ohio; 2) SN 016-2551 - reversible to Ohio. | — | Executed | Capital Industrial Services $733,300 · | ||
| Nov 9, 2018 | 62G91 | WillDistrict 1 | Resurfacing on Blodgett Road from Kelly Road to 1.8 miles east of Kelly Road in Wilmington Township. | — | Executed | Iroquois Paving Corporation $389,562 · | ||
| Jan 18, 2019 | 46476 | VariousDistrict 1 | Removal of existing pavement marking and placing various widths of thermoplastic pavement marking lines, letters, and symbols within the limits specified on each individual work order. | — | Executed | Superior Road Striping, Inc. $762,500 · | ||
| Jan 18, 2019 | 46481 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. | — | Executed | Superior Road Striping, Inc. $278,325 · | ||
| Jan 18, 2019 | 46482 | DuPageDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement markeer castings. | — | Executed | Superior Road Striping, Inc. $1,114,319 · | ||
| Jan 18, 2019 | 46483 | CookDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $579,619 · | ||
| Jan 18, 2019 | 46484 | KaneDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $357,144 · | ||
| Jan 18, 2019 | 46485 | WillDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings, and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $371,419 · | ||
| Jan 18, 2019 | 46486 | VariousDistrict 1 | Removal of existing pavement marking and placing hot spray thrermoplastic pavement and modified urethane marking lines, letters, and sysmbols within the limits specified on individual work orders. | — | Executed | Superior Road Striping, Inc. $649,500 · | ||
| Jan 18, 2019 | 60484 | CookDistrict 1 | Removal of existing bridge structure carrying 135th Street over Ashland Avenue, also, storm sewer installation, integral retaining wall, sidewalk and concrete barrier wall construction. | — | Executed | D. Construction, Inc. $1,519,602 · | ||
| Jan 18, 2019 | 60M99 | WillDistrict 1 | Bridge deck repairs and thin polymer overlay of the existing bridge deck of SN 099-0263 carrying US 30 (Cass Street) over Spring Creek in the City of Joliet. | — | Executed | MYS, Incorporated $88,200 · | ||
| Jan 18, 2019 | 60Y68 | CookDistrict 1 | Landscaping within the following boundaries of I-90/94: Roosevelt Road to Washington Blvd. and Peoria St. to Clinton St., and I-290: Roosevelt Rd. to Van Buren St. and Ashland Ave. to Clinton St. | — | Executed | Copenhaver Construction, Inc. $131,623 · | ||
| Jan 18, 2019 | 61E15 | KaneDistrict 1 | Reconstructin of Chicago Street from Center Street to Liberty Street, in the City of Elgin. | — | Executed | Martam Construction Incorporated $7,616,826 · | ||
| Jan 18, 2019 | 61E44 | CookDistrict 1 | Replace the superstructure and repair the abutments on the structure carrying Barker Avenue over Salt Creek in the City of Rolling Meadows. | — | Executed | Martam Construction Incorporated $613,257 · | ||
| Jan 18, 2019 | 61E74 | KaneDistrict 1 | Modifications at 27 intersections in Aurora, Batavia, Geneva, North Aurora and unincorporated Kane County. | — | Rejected | H & H Electric Co. $6,338,791 · | ||
| Jan 18, 2019 | 61E97 | KaneDistrict 1 | Intersection improvement and the construction of a shared-use path at Kirk Rd. | — | Executed | D. Construction, Inc. $9,936,023 · | ||
| Jan 18, 2019 | 61F00 | CookDistrict 1 | Roadway reconstruction with drainage and lighting work on State and National Parkway from PLum Grove Road to IL Route 58 in Schaumburg. | — | Executed | Plote Construction, Inc. $5,761,331 · | ||
| Jan 18, 2019 | 61F08 | McHenryDistrict 1 | Replace the bridge carrying Union Road over the Kishwaukee River, located 0.80 mile north of IL 176. | — | Executed | Civil Constructors, Inc. $1,671,611 · | ||
| Jan 18, 2019 | 61F12 | WillDistrict 1 | Rehabilitate the bridge carrying IL 7 Frontage Road over the Des Plaines River in the City of Lockport. | — | Rejected | ICC Group Inc. $2,191,000 · | ||
| Jan 18, 2019 | 61F13 | KaneDistrict 1 | High friction surface treatment, signing, pavement markings, rumble strips and traffic signal upgrades on Kisk Road from IL 56 to Cherry Lane. | — | Executed | H & H Electric Co. $1,295,729 · | ||
| Jan 18, 2019 | 61F20 | DuPageDistrict 1 | Resurfacing west Avenue from First Street to St. Charles Road in Elmhurst. | — | Executed | K-Five Construction Corporation $310,996 · | ||
| Jan 18, 2019 | 61F21 | CookDistrict 1 | Pavement reconstruction, widening and resurfacing, traffic signal replacement at the intersection of US 6 and Van Dam Road in the Village of South Holland. | — | Executed | Gallagher Asphalt Corporation $1,793,572 · | ||
| Jan 18, 2019 | 61F22 | CookDistrict 1 | Roadway reconstructioon with sidewalk, curb and gutter, and drainage work on Walnut Lane from Schaumburg Lane to Weathersfield Way in Schaumburg. | — | Executed | Alliance Contractors, Inc. $2,692,563 · | ||
| Jan 18, 2019 | 61F23 | McHenryDistrict 1 | Pavement widening, resurfacing, traffic signal installation, street lighting, and construction of a bike/pedestrian path at the intersection of US 14 and Virginia Road in the City of Crystal Lake. | — | Executed | Curran Contracting Company $1,193,351 · | ||
| Jan 18, 2019 | 61F24 | CookDistrict 1 | Resurfacing on Lively Boulevard from Devon Avenue to Landmeier Road in the Village of Elk Grove Village. | — | Executed | K-Five Construction Corporation $1,295,822 · | ||
| Jan 18, 2019 | 61F27 | McHenryDistrict 1 | Replace the superstructure, repair abutments, reconstruct approaches to the structure carrying O'Brien Road over Nippecsink Creek, 1.5 miles west of IL 47. | — | Executed | Dunnet Bay Construction Company $717,499 · | ||
| Jan 18, 2019 | 61F28 | KaneDistrict 1 | Intersection improvement on Randall Road at Stearns Road; includes pavement widening, resurfacing, curb and gutter, street lighting and traffic signal improvements. | — | Executed | Curran Contracting Company $4,183,052 · | ||
| Jan 18, 2019 | 61F30 | DuPageDistrict 1 | Resurfacing on Lies Road from Gary Avenue to Schmale Road in Carol Stream. | — | Executed | Plote Construction, Inc. $1,031,758 · | ||
| Jan 18, 2019 | 61F31 | KaneDistrict 1 | Replace the bridge carrying TR 189A over Indian Creek, 0.10 mile west of Farnsworth. | — | Executed | D. Construction, Inc. $896,612 · | ||
| Jan 18, 2019 | 61F33 | LakeDistrict 1 | Pavement reconstruction, construction of a shared use path, and lighting improvements on 14th Street from Green Bay Road to Sheridan Road in North Chicago. | — | Executed | Berger Excavating Contractors, Inc. $16,525,114 · | ||
| Jan 18, 2019 | 61F35 | CookDistrict 1 | Sidewalk Construction and traffic signal improvement on Archer Road from 68th Street to 66th Place, and on State Road from Lavergne Avenue to Cicero Avenue in Bedford Park. | — | Executed | Triggi Construction, Inc. $191,631 · | ||
| Jan 18, 2019 | 61F38 | DuPageDistrict 1 | Resufacing on York Road from Grand Avenue to Green Street in Bensenville. | — | Executed | K-Five Construction Corporation $1,878,875 · | ||
| Jan 18, 2019 | 61F42 | McHenryDistrict 1 | Resurfacing from Silver Lake Road to South Rawson Bridge Road in Cary. | — | Executed | Curran Contracting Company $1,758,945 · | ||
| Jan 18, 2019 | 61F43 | CookDistrict 1 | Rehabilitate the bridges carrying Oak Street and Cherry Street over the UP Railroad in the Village of Winnetka. | — | Executed | Dunnet Bay Construction Company $3,345,570 · | ||
| Jan 18, 2019 | 62B68 | KendallDistrict 1 | Realignment and widening project on US 30 at the intersections with Harvey Rd. and Treasure Drive, includes intersection improvement and traffic signals. | — | Executed | D. Construction, Inc. $786,115 · | ||
| Jan 18, 2019 | 62C07 | CookDistrict 1 | Traffic signal modernization at Central Park Avenue. Channelization and traffic signal modernization at Crawford/Pulaski Road, and Kedzie Avenue. | — | Executed | Iroquois Paving Corporation $8,882,487 · | ||
| Jan 18, 2019 | 62C51 | CookDistrict 1 | Resurfacing and pedestrian ramp improvement project on IL 83 (Torrence Ave.) from Glenwood Dyer Rd. to south of I-80. | — | Executed | D. Construction, Inc. $1,892,784 · | ||
| Jan 18, 2019 | 62C77 | LakeDistrict 1 | Resurfacing on US 41 (Skokie Hwy) from 1000 feet north of IL 176 (Rockland Rd) to 100 feet north of IL 120 (Belvidere Rd.). | — | Executed | Peter Baker & Son Co. $6,097,098 · | ||
| Jan 18, 2019 | 62F03 | CookDistrict 1 | Bridge rehabilitation in Northfield. | — | Executed | Dunnet Bay Construction Company $1,994,113 · | ||
| Jan 18, 2019 | 62F23 | CookDistrict 1 | Resurfacing Palatine Road from US 12 to IL 21, and patching on Dundee Road from east of Kennicott Ave to First Street. | — | Executed | J. A. Johnson Paving Company $5,278,586 · | ||
| Jan 18, 2019 | 62F30 | CookDistrict 1 | Superstructure replacement, retaining wall modifications, approach slab replacement, HMA resurfcing and ADA ramp installation on IL 171 over CSX RR/Ingredion RR spur. | — | Executed | D. Construction, Inc. $1,337,721 · | ||
| Jan 18, 2019 | 62F48 | LakeDistrict 1 | Resurfacing, pedestrian ramp improvement, and culvert repair on US 41 from Park Ave. West to Il 176 (Rockland Rd.); and on IL 22 from Tennyson Lane to US 41. 8.29 miles. | — | Executed | Peter Baker & Son Co. and Plote Construction, Inc JV $13,226,577 · | ||
| Jan 18, 2019 | 62G07 | CookDistrict 1 | Removal and replacement of headwalls and wingwalls on either side of the existing double cell box culvert crossing Burnham Ave., 40 ft north of 202nd St. in Lynwood. | — | Executed | MYS, Incorporated $188,874 · | ||
| Jan 18, 2019 | 62G14 | WillDistrict 1 | Insatallation of a fiber optic line to provide local centralized control and operation of 6 moveable bridges over the Des Plaines River in Joliet. | — | Executed | John Burns Construction Company $1,900,000 · | ||
| Jan 18, 2019 | 62G66 | DuPageWillDistrict 1 | Installation of seven truss mounted LED dynamic message signs, CCTBV, fiber optic networks and roadside bluetooth detectors at various locations. | — | Executed | John Burns Construction Company $5,592,292 · | ||
| Jan 18, 2019 | 62G87 | CookLakeMcHenryDistrict 1 | Cleaning and painting existing steel on structures. IL 137 over US 45, IL 31 over UPRR, and Green Bay Road over North Shore Channel. | — | Executed | Eagle Painting & Maintenance Company, Inc. $302,850 · | ||
| Jan 18, 2019 | 62G88 | DuPageDistrict 1 | Cleaning and painting designated steel surfaces of I-290 bridge (SN 022-0107) at Metra (north of IL 19 - Irving Park Road) in the Village of Itasca. | — | Executed | Eagle Painting & Maintenance Company, Inc. $805,200 · | ||
| Jan 18, 2019 | 62G93 | DuPageDistrict 1 | Bridge deck overlay and approach pavement with latex concrete. Adjacent HMA pavement will be resurfaced to provide a smooth transition. | — | Executed | Martam Construction Incorporated $164,813 · | ||
| Jan 18, 2019 | 62G95 | DuPageDistrict 1 | Drainage improvement project in the median of IL 83 from 67th Street to Plainfield Road. | — | Executed | Scanlon Excavating & Concrete, Inc. $88,287 · | ||
| Jan 18, 2019 | 62G99 | WillDistrict 1 | Bridge deck overlay, joint repairs, structural repair of concrete, and drainage repairs on 099-0264 carrying US 30 over WCL RR in Joliet. | — | Executed | D. Construction, Inc. $1,673,197 · | ||
| Jan 18, 2019 | 62H31 | CookLakeDistrict 1 | Crack and joint sealing on US 12 (Rand Rd.) from Ela Road to IL 58 (Golf Rd.) | — | Executed | Freehill Asphalt, Inc. $451,265 · | ||
| Jan 18, 2019 | 62H47 | CookDistrict 1 | Resurfacing on Palatine Rd. approximately 100 feet west of the centerline of US 14 (Northwest Hwy.) to 70 feet east of centerline of US 12 (Rand Rd.). 2.93 miles. | — | Executed | Builders Paving, LLC $3,557,204 · | ||
| Jan 18, 2019 | 62H65 | VariousDistrict 1 | Expressway mowing south. | — | Executed | Lion Construction 1, LLC $224,380 · | ||
| Jan 18, 2019 | 62H66 | VariousDistrict 1 | Expressway mowing north. | — | Executed | McGinty Bros., Inc. $211,296 · | ||
| Jan 18, 2019 | 62H67 | VariousDistrict 1 | Cleaning (sweeping) various expressway and arterial highways throughout District 1. | — | Executed | Elgin Sweeping Services, Inc. $12,612,286 · | ||
| Mar 8, 2019 | 60M72 | CookDistrict 1 | Bridge deck overlay, joint repairs, structural repair of concrete and steel to I-94 at IL 68 (Dundee Road). | — | Executed | Rausch Infrastructure, LLC $1,199,708 · | ||
| Mar 8, 2019 | 60M75 | DuPageDistrict 1 | Bridge deck overlay and bridge joint repair improvement of Emroy Ave over I-290. | — | Executed | Martam Construction Incorporated $396,588 · | ||
| Mar 8, 2019 | 60N00 | WillDistrict 1 | Bridge deck overlay and joint repairs on the bridge carrying US 52 over Forked Creek. | — | Executed | MYS, Incorporated $301,046 · | ||
| Mar 8, 2019 | 60N83 | CookDistrict 1 | Rehabilitation and widening on SN 016-0533 carrying Willow Road over Lehigh and SOO line in Glenview. | — | Executed | Lorig Construction Company $8,661,763 · | ||
| Mar 8, 2019 | 60P68 | DuPageDistrict 1 | Resurfacing on IL-56 from Naperville Rd. to IL 53; includes retrofitting sidewalks to comply with ADA and Signal modernaization at the intersection with Park Ave. | — | Executed | K-Five Construction Corporation $3,038,712 · | ||
| Mar 8, 2019 | 60R65 | CookDistrict 1 | Overlay 016-2525 bridge deck with thin polymer in the City of Harvey. | — | Executed | MYS, Incorporated $116,107 · | ||
| Mar 8, 2019 | 60R68 | LakeDistrict 1 | Bridge deck scarification and latex concrete overlay, retrofitting bridge parapets, and reconstruction of transverse bridge joints to IL 43 over IL 120. | — | Executed | Areatha Construction Co., Inc. $1,777,994 · | ||
| Mar 8, 2019 | 60R69 | CookDistrict 1 | Deck patching, deck scarification, latex concrete overlay abutment repairs, joint repairs, slab repairs and debris removal on Golf Road over the East and West Fork N. Branch Chicago River (SN 016-0355, 016-0356, 016-1256 and 016-1257) | — | Executed | Martam Construction Incorporated $973,368 · |
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.