IDOT Jobs

All dates · 236 jobs · — Sign up free
★ My Jobs

Filtered by: County: Lake Clear all

236 jobs · — estimated

ExcelCSV
Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Jan 19, 2018 61E13 LakeDistrict 1 Resurfacing 21st Street from Sheridan Road east for 1,600 ft., and 29th Street from Lewis Avenue to Galilee Avenue in the City of Zion. — Executed Nov 26 New Peter Baker & Son Co. $456,777 ·
Jan 19, 2018 61E28 LakeDistrict 1 Replace the bridge carrying Forest Avenue over Ravine Ditch #7, south of Hazel Avenue in the City of Highland Park. — Executed Nov 26 New Lorig Construction Company $2,655,120 ·
Jan 19, 2018 61E33 LakeDistrict 1 Traffic signal improvement on US 12 from IL 176 to IL 22. — Executed Nov 26 New Home Towne Electric, Inc. $898,265 ·
Mar 9, 2018 60X51 LakeDistrict 1 Remove and replace the bridge carrying westbound US 12 over southbound IL 59 in the village of Fox Lake. — Executed Nov 26 New Areatha Construction Co., Inc. $2,853,198 ·
Mar 9, 2018 61E38 LakeDistrict 1 Resurfacing from Fairfield Road to Gilmer Road in the Village of Hawthorn Woods. — Executed Nov 26 New Peter Baker & Son Co. $430,262 ·
Apr 27, 2018 60T75 LakeDistrict 1 Reconstruct US 45 on a new alignment and re-align Grass Lake Road to create a four-legged intersection with US 45 and Millburn Road in the Villages of Old Mill Creek and Lindenhurst. — Executed Nov 26 New Berger Excavating Contractors, Inc. $15,577,444 ·
Apr 27, 2018 60Y83 LakeDistrict 1 Resurfacing, pedestrian ramps and drainage work in the villages of Island Lake and Wauconda. — Executed Nov 26 New Lorig Construction Company $1,105,951 ·
Apr 27, 2018 61C48 LakeDistrict 1 Reconstruction, drainage improvements, and bike/pedestrian path construction on Sayton Road from US 12 to Rollins Road, and from Rollins Road to Industrial Avenue in the Village of Fox Lake. — Executed Nov 26 New Berger Excavating Contractors, Inc. $1,769,565 ·
Apr 27, 2018 61E22 LakeDistrict 1 Reconstruction and widening to add one thru lane in each direction and bicycle/pedestrian accommodations on Quentin Road from IL 22 to White Pine Road. — Executed Nov 26 New Lake County Grading Company, LLC $20,129,203 ·
Apr 27, 2018 61E59 LakeDistrict 1 Resurfacing Golf Road from Butterfield road to Milwaukee Avenue in the Village of Libertyville. — Executed Nov 26 New Peter Baker & Son Co. $1,240,026 ·
Apr 27, 2018 61E66 LakeDistrict 1 Construction of a multi-use path adjacent to Molidor Road, from 0.5 mile west of Fish Lake Road to Fish Lake Road in Grant Township. — Executed Nov 26 New Campanella and Sons, Inc. $313,595 ·
Apr 27, 2018 61E70 LakeDistrict 1 Sidewalk construction algon Clavey Road from Barberry Road to the Skokie Valley Bike Path in the City of Highland Park. — Executed Nov 26 New Sumit Construction Co., Inc. $54,111 ·
Apr 27, 2018 62A14 LakeDistrict 1 ADA ramp improvement on various routes in the villages of Deerfield and Lake Bluff and the cities of Highland park and Lake Forest. — Executed Nov 26 New Sumit Construction Co., Inc. $539,989 ·
Apr 27, 2018 62B84 LakeDistrict 1 Repair culvert carrying IL 22 over East Tributary to Flint Creek, 1.2 miles West of IL 59. — Executed Nov 26 New D. Construction, Inc. $360,217 ·
Apr 27, 2018 62C75 LakeDistrict 1 Resurfacing IL 132 through the villages of Lake Villa and Lindenhurst. — Executed Nov 26 New Peter Baker & Son Co. $825,294 ·
Apr 27, 2018 62D19 LakeDistrict 1 Resurfacing and pedestrian ramp improvement on US 14 through the Village of Barrington. — Executed Nov 26 New Lorig Construction Company $1,371,351 ·
Apr 27, 2018 62F26 LakeDistrict 1 Resurfacing on IL 132 in the villages of Gurnee and Lake Villa. — Executed Nov 26 New Payne & Dolan, Inc. $4,732,733 ·
Apr 27, 2018 62F34 LakeDistrict 1 Joint and deck repairs on bridge SN 049-0170 carrying IL 137 over US 45 in the Village of Libertyville. — Executed Nov 26 New MYS, Incorporated $347,791 ·
Apr 27, 2018 62F55 LakeDistrict 1 Resurfacing and shoulder improvement on IL 120 in the villages of Grayslake, Gurnee, Libertyville and the city of Waukegan. — Executed Nov 26 New Peter Baker & Son Co. $4,847,258 ·
Jun 15, 2018 60V55 LakeDistrict 1 Widening, resurfacing and traffic signal modernization in the Village of Lindenhurst. — Executed Nov 26 New Berger Excavating Contractors, Inc. $14,793,279 ·
Jun 15, 2018 61E76 LakeDistrict 1 Resurfacing, sidewalk replacement, curb and gutter replacement on FAU Rute 2758 (Moffett Road) from Sheridan Road to Center Avenue in the Village of Lake Bluff . — Executed Nov 26 New Berger Excavating Contractors, Inc. $1,066,253 ·
Jun 15, 2018 61E81 LakeDistrict 1 Sidewalk construction at various locations in the Village of Lake Zurich. — Executed Nov 26 New Copenhaver Construction, Inc. $149,994 ·
Jun 15, 2018 61E83 LakeDistrict 1 Resurfacing Volo Village Road from Belvidere Road (IL 12) to Rand Road (US 12) in the Village of Volo — Executed Nov 26 New Peter Baker & Son Co. $233,612 ·
Jun 15, 2018 62B61 LakeDistrict 1 Channelization on IL 53, from Long Grove Drive to Middlesax Drive in the village of Long Grove. — Executed Nov 26 New Berger Excavating Contractors, Inc. $1,800,000 ·
Jun 15, 2018 62C74 LakeDistrict 1 3.632 miles of resurfacing and pedestrain ramp improvments on IL 132 in Gurnee and Waukegan. — Executed Nov 26 New Peter Baker & Son Co. $4,377,353 ·
Aug 3, 2018 60Y22 LakeMcHenryDistrict 1 Intersection improvement with retaining wall and traffic signal modernization on IL 176 at Roberts Road in Island Lake. — Executed Nov 26 New Alliance Contractors, Inc. $1,138,109 ·
Aug 3, 2018 61E17 LakeDistrict 1 Construct a pedestrian patch adjacent to Maple Avenue, from Midlothian Road to Lake Street in the Village of Mundelein. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $2,639,771 ·
Aug 3, 2018 62G44 LakeDistrict 1 Demolition of 5 single family residences at various locations near US 14 and the Canadian National Railway in the the village of Barrington. — Executed Nov 26 New Copenhaver Construction, Inc. $311,742 ·
Nov 9, 2018 60R79 LakeDistrict 1 Bridge deck overlay and bridge joint repairs at two structures carrying US 12 over Nippersink Lake Channel and over Pistkee Lake Channel. — Executed Nov 26 New Lorig Construction Company $2,241,247 ·
Nov 9, 2018 62D35 LakeDistrict 1 Drainage improvements along IL 59 and IL 22 in the village of North Barrington. Includes storm sewer, culvert lining and partial culvert barrel replacement. — Executed Nov 26 New Martam Construction Incorporated $889,433 ·
Jan 18, 2019 46481 LakeDistrict 1 Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. — Executed Nov 26 New Superior Road Striping, Inc. $278,325 ·
Jan 18, 2019 61F33 LakeDistrict 1 Pavement reconstruction, construction of a shared use path, and lighting improvements on 14th Street from Green Bay Road to Sheridan Road in North Chicago. — Executed Nov 26 New Berger Excavating Contractors, Inc. $16,525,114 ·
Jan 18, 2019 62C77 LakeDistrict 1 Resurfacing on US 41 (Skokie Hwy) from 1000 feet north of IL 176 (Rockland Rd) to 100 feet north of IL 120 (Belvidere Rd.). — Executed Nov 26 New Peter Baker & Son Co. $6,097,098 ·
Jan 18, 2019 62F48 LakeDistrict 1 Resurfacing, pedestrian ramp improvement, and culvert repair on US 41 from Park Ave. West to Il 176 (Rockland Rd.); and on IL 22 from Tennyson Lane to US 41. 8.29 miles. — Executed Nov 26 New Peter Baker & Son Co. and Plote Construction, Inc JV $13,226,577 ·
Jan 18, 2019 62G87 CookLakeMcHenryDistrict 1 Cleaning and painting existing steel on structures. IL 137 over US 45, IL 31 over UPRR, and Green Bay Road over North Shore Channel. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $302,850 ·
Jan 18, 2019 62H31 CookLakeDistrict 1 Crack and joint sealing on US 12 (Rand Rd.) from Ela Road to IL 58 (Golf Rd.) — Executed Nov 26 New Freehill Asphalt, Inc. $451,265 ·
Mar 8, 2019 60R68 LakeDistrict 1 Bridge deck scarification and latex concrete overlay, retrofitting bridge parapets, and reconstruction of transverse bridge joints to IL 43 over IL 120. — Executed Nov 26 New Areatha Construction Co., Inc. $1,777,994 ·
Mar 8, 2019 61F47 LakeDistrict 1 Resurfacing Greenwood Avenue from Wilmot Road to Waukegan Road in Deerfield. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $1,668,129 ·
Mar 8, 2019 62D38 LakeDistrict 1 Remove and replace original section of the culvert (approximately 40 ft) in the center portion of the culvert carrying IL 21 (Milwaukee Ave.) over a ditch in the village of Vernon Hills (SN 049-0599) — Executed Nov 26 New Martam Construction Incorporated $377,924 ·
Mar 8, 2019 62G58 LakeDistrict 1 2 miles of resurfacing on IL 137 (Amstutz Expressway) from IL 120 (Belvidere Street) to just south of IL 137 (Greenwood Avenue) in the City of Waukegan. — Executed Nov 26 New J. A. Johnson Paving Company $2,327,169 ·
Mar 8, 2019 62G90 LakeDistrict 1 Sheet pile retaining wall and parking improvement at Illinois Beach State Park — Executed Nov 26 New Alliance Contractors, Inc. $953,418 ·
Mar 8, 2019 62H39 LakeDistrict 1 Demolition of a single-family home in Mundelein and an auto repair building in Grayslake. — Executed Nov 26 New Lima Contractors $158,946 ·
Apr 26, 2019 61E24 LakeDistrict 1 Pavement reconstruction, sidewalks, HMA pedestrian path, box culvert, water main relacation, traffic signal and street lighting on Weiland Road from Deerfield Parkway to Lake Cook Road. — Executed Nov 26 New Lake County Grading Company, LLC $12,090,770 ·
Apr 26, 2019 61F65 LakeDistrict 1 Reconstruction of Orchard Lane from Monaville Road to Rollins Road, and resurfacing of Hook Lane from Orchard Lane to Rollins Road in the Village of Round Lake Beach. — Executed Nov 26 New Campanella and Sons, Inc. $5,231,811 ·
Apr 26, 2019 61F69 LakeDistrict 1 Resurfacing Grand Avenue from Nippersink Boulevard to Illinois Route 59 in the Village of Fox Lake. — Executed Nov 26 New Peter Baker & Son Co. $1,287,252 ·
Apr 26, 2019 61F75 LakeDistrict 1 Roadway reconstruction on Rockland Road from IL 21 to the Des Plaines River in Libertyville. — Executed Nov 26 New Copenhaver Construction, Inc. $6,139,354 ·
Apr 26, 2019 62C01 LakeDistrict 1 1.433 miles of 3P resurfacing and milled rumble strips on US 41 from IL 120 to Dorchester Avenue in Parck City and Gurnee. — Executed Nov 26 New Peter Baker & Son Co. $3,628,516 ·
Apr 26, 2019 62G96 LakeDistrict 1 0.947 mile of 3P resurfacing and overlaying including pedestrian curb improvements on US 41 from Lake-Cook Road to south of Chantilly Boulevard in Highland Park. — Executed Nov 26 New Plote Construction, Inc. $2,694,455 ·
Apr 26, 2019 62H28 LakeDistrict 1 Routing, cleaning and sealing longitudinal cracks on IL 137 from IL 83 to O'Plaine Road in Libertyville and Green Oaks. — Executed Nov 26 New SKC Construction, Inc. $254,148 ·
Apr 26, 2019 62H29 CookLakeDistrict 1 A total of 10.2 miles of routing, cleaning, and sealing of longitudinal cracks at 3 locations on IL 21/US 45 in Niles, Glenview, Vernon Hills, Libertyville and Gurnee. — Executed Nov 26 New Denler, Inc. $525,544 ·
Apr 26, 2019 62H36 LakeDistrict 1 1.9 miles of resurfacing, pedestrian ramp improvements and culvert repairs on US 41 from West Park Avenue to Chantilly Boulevard in the City of Highland Park. — Executed Nov 26 New Peter Baker & Son Co. and Plote Construction, Inc JV $5,321,788 ·
Apr 26, 2019 62H81 LakeDistrict 1 1.9 miles of ultra thin wearing course and ADA upgrades on US 41 from Ferndale Street to IL 21 in the Village of Gurnee. — Rejected Nov 26 New
Jun 14, 2019 46507 LakeWillDistrict 1 Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties. — Executed Nov 26 New STF, LLC d/b/a Traffic Control Company $593,000 ·
Jun 14, 2019 62B75 LakeDistrict 1 Intersection reconstruction at IL 131 and Kenosha Road in the Village of Beach Park. — Executed Nov 26 New Campanella and Sons, Inc. $3,348,311 ·
Jun 14, 2019 62G30 LakeDistrict 1 3.1 miles of resurfacing on IL 22 from N. Quentin Road to IL 83 in the Villages of Kildeer and Long Grove. — Executed Nov 26 New Builders Paving, LLC $1,698,888 ·
Jun 14, 2019 62G83 LakeDistrict 1 1.9 miles of resurfacing, shoulders, milled rumble strips, ADA ramps and pedestrian traffic signals at 2 locations in Gurnee, Livertyville, Waukegan and Park City: 1) IL 120 from east of I-94 to IL 43; 2)IL 21 at Red Top Drive. — Executed Nov 26 New Peter Baker & Son Co. $2,893,697 ·
Jun 14, 2019 62H10 LakeMcHenryDistrict 1 Guardrail improvements at varous locations in McHenry and Lake Counties. — Executed Nov 26 New Kujo, Inc. $655,072 ·
Jun 14, 2019 62H18 LakeDistrict 1 Culvert wing wall replacement on IL 120 just west of IL 83 in Grayslake. — Executed Nov 26 New Meru Corporation $147,965 ·
Jun 14, 2019 62H88 LakeDistrict 1 Demolition and site clean-up of three single-family residences on IL 22 between Quentin Road and west of IL 83 in Long Grove and Kildeer. — Executed Nov 26 New McDonagh Demolition, Inc. $122,288 ·
Jun 14, 2019 62J14 LakeMcHenryDistrict 1 Intermittent resurfacing on various routes in Lake and McHenry counties. — Executed Nov 26 New J. A. Johnson Paving Company $1,964,700 ·
Jul 12, 2019 62H92 LakeDistrict 1 1.8 miles of resurfacing and pedestrian ramp improvements along US 45 from Lake Woodlawn Dr. to IL RTE 83 in Mundelein. — Executed Nov 26 New Builders Paving, LLC $2,634,888 ·
Jul 12, 2019 62H95 LakeDistrict 1 3.56 miles of standard overlay and pedestrian ramp upgrades on IL-176 from Hilltop Terrace to De Webb Blvd. and on IL 60/83 from IL-176 to CN Railroad in Mundelein. — Executed Nov 26 New Arrow Road Construction Co. $2,064,157 ·
Jul 12, 2019 62J03 LakeDistrict 1 0.98 miles of designed overlay and pedestrian ramp improvements on IL 43 from McGaw Road / Pulaski Road to US 41 in Park City and Waukegan. — Executed Nov 26 New Peter Baker & Son Co. $1,997,757 ·
Aug 2, 2019 62H91 LakeDistrict 1 Drain tile repair project, includes replacement of 18" clay pipe with 24" reinforced concrete pipe in unincorporated Avon Township on IL 120, just east of Wilson Road — Executed Nov 26 New Lion Construction 1, LLC $497,411 ·
Sep 20, 2019 61D65 LakeDistrict 1 Reconstruct the intersection of Hart Road at US Route 14 in the Villages of Barrington and Barrington Hills. — Executed Nov 26 New Plote Construction, Inc. $7,965,000 ·
Sep 20, 2019 61F25 LakeDistrict 1 Pavement reconstruction and the construction of a HMA pedestrian path next to Weiland Road from Aptakisic Road to Deerfield Parkway, and on Aptakistic Road from Joseph Court to Industrial Drive in the villages of Buffalo Grove and Lincolnshire. — Executed Nov 26 New Berger Excavating Contractors, Inc. $12,469,513 ·
Sep 20, 2019 61G00 LakeDistrict 1 Reconstruction and resurfacing Rockland Road from east of the Des Plaines River bridge to St. Mary's Road, located in Libertyville Township, Lake County. — Executed Nov 26 New Berger Excavating Contractors, Inc. $1,964,385 ·
Nov 8, 2019 61F63 LakeDistrict 1 Construction of HMA path on Riverwoods Road between Daniel Wright School and Whytegate Park and construction of a sidewalk along Westminster Way from the CDW Path west for 0.07 miles, located in the Village of Lincolnshire. — Executed Nov 26 New Chicagoland Paving Contractors, Inc. $270,000 ·
Jan 17, 2020 62J05 LakeDistrict 1 Traffic signal modernization that includes going protected on for the NB/SB left turns and pedestrian improvements at the intersection of Il Rte 131 at IL Rte 120 in Waukegan. — Executed Nov 26 New Home Towne Electric, Inc. $269,491 ·
Jan 17, 2020 62K39 CookLakeDistrict 1 Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (S The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). 147 miles in length. — Rejected Nov 26 New Sewer Rat Contractors, LLC $211,200 ·
Mar 6, 2020 61G31 LakeDistrict 1 Roadway reconstruction on Thompson Boulevard from Brandywyn Lane to Buffalo Grove Road, and on Brandywyn Lane from Thompson Blvd. to Aptakisic Road in Buffalo Grove. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $3,224,076 ·
Mar 6, 2020 62G86 LakeDistrict 1 Cleaning and painting designated steel surfaces of bridge structures carrying IL 120 (Belvidere Rd) over Greenleaf St and CPRR in Gurnee, Waukegan, and Park City. — Executed Nov 26 New Eagle Painting & Maintenance Company, Inc. $498,300 ·
Mar 6, 2020 62J99 LakeDistrict 1 2.6 miles of designed overlay, new shoulders and pedestrian ramp improvements on IL 176 from Crescent Knoll Drive to west of US 41 in the Village of Libertyville. — Executed Nov 26 New Peter Baker & Son Co. $3,498,734 ·
Mar 6, 2020 62K17 LakeDistrict 1 Demolition of one commercial structure and one single-family residence at various locations near US 14 and CN Railroad in the Village of Barrington. — Executed Nov 26 New Copenhaver Construction, Inc. $237,435 ·
Jun 12, 2020 46545 LakeDistrict 1 Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings. — Executed Nov 26 New Superior Road Striping, Inc. $651,102 ·
Jun 12, 2020 61G47 LakeDistrict 1 Traffic Signal modifications, installation of fiber optic communication system, sidewalk replacement and pavment markings at various locations in Waukegan. — Executed Nov 26 New Home Towne Electric, Inc. $1,395,602 ·
Jun 12, 2020 61G49 LakeDistrict 1 Installation of snow-proof lens cover for red signal indications. — Executed Nov 26 New Meade Inc. $627,708 ·
Jun 12, 2020 62J92 LakeDistrict 1 (3.10 Mile) Overlay, pedestrian ramp new HMA Shoulders on IL- 173 Shoulders on IL- 173 from Green Bay Rd to Sheridan Rd . Drainage improvement between Hebron Ave. and Galilee Ave. in the City of Zion. — Executed Nov 26 New J. A. Johnson Paving Company $2,870,188 ·
Jun 12, 2020 62K19 LakeDistrict 1 (0.019MI) Bridge superstructure repair over Flint Creek Tributary. Located in the Village of Barrington on US 14. SN 049-0003. — Executed Nov 26 New Alliance Contractors, Inc. $264,114 ·
Jul 31, 2020 61G65 LakeDistrict 1 Construction of a shared-use path from the Raven Glen Forest Preserve to the Ethel's Woods Forest Preserve, and construction of a US 45 pedestrian underpass in Antioch. — Executed Nov 26 New Campanella and Sons, Inc. $3,315,373 ·
Jul 31, 2020 62J06 LakeDistrict 1 Traffic Signal Modernization at the intersection of IL 131 (Green Bay Rd) and Audrey Nixon Blvd / Casimir Pulaski Dr in North Chicago, Lake County. — Executed Nov 26 New Home Towne Electric, Inc. $259,097 ·
Jul 31, 2020 62J32 LakeDistrict 1 (6.452 Mile) Standard overlay and new HMA shoulders on IL 60/83 from IL 120 (Belvidere Rd) to IL 176. Located within the Villages of Volo, Ivanhoe, Round Lake Park. — Executed Nov 26 New Peter Baker & Son Co. $3,563,637 ·
Sep 18, 2020 60V06 LakeDistrict 1 Precast concrete pavement and class B concrete patches along IL 83, approximately 419 ft E of the center line of N Buffalo Grove Rd and approximately 29833 ft NE to US 45. — Executed Nov 26 New R. W. Dunteman Company $1,738,700 ·
Sep 18, 2020 61F90 LakeDistrict 1 Sidewalk construction at various locations in Lake Villa. — Executed Nov 26 New Electric Conduit Construction $388,937 ·
Sep 18, 2020 62B65 LakeDistrict 1 US 41 @ Deerpath Rd-PS#38. New pump station 38 in the SW quadrant of Deerpath Rd. @ Ahwahnee Ln., decommissioning existing pump station at bridge abutement (SN 049-0033). 2 detention ponds in Lake Forest golf course, 2 new ret. walls, resurfacing, drainage repairs (0.49 miles) — Executed Nov 26 New Berger Excavating Contractors, Inc. $12,127,335 ·
Sep 18, 2020 62K94 LakeDistrict 1 Weigh Station Repairs (remove and replace scales, steel beam support and deck platform, repairs to the pit walls and replacement of approach pavements. Location: Northbound Wasdworth Weigh Station in Wadsworth, Lake County. — Executed Nov 26 New Alliance Contractors, Inc. $328,144 ·
Sep 18, 2020 62L13 LakeDistrict 1 (0.5 Mile) Designed Overlay, ADA Improvements, Located on Barrington Road from ILL 176 (Liberty St) to US 12 (Rand Rd) in the Village of Wauconda in Lake County. — Executed Nov 26 New Arrow Road Construction Co. $305,686 ·
Nov 6, 2020 61G46 LakeDistrict 1 Reconstruction of Nippersink Boulevard from Oak Street to Grand Avenue in Fox Lake. — Executed Nov 26 New Copenhaver Construction, Inc. $2,722,349 ·
Nov 6, 2020 61G69 LakeDistrict 1 Traffic signal replacement and installation of adaptive signal control with flashing yellow arrows on Butterfield Road from IL 137 to Allanson Road. — Executed Nov 26 New H & H Electric Co. $2,711,130 ·
Nov 6, 2020 61G70 LakeDistrict 1 Reconstruction of Brandywyn Lane from Aptakisic Road to Prairie Road; and the reconstruction of Thompson Boulevard from Buffalo Grove Road to Welland Road in Buffalo Grove. — Executed Nov 26 New A Lamp Concrete Contractors, Inc. $4,849,825 ·
Nov 6, 2020 62L24 LakeDistrict 1 (4.12-Mile) SMART overlay and ADA improvements on US 12 from north of Old Rand Rd. to south of IL 22 located in the Villages of Lake Zurich and North Barrington. — Executed Nov 26 New Peter Baker & Son Co. $3,247,000 ·
Nov 6, 2020 62N01 LakeDistrict 1 Cleaning(sweeping) various arterial highways in District One throughout Lake County. — Active Nov 26 New Illinois Central Sweeping LLC $697,950 ·
Jan 15, 2021 61F89 LakeDistrict 1 Construction of a pedestrian bridge over the Wisconsin Central Railroad at the Mundelein Metra Station in the Village of Mundelein. — Executed Nov 26 New Dunnet Bay Construction Company $3,915,764 ·
Jan 15, 2021 61G84 LakeDistrict 1 Replace the bridge carrying Clavey Road over Skokie Ditch, and the reconstruction of the roadway from east of US 41 to Green Bay Road in Highland. — Executed Nov 26 New Copenhaver Construction, Inc. $5,485,767 ·
Jan 15, 2021 62K93 LakeMcHenryDistrict 1 ADA improvement project along various State maintained routes. Located in the City of Zion and Villages of Richmond, Winthrop Harbor, Fox Lake, Lake Villa and Grayslake. — Executed Nov 26 New Triggi Construction, Inc. $414,718 ·
Jan 15, 2021 62L03 LakeDistrict 1 Pavement patching, micro-surfacing, sidewalk ramps improvements, curb Gutter replacement in the village of Ant (5.660-Mile) Improvement on IL-173 (Rosecrans Road) from Mc Henry Co. Line to west of Lake Ave. and Orchard Street to Madison Ave. consists of pavement patching, micro-surfacing, sidewalk ramps improvements, curb Gutter replacement in the village of Antioch, Antioch Township. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $2,665,776 ·
Jan 15, 2021 62L38 LakeMcHenryDistrict 1 ADA improvements on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will, Southern Lake and McHenry Counties. Located in the City of Crystal Lake and Villages of Barrington and Wauconda. — Executed Nov 26 New Triggi Construction, Inc. $315,664 ·
Jan 15, 2021 62L39 LakeDistrict 1 ADA improvement project along various State maintained routes within Eastern Lake County. Located in the Cities of Waukegan, Park City, North Chicago and Villages of Mundelein and Libertyville. — Executed Nov 26 New Triggi Construction, Inc. $555,908 ·
Jan 15, 2021 62L44 LakeDistrict 1 Cleaning and sealing longitudinal joints and cracks of the existing concrete pavement from Riverwoods Blvd to US 41 (Skokie Hwy) pavement markings restriping in the Villages of Mettawa and Lake Forest, Libertyville, Shields, Vernon and Deerfield Townships. — Executed Nov 26 New SKC Construction, Inc. $132,327 ·
Jan 15, 2021 62L49 LakeDistrict 1 Sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages of Lakemo (2.578-Mile) Improvement on IL-120 (Belvidere Road) from McHenry Co. Line to East of IL-60 consist of sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages of Lakemoor, Round Lake, and Volo, Wauconda Township. — Executed Nov 26 New Freehill Asphalt, Inc. $117,389 ·
1–100 of 236Next ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.