IDOT Jobs

All dates · 127 jobs · — Sign up free
★ My Jobs

Filtered by: County: Mclean Clear all

127 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 70C54 ChampaignDouglasMcLeanDistrict 5 High friction surface treatment at various locations in District 5. — Executed Nov 26 New Open Road Paving Company LLC $1,539,345 ·
Mar 9, 2018 70C72 ChampaignDeWittMcLeanDistrict 5 Bridge deck sealing along various routes in District 5. — Executed Nov 26 New All States Painting, Inc. $219,711 ·
Mar 9, 2018 70D00 McLeanDistrict 5 52.21 miles Class A and B patches on I-74 from Carlock to NW of Bloomington, on I-55, from the county line to SW of Bloomington, and on I-55, from NE of Bloomington to the Lexington County line. — Executed Nov 26 New G. M. Sipes Construction, Inc. $520,425 ·
Apr 27, 2018 68A79 McLeanTazewellWoodfordDistrict 4 10.97 miles of pavement rubblization, overlay and new pavement construction with drainage and bridge work from west of the Tazell county line near Deer Creek to east of the Carlock interchange. — Executed Nov 26 New Rowe Construction, a Division of UCM, Inc. and Advanced Asphalt Company Joint Venture $57,888,042 ·
Apr 27, 2018 70C80 DeWittMcLeanDistrict 5 Replacing light towers with new LED highway lighting at seven intersections along US 51. — Executed Nov 26 New Bodine Electric of Decatur $456,965 ·
Apr 27, 2018 70C99 McLeanDistrict 5 Bridge joint repair on various structures along I-55/I-74 in Bloomington/Normal. — Rejected Nov 26 New Kovilic Construction Company, Inc. $395,000 ·
Apr 27, 2018 70D10 McLeanDistrict 5 Deck repair on bridge SN 057-0188 carrying US 51 over Sugar Creek. — Executed Nov 26 New Stark Excavating, Inc. $331,076 ·
Jun 15, 2018 70533 McLeanDistrict 5 600 feet of Bridge removal (demo) and replacement on Old US 66 over a stream just north of Lexington. — Executed Nov 26 New Stark Excavating, Inc. $864,711 ·
Jun 15, 2018 70D21 McLeanDistrict 5 5,290 feet of 3P resurfacing and ADA improvements on I-55B and IL 9, from 0.1 mile north of E. Washington St. to Clearwater Avenue, and Service Dr. to Prospect Rd. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $3,312,391 ·
Jun 15, 2018 91560 McLeanDistrict 5 Resurfacing CH 5 from Lincoln Street in Saybrook to IL 54 in Bellflower. — Executed Nov 26 New H. J. Eppel & Co. $1,787,868 ·
Sep 21, 2018 70D35 DeWittMcLeanVermilionDistrict 5 Guardrail improvements at 111 locations on various routes in Vermilion, McLean, and Dewitt Counties. — Executed Nov 26 New Lovewell Fencing, Inc. $1,446,915 ·
Nov 9, 2018 70752 McLeanDistrict 5 Remove and replace 7 culverts at various location from 0.4 miles south of US 136 to 3 miles north of Heyworth, and place riprap for scour mitigation at SN 057-0225. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $1,368,849 ·
Jan 18, 2019 70D49 DeWittMcLeanPiattDistrict 5 5.88 miles of Class A patching from Champaign County line to east of Downs on I-74, and one spot location just south of Hudson on I-39. — Executed Nov 26 New G. M. Sipes Construction, Inc. $193,089 ·
Mar 8, 2019 70D48 DeWittMcLeanDistrict 5 8.126 miles of resurfacing (smart) at various locations — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $381,521 ·
Mar 8, 2019 70D54 McLeanDistrict 5 Bridge joint repairs and patching to SN 057-0018 and 0019 over Old 150 and NandW RR 3.8 miles SW of RT 51. — Executed Nov 26 New Otto Baum Company, Inc. $377,525 ·
Apr 26, 2019 70D14 McLeanDistrict 5 Replace piers, joints and place surface treatment on deck of SN 057-6301 carrying US 51 Business S.B. (S. Center Street) in downtown Bloomington. — Executed Nov 26 New St. Louis Bridge Construction Company $835,079 ·
Jun 14, 2019 70D47 McLeanDistrict 5 BRIDGE DECK REPAIRS OVER NS RR IN BLOOMINGTON. — Executed Nov 26 New Stark Excavating, Inc. $417,614 ·
Jun 14, 2019 70D79 McLeanDistrict 5 TREE REMOVAL, SELECTIVE CLEARING, and SEEDING AT FUNKS GROVE REST AREA. — Executed Nov 26 New CSD Environmental Services, Inc. $74,586 ·
Jun 14, 2019 70E05 DeWittMcLeanPiattDistrict 5 CONCRETE CONTAINMENT STRUCTURES FOR LIQUID BRINE AT TOWANDA, LEROY, CLINTON,AND MONTICELLO STORAGES. — Executed Nov 26 New Stark Excavating, Inc. $349,350 ·
Jun 14, 2019 91755 McLeanDistrict 5 Contruction of a bikeway along Old US 66, 1.1 miles South of E 850 North Road to E 550 North Road. — Rejected Nov 26 New Rowe Construction, a div of UCM, Inc. $2,132,081 ·
Jul 12, 2019 70B09 McLeanDistrict 5 6.225 miles of pavement rehabilitation: standard overlay from N of Lexington to the Livingston CO. line. — Executed Nov 26 New H. J. Eppel & Co. $1,599,110 ·
Jul 12, 2019 70E04 McLeanDistrict 5 Pavement preservation smart overlay from 0.1 miles W of Morris Ave to 0.3 miles W of US 51 BUS in Bloomington. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $482,865 ·
Jan 17, 2020 70912 McLeanDistrict 5 Interstate resurfacing and ramp repair S of Lexington to Livingston Co Line 9.67 miles. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $14,966,522 ·
Jan 17, 2020 91583 McLeanDistrict 5 Replace the bridg ecarrying TR94 over Kings Mill Creek located 4.5 miles Northwest of Shirley. — Executed Nov 26 New Stark Excavating, Inc. $798,771 ·
Mar 6, 2020 70D86 McLeanDistrict 5 6.287 miles oc Ultra-Thin Bonded Wearing Course on I-55/I-74 from Fox Creek Rd to Sugar Creek in Bloomington/Normal. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $6,485,906 ·
Mar 6, 2020 70E32 McLeanDistrict 5 8.390 miles of patching from W of I-55 to the Livingston County Line. — Executed Nov 26 New Lion Construction 1, LLC $321,387 ·
Mar 6, 2020 70E46 McLeanDistrict 5 2020 National Highway Preservation Project to replace five of the light towers and add an additional light tower at the interchanges of I-39 and US Bus 51 along I-55. — Executed Nov 26 New Capitol Construction Group, LLC d/b/a Egizii Electric $355,451 ·
Apr 24, 2020 70D65 McLeanDistrict 5 Bridge deck overlay of FAI 39 from 2100 N to 2200 N at Hudson. — Executed Nov 26 New Stark Excavating, Inc. $3,960,429 ·
Apr 24, 2020 70D73 McLeanDistrict 5 Rest area improvement at Funks Grove Rest Area. — Executed Nov 26 New Otto Baum Company, Inc. $1,123,868 ·
Apr 24, 2020 70E15 McLeanDistrict 5 Bridge joint replace/repair, bridge deck repairs to SN 057-0022 and 057-0023. — Executed Nov 26 New Stark Excavating, Inc. $773,590 ·
Apr 24, 2020 70E40 DeWittMcLeanDistrict 5 25.55 miles of patching Macon/DeWitt to 2.9 miles S of I-74/US 51 interchange. — Executed Nov 26 New Beniach Construction Co., Inc. $446,314 ·
Jun 12, 2020 46543 McLeanPiattDistrict 5 Grooving and pavement striping in Piatt and McLean counties. — Executed Nov 26 New ROADSAFE TRAFFIC SYSTEMS, INC. $1,763,650 ·
Jun 12, 2020 70E16 McLeanDistrict 5 2.989 miles of Standard overlay on Old Rte 66 from Shirley to I-74. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $1,476,692 ·
Jun 12, 2020 70E31 McLeanDistrict 5 Resurfacing (SMART) 0.3 mile W of I-55 to Old Route 66 W of Chenoa. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $96,406 ·
Jun 12, 2020 70E45 McLeanDistrict 5 0.833 mile of patching at Carlock Weigh Station. — Executed Nov 26 New Beniach Construction Co., Inc. $135,953 ·
Jun 12, 2020 91585 McLeanDistrict 5 Resurfacing CH 14 from IL 165 to CH 29 in Towanda — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $1,992,414 ·
Jun 12, 2020 91589 McLeanDistrict 5 Sidewalk construction at various locations within 2 miles of the Sheridan Elementary Shcool in Bloomington. — Executed Nov 26 New Stark Excavating, Inc. $207,192 ·
Sep 18, 2020 70E94 McLeanDistrict 5 Bridge Joint Repair of S.N. 057-0223 carrying Raab Rd. over 1-55. — Executed Nov 26 New Stark Excavating, Inc. $231,290 ·
Nov 6, 2020 70D87 McLeanDistrict 5 Bridge Painting at 5 Structure Locations on 1-39 and 1-55 in Mclean County. — Executed Nov 26 New Venus Painting Co. $1,738,976 ·
Jan 15, 2021 70A65 McLeanDistrict 5 3P Policy Standard Overlay ADA Improvements from W of Commerce Pkwy to 0.1 Mi N of E Washington St Gross Length = Net Length = 13,054.36 FT= 2.472 Mile. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $6,473,808 ·
Jan 15, 2021 70D16 McLeanDistrict 5 Bridge Deck Overlay at Funk's Grove Rest Area. — Executed Nov 26 New Stark Excavating, Inc. $3,668,318 ·
Mar 5, 2021 46927 McLeanDistrict 5 The work includes HMA resurfacing of roadway and parking areas, striping of of parking areas, sign replacements, aggregate resurfacing of camp sites and hunting lots, guardrail replacement, concrete barrier wall construction, and other misc. improvement items at Moraine View State Recreation Area (IDNR) in LeRoy, McLean County. — Executed Nov 26 New H. J. Eppel & Co. $2,654,792 ·
Mar 5, 2021 70E99 DeWittMcLeanDistrict 5 BRIDGE JOINT REPAIR/REPLACE AT VARIOUS LOCATIONS IN DEWITT AND MCLEAN COUNTIES. — Executed Nov 26 New Path Construction Company, Inc. $448,820 ·
Apr 23, 2021 68G20 MarshallMcLeanWoodfordDistrict 4 Installation of communications duct, communications vaults, and fiber optic cable along Interstate 39 from the Interstate 55 interchange to Illinois Route 17 in District Four. — Executed Nov 26 New Gerstner Electric, Inc. $1,837,876 ·
Apr 23, 2021 70E18 McLeanDistrict 5 Designed Overlay on Old Rte. 66 from Logan Co. line to Shirley for a net length of 9.57 miles. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $5,233,531 ·
Apr 23, 2021 70E49 McLeanDistrict 5 Interstate Bridge Preservation/ Bridge Deck Overlay at I-39/US 51 Over Mackinaw River North of Hudson. — Executed Nov 26 New Stark Excavating, Inc. $3,710,497 ·
Apr 23, 2021 70F05 McLeanDistrict 5 Class a special patching on nearly 2 miles of Eb/Wb 1-74 near Carlock. — Executed Nov 26 New Kinney Contractors, Inc. $121,468 ·
Apr 23, 2021 70F06 McLeanDistrict 5 .245 Miles of Partial Width Resurfacing Under Veterans Parkway and Under I-55B in Bloomington. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $143,207 ·
Apr 23, 2021 91603 McLeanDistrict 5 Cold-in-Place recycling with HMA binder and surface course on CH 39 from White Oak Road to Ziebarth Road. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $1,305,243 ·
Jun 11, 2021 70F03 McLeanDistrict 5 The project is to replace four light towers with twelve new LED highway light poles at the interchange of I-74 and FAS 1478 (Chestnut St) in LeRoy, IL in McLean County. — Executed Nov 26 New Champaign Signal and Lighting Co. A Division of Champaign Asphalt Company LLC $128,858 ·
Jun 11, 2021 91602 McLeanDistrict 5 Resurfacing, shoulder rumble strips, guardrail, traffic barrier terminals and pavement markings on CH 37 from north of Northtown Road to CH 12 in Hudson. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $2,045,287 ·
Sep 17, 2021 70F64 ChampaignDouglasMcLeanDistrict 5 43.69 miles of pavement marking on I-55 from Sugar Creek to 1.0 miles E of the Veterans Parkway interchange, and on I-57 from the Coles County line S of Arcola to the Ford County line. — Executed Nov 26 New Varsity Striping & Construction Co. $1,676,308 ·
Jan 21, 2022 70D64 McLeanDistrict 5 Bridge deck overlay on I-55 from N of Lexington to Livingston Co. line for a gross length of 9.96 miles. — Rejected Nov 26 New Stark Excavating, Inc. $7,171,002 ·
Jan 21, 2022 70E74 McLeanDistrict 5 Bridge painting at 10 structure locations on FAI-74 and FAI-39 in McLean County. — Executed Nov 26 New ERA-Valdivia Contractors, Inc. $1,899,396 ·
Mar 11, 2022 70988 McLeanDistrict 5 3P Policy Standard Overlay and Culvert Replacement on US 24 from Woodford Co. Line to McLean St. in Gridley, McLean County. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $2,617,193 ·
Mar 11, 2022 70E19 McLeanDistrict 5 Resurfacing on Old 66 from S of Veterans Parkway to 1.7 Mi SW of Towanda, McLean County. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $848,139 ·
Mar 11, 2022 70F57 McLeanDistrict 5 Bridge deck repairs Southbound FAI 55 (I-55) SN 057-0154 over US 136 at McLean. — Executed Nov 26 New Stark Excavating, Inc. $453,779 ·
Mar 11, 2022 70F67 DeWittMcLeanDistrict 5 1) 5.36 miles on FAI 55 (I-55), Class A special patching from SW of Bloomington to S of Shirley. 2) 0.92 mile on FAU 6406 (US 150), Class B patching from Veteran's PKWY to just S of Woodrig Rd. 3) 0.28 mile on FAP 708 (US 51 BUSN), Class B patching from US 51 to 0.3 mile S of US 51. — Executed Nov 26 New Kinney Contractors, Inc. $489,892 ·
Mar 11, 2022 91608 McLeanDistrict 5 Resurfacing White Oak Road from US 150 to Locust Street. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $2,195,312 ·
Apr 29, 2022 70778 McLeanDistrict 5 3P resurfacing (standard overlay) of FAP 701 (ILL 122) from Tazewell Co Line to ILL 9. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $3,718,559 ·
Apr 29, 2022 70994 McLeanDistrict 5 3P Resurfacing Standard overlay from S Main St. in McLean to US 51 in Heyworth. Project length 9.44 miles. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $4,611,308 ·
Apr 29, 2022 70E03 McLeanDistrict 5 Cape Seal from Woodford Co. Line to ILL 9 West of Bloomington. — Executed Nov 26 New Beniach Construction Co., Inc. $1,797,603 ·
Apr 29, 2022 70E79 McLeanDistrict 5 Bridge deck sealing of 63 structures on various routes in McLean County. — Executed Nov 26 New Interstate Maintenance, Incorporated $161,254 ·
Apr 29, 2022 70F34 McLeanDistrict 5 Bridge preservation - pier repairs. — Executed Nov 26 New Stark Excavating, Inc. $656,698 ·
Jun 17, 2022 46597 McLeanDistrict 5 0.852 mi, NW of Normal near I-55/I-74 Split, Statewide other - miscellaneous. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $140,128 ·
Jun 17, 2022 91543 McLeanDistrict 5 Resurface CH 24 from Tazewell County line to IL 122. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $2,528,803 ·
Jul 15, 2022 70F89 DeWittMcLeanDistrict 5 0.282 Mile of Standard Overlay at Median Turnaround at Mclean I Dewitt County Line South of Heyworth and at Quest Drive Frontage Road South of Bloomington. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $242,701 ·
Sep 23, 2022 70943 McLeanDistrict 5 7.097 miles, 3P-Policy Standard Overlay, Milled Rumble Strip New Shoulders ILL 122 TO WALTON DR IN BLOOMINGTON, Culvert Repair, STREAM 0.2 Ml W OF JCT US 150 W OF BLOOMINGTON. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $7,188,527 ·
Mar 10, 2023 70541 McLeanDistrict 5 Bridge Superstructure Replacement at Kickapoo Creek 1 Mile North of US 136. — Executed Nov 26 New Stark Excavating, Inc. $2,231,946 ·
Mar 10, 2023 70907 McLeanDistrict 5 Culvert replacement on US 51B over ditch 0.1 mile North of RAAB Rd, in Normal, — Executed Nov 26 New Stark Excavating, Inc. $552,000 ·
Mar 10, 2023 70G18 McLeanDistrict 5 2.5 miles of longitudinal joint repair from Colton Ave. to Carnahan Dr. in Bloomington. — Rejected Nov 26 New Rowe Construction, a div of UCM, Inc. $407,070 ·
Apr 28, 2023 70A58 McLeanDistrict 5 2.23 Mi, Standard Overlay ADA Improvements, Clearwater Ave to Old Route 66 in Bloomington/Normal. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $7,537,504 ·
Apr 28, 2023 70E17 McLeanDistrict 5 10.67 Miles of Designed Overlay Resurfacing from Logan Co. Line to 1.8 Miles S. of Shirley. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $22,580,956 ·
Apr 28, 2023 70E86 McLeanDistrict 5 Resurfacing (3P) Standard Overlay of F.A.P. 693 (ILL 9) from 0.4 Mi E of ILL 165 to Arrowsmith Rd. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $5,524,703 ·
Apr 28, 2023 70F30 McLeanDistrict 5 7.281 Miles of Micro-Surfacing 1 Pass and Crack and Joint Sealing on US 24 from Mclean St. in Gridley to 0.4 mile West of 1-55 at Chenoa. — Executed Nov 26 New Beniach Construction Co., Inc. $644,599 ·
Apr 28, 2023 70G08 McLeanDistrict 5 2.615 Miles of Interstate Smart Overlay on I-74 from 0.4 Mile North of I-55 Business to 0.3 Mile East of US 51 at Bloomington and 1-55 Business from I-55 to 0.4 Mile North. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $7,968,555 ·
Apr 28, 2023 91621 McLeanDistrict 5 Resurfacing, Base course widening, concrete curb and gutter and rumble strips on CH 18 from State Street in Donvers to US 150. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $4,301,038 ·
Jun 16, 2023 70A88 McLeanDistrict 5 6.79 Mi., Standard Overlay 0.4 Mi. E of Grant St in Chenoa to Livingston Co. Line. — Executed Nov 26 New Kankakee Valley Construction Company, Inc. $3,924,420 ·
Jun 16, 2023 70G15 McLeanDistrict 5 0.292 Miles of Standard Overlay on FAS 488 (CH 53) from NB Ramp to SB Ramp of I-74 at Carlock Interchange. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $486,088 ·
Aug 4, 2023 70G83 McLeanDistrict 5 30.7 mi of patching on I-55 0.3 mi SW of Airport Rd to N of Turkey Creek W of Lexington; I-55 0.2 mi S of Six Points Rd to up RR; I-74 Veterans Parkway to 1 mi S of Chestnut St SW of Leroy; I-74 Carlock to I-55 N of Bloomington; I-74 at Carlock weigh station ramps. — Executed Nov 26 New Kinney Contractors, Inc. $762,847 ·
Aug 4, 2023 70G84 McLeanDistrict 5 1.34 mi of longitudinal joint repair W of Colton Ave to Empire Crossing in Bloomington. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $433,701 ·
Nov 17, 2023 70G12 McLeanDistrict 5 Bridge painting of 3 structures on FAI 55 (I-55) and FAP 704 (I-55 Busn). — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $1,273,331 ·
Jan 19, 2024 70871 McLeanDistrict 5 0.17 Mi Complete structure replacement over Intermittent stream 0.5 miles East of Chenoa. — Executed Nov 26 New Stark Excavating, Inc. $1,987,717 ·
Jan 19, 2024 91619 McLeanDistrict 5 fulldepth pavement reconstruction, pipe underdrains, storm sewer, sidewalks, curb and gutter, signing, traffic signals, and lighting on West College Avenue from US 150/Rivian Motorway to west of the Norfolk Southern Railroad in Normal. Project includes reconstruction of the US 150, West College intersection to include a right turn lane onto West College Road. — Active Nov 26 New Stark Excavating, Inc. $15,837,316 ·
Mar 8, 2024 70855 McLeanDistrict 5 3P Policy, Designed Overlay, ADA Improvements, Traffic Improvements and Traffic Signal Replacement in Bloomington. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $9,025,006 ·
Mar 8, 2024 70F49 McLeanDistrict 5 Miscellaneous projects at Leroy, Towanda, Bloomington Complex. — Executed Nov 26 New H. J. Eppel & Co. $255,057 ·
Mar 8, 2024 70G89 McLeanDistrict 5 0.23 miles Rumble Strip Installation, US Route 24 at Old US Route 66 Intersection. — Executed Nov 26 New Kinney Contractors, Inc. $202,904 ·
Mar 8, 2024 91620 McLeanDistrict 5 Construct a 10 foot wide HMA shared-Use path, PCC sidewalk, curb and gutter, and landscaping along Gregory Street from Parkside Road to Adelaide Street in Normal. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $1,023,294 ·
Mar 8, 2024 91637 McLeanDistrict 5 HMA resurfacing with HMA base course widening, concrete curb and gutter, and shoulder rumble strips on CH 15 from IL 1654 to IL 9. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $2,971,504 ·
Apr 26, 2024 70E12 McLeanDistrict 5 14.93 miles of SMART Overlay - Standard Overlay ADA Improvements. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $6,488,552 ·
Apr 26, 2024 70G75 McLeanDistrict 5 7.544 miles of SMART resurfacing form West of Cooksville to East of Colfax. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $1,818,351 ·
Apr 26, 2024 70H14 McLeanDistrict 5 Bridge painting of 6 structures on various routes in McLean County. — Executed Nov 26 New Three Star Painting, Inc. $707,507 ·
Jun 14, 2024 70G90 McLeanDistrict 5 Traffic signal modernization on IL 9 at Towanda Barnes Rd in Bloomington. — Executed Nov 26 New Bodine Electric of Decatur $489,967 ·
Aug 2, 2024 70G11 McLeanDistrict 5 7.36 miles of Smart Overlay 2.5 miles south of I-74 to 1 mile south of Heyworth. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $3,559,956 ·
Aug 2, 2024 70H38 McLeanDistrict 5 18.83 miles of patching on FAI 39 and FAI 55. — Executed Nov 26 New Kinney Contractors, Inc. $298,674 ·
Aug 2, 2024 70H40 McLeanDistrict 5 1.2 miles of Smart Overlay on US 24 from 0.4 miles west of I-55 to the U.P. RR in Chenoa. — Executed Nov 26 New Rowe Construction, a div of UCM, Inc. $649,863 ·
Nov 8, 2024 91599 McLeanDistrict 5 HMA Resurfacing, Traffic Signal Improvements, Curb and Gutter, Storm Sewer, Sidewalks, Multi-Use Path, ADA Ramps, and Watermains on Hamilton Road from Commerce Parkway to US 150 in Bloomington. — Executed Nov 26 New Stark Excavating, Inc. $4,698,912 ·
Jan 17, 2025 70571 McLeanDistrict 5 0.013 miles of bridge replacement at Intermittent Stream_0.9 miles west of I-55 west of Chenoa. — Executed Nov 25 New Stark Excavating, Inc. $2,190,999 ·
Jan 17, 2025 70G85 McLeanDistrict 5 Dynamic Message Signs at various locations in Bloomington/Normal. — Executed Nov 25 New Bodine Electric of Decatur $2,995,164 ·
Mar 7, 2025 70D55 McLeanDistrict 5 10.76 miles of pavement rehab - Designed Overlay Resurfacing (INT-3rd), underdrains, patching, paving and low speed weigh in motion scale from 0.3 mile west of TR 90 (725 E Rd) south of Carlock to I-55 north of Normal (including ramps and Carlock weigh stations). — Executed Nov 25 New Rowe Construction, a div of UCM, Inc. $36,874,418 ·
1–100 of 127Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.