Filtered by: County: Lake Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Jan 19, 2018 | 61E13 | LakeDistrict 1 | Resurfacing 21st Street from Sheridan Road east for 1,600 ft., and 29th Street from Lewis Avenue to Galilee Avenue in the City of Zion. | — | Executed | Peter Baker & Son Co. $456,777 · | ||
| Jan 19, 2018 | 61E28 | LakeDistrict 1 | Replace the bridge carrying Forest Avenue over Ravine Ditch #7, south of Hazel Avenue in the City of Highland Park. | — | Executed | Lorig Construction Company $2,655,120 · | ||
| Jan 19, 2018 | 61E33 | LakeDistrict 1 | Traffic signal improvement on US 12 from IL 176 to IL 22. | — | Executed | Home Towne Electric, Inc. $898,265 · | ||
| Mar 9, 2018 | 60X51 | LakeDistrict 1 | Remove and replace the bridge carrying westbound US 12 over southbound IL 59 in the village of Fox Lake. | — | Executed | Areatha Construction Co., Inc. $2,853,198 · | ||
| Mar 9, 2018 | 61E38 | LakeDistrict 1 | Resurfacing from Fairfield Road to Gilmer Road in the Village of Hawthorn Woods. | — | Executed | Peter Baker & Son Co. $430,262 · | ||
| Apr 27, 2018 | 60T75 | LakeDistrict 1 | Reconstruct US 45 on a new alignment and re-align Grass Lake Road to create a four-legged intersection with US 45 and Millburn Road in the Villages of Old Mill Creek and Lindenhurst. | — | Executed | Berger Excavating Contractors, Inc. $15,577,444 · | ||
| Apr 27, 2018 | 60Y83 | LakeDistrict 1 | Resurfacing, pedestrian ramps and drainage work in the villages of Island Lake and Wauconda. | — | Executed | Lorig Construction Company $1,105,951 · | ||
| Apr 27, 2018 | 61C48 | LakeDistrict 1 | Reconstruction, drainage improvements, and bike/pedestrian path construction on Sayton Road from US 12 to Rollins Road, and from Rollins Road to Industrial Avenue in the Village of Fox Lake. | — | Executed | Berger Excavating Contractors, Inc. $1,769,565 · | ||
| Apr 27, 2018 | 61E22 | LakeDistrict 1 | Reconstruction and widening to add one thru lane in each direction and bicycle/pedestrian accommodations on Quentin Road from IL 22 to White Pine Road. | — | Executed | Lake County Grading Company, LLC $20,129,203 · | ||
| Apr 27, 2018 | 61E59 | LakeDistrict 1 | Resurfacing Golf Road from Butterfield road to Milwaukee Avenue in the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $1,240,026 · | ||
| Apr 27, 2018 | 61E66 | LakeDistrict 1 | Construction of a multi-use path adjacent to Molidor Road, from 0.5 mile west of Fish Lake Road to Fish Lake Road in Grant Township. | — | Executed | Campanella and Sons, Inc. $313,595 · | ||
| Apr 27, 2018 | 61E70 | LakeDistrict 1 | Sidewalk construction algon Clavey Road from Barberry Road to the Skokie Valley Bike Path in the City of Highland Park. | — | Executed | Sumit Construction Co., Inc. $54,111 · | ||
| Apr 27, 2018 | 62A14 | LakeDistrict 1 | ADA ramp improvement on various routes in the villages of Deerfield and Lake Bluff and the cities of Highland park and Lake Forest. | — | Executed | Sumit Construction Co., Inc. $539,989 · | ||
| Apr 27, 2018 | 62B84 | LakeDistrict 1 | Repair culvert carrying IL 22 over East Tributary to Flint Creek, 1.2 miles West of IL 59. | — | Executed | D. Construction, Inc. $360,217 · | ||
| Apr 27, 2018 | 62C75 | LakeDistrict 1 | Resurfacing IL 132 through the villages of Lake Villa and Lindenhurst. | — | Executed | Peter Baker & Son Co. $825,294 · | ||
| Apr 27, 2018 | 62D19 | LakeDistrict 1 | Resurfacing and pedestrian ramp improvement on US 14 through the Village of Barrington. | — | Executed | Lorig Construction Company $1,371,351 · | ||
| Apr 27, 2018 | 62F26 | LakeDistrict 1 | Resurfacing on IL 132 in the villages of Gurnee and Lake Villa. | — | Executed | Payne & Dolan, Inc. $4,732,733 · | ||
| Apr 27, 2018 | 62F34 | LakeDistrict 1 | Joint and deck repairs on bridge SN 049-0170 carrying IL 137 over US 45 in the Village of Libertyville. | — | Executed | MYS, Incorporated $347,791 · | ||
| Apr 27, 2018 | 62F55 | LakeDistrict 1 | Resurfacing and shoulder improvement on IL 120 in the villages of Grayslake, Gurnee, Libertyville and the city of Waukegan. | — | Executed | Peter Baker & Son Co. $4,847,258 · | ||
| Jun 15, 2018 | 60V55 | LakeDistrict 1 | Widening, resurfacing and traffic signal modernization in the Village of Lindenhurst. | — | Executed | Berger Excavating Contractors, Inc. $14,793,279 · | ||
| Jun 15, 2018 | 61E76 | LakeDistrict 1 | Resurfacing, sidewalk replacement, curb and gutter replacement on FAU Rute 2758 (Moffett Road) from Sheridan Road to Center Avenue in the Village of Lake Bluff . | — | Executed | Berger Excavating Contractors, Inc. $1,066,253 · | ||
| Jun 15, 2018 | 61E81 | LakeDistrict 1 | Sidewalk construction at various locations in the Village of Lake Zurich. | — | Executed | Copenhaver Construction, Inc. $149,994 · | ||
| Jun 15, 2018 | 61E83 | LakeDistrict 1 | Resurfacing Volo Village Road from Belvidere Road (IL 12) to Rand Road (US 12) in the Village of Volo | — | Executed | Peter Baker & Son Co. $233,612 · | ||
| Jun 15, 2018 | 62B61 | LakeDistrict 1 | Channelization on IL 53, from Long Grove Drive to Middlesax Drive in the village of Long Grove. | — | Executed | Berger Excavating Contractors, Inc. $1,800,000 · | ||
| Jun 15, 2018 | 62C74 | LakeDistrict 1 | 3.632 miles of resurfacing and pedestrain ramp improvments on IL 132 in Gurnee and Waukegan. | — | Executed | Peter Baker & Son Co. $4,377,353 · | ||
| Aug 3, 2018 | 60Y22 | LakeMcHenryDistrict 1 | Intersection improvement with retaining wall and traffic signal modernization on IL 176 at Roberts Road in Island Lake. | — | Executed | Alliance Contractors, Inc. $1,138,109 · | ||
| Aug 3, 2018 | 61E17 | LakeDistrict 1 | Construct a pedestrian patch adjacent to Maple Avenue, from Midlothian Road to Lake Street in the Village of Mundelein. | — | Executed | A Lamp Concrete Contractors, Inc. $2,639,771 · | ||
| Aug 3, 2018 | 62G44 | LakeDistrict 1 | Demolition of 5 single family residences at various locations near US 14 and the Canadian National Railway in the the village of Barrington. | — | Executed | Copenhaver Construction, Inc. $311,742 · | ||
| Nov 9, 2018 | 60R79 | LakeDistrict 1 | Bridge deck overlay and bridge joint repairs at two structures carrying US 12 over Nippersink Lake Channel and over Pistkee Lake Channel. | — | Executed | Lorig Construction Company $2,241,247 · | ||
| Nov 9, 2018 | 62D35 | LakeDistrict 1 | Drainage improvements along IL 59 and IL 22 in the village of North Barrington. Includes storm sewer, culvert lining and partial culvert barrel replacement. | — | Executed | Martam Construction Incorporated $889,433 · | ||
| Jan 18, 2019 | 46481 | LakeDistrict 1 | Removing reflectors, placing new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings within the limits shown. | — | Executed | Superior Road Striping, Inc. $278,325 · | ||
| Jan 18, 2019 | 61F33 | LakeDistrict 1 | Pavement reconstruction, construction of a shared use path, and lighting improvements on 14th Street from Green Bay Road to Sheridan Road in North Chicago. | — | Executed | Berger Excavating Contractors, Inc. $16,525,114 · | ||
| Jan 18, 2019 | 62C77 | LakeDistrict 1 | Resurfacing on US 41 (Skokie Hwy) from 1000 feet north of IL 176 (Rockland Rd) to 100 feet north of IL 120 (Belvidere Rd.). | — | Executed | Peter Baker & Son Co. $6,097,098 · | ||
| Jan 18, 2019 | 62F48 | LakeDistrict 1 | Resurfacing, pedestrian ramp improvement, and culvert repair on US 41 from Park Ave. West to Il 176 (Rockland Rd.); and on IL 22 from Tennyson Lane to US 41. 8.29 miles. | — | Executed | Peter Baker & Son Co. and Plote Construction, Inc JV $13,226,577 · | ||
| Jan 18, 2019 | 62G87 | CookLakeMcHenryDistrict 1 | Cleaning and painting existing steel on structures. IL 137 over US 45, IL 31 over UPRR, and Green Bay Road over North Shore Channel. | — | Executed | Eagle Painting & Maintenance Company, Inc. $302,850 · | ||
| Jan 18, 2019 | 62H31 | CookLakeDistrict 1 | Crack and joint sealing on US 12 (Rand Rd.) from Ela Road to IL 58 (Golf Rd.) | — | Executed | Freehill Asphalt, Inc. $451,265 · | ||
| Mar 8, 2019 | 60R68 | LakeDistrict 1 | Bridge deck scarification and latex concrete overlay, retrofitting bridge parapets, and reconstruction of transverse bridge joints to IL 43 over IL 120. | — | Executed | Areatha Construction Co., Inc. $1,777,994 · | ||
| Mar 8, 2019 | 61F47 | LakeDistrict 1 | Resurfacing Greenwood Avenue from Wilmot Road to Waukegan Road in Deerfield. | — | Executed | A Lamp Concrete Contractors, Inc. $1,668,129 · | ||
| Mar 8, 2019 | 62D38 | LakeDistrict 1 | Remove and replace original section of the culvert (approximately 40 ft) in the center portion of the culvert carrying IL 21 (Milwaukee Ave.) over a ditch in the village of Vernon Hills (SN 049-0599) | — | Executed | Martam Construction Incorporated $377,924 · | ||
| Mar 8, 2019 | 62G58 | LakeDistrict 1 | 2 miles of resurfacing on IL 137 (Amstutz Expressway) from IL 120 (Belvidere Street) to just south of IL 137 (Greenwood Avenue) in the City of Waukegan. | — | Executed | J. A. Johnson Paving Company $2,327,169 · | ||
| Mar 8, 2019 | 62G90 | LakeDistrict 1 | Sheet pile retaining wall and parking improvement at Illinois Beach State Park | — | Executed | Alliance Contractors, Inc. $953,418 · | ||
| Mar 8, 2019 | 62H39 | LakeDistrict 1 | Demolition of a single-family home in Mundelein and an auto repair building in Grayslake. | — | Executed | Lima Contractors $158,946 · | ||
| Apr 26, 2019 | 61E24 | LakeDistrict 1 | Pavement reconstruction, sidewalks, HMA pedestrian path, box culvert, water main relacation, traffic signal and street lighting on Weiland Road from Deerfield Parkway to Lake Cook Road. | — | Executed | Lake County Grading Company, LLC $12,090,770 · | ||
| Apr 26, 2019 | 61F65 | LakeDistrict 1 | Reconstruction of Orchard Lane from Monaville Road to Rollins Road, and resurfacing of Hook Lane from Orchard Lane to Rollins Road in the Village of Round Lake Beach. | — | Executed | Campanella and Sons, Inc. $5,231,811 · | ||
| Apr 26, 2019 | 61F69 | LakeDistrict 1 | Resurfacing Grand Avenue from Nippersink Boulevard to Illinois Route 59 in the Village of Fox Lake. | — | Executed | Peter Baker & Son Co. $1,287,252 · | ||
| Apr 26, 2019 | 61F75 | LakeDistrict 1 | Roadway reconstruction on Rockland Road from IL 21 to the Des Plaines River in Libertyville. | — | Executed | Copenhaver Construction, Inc. $6,139,354 · | ||
| Apr 26, 2019 | 62C01 | LakeDistrict 1 | 1.433 miles of 3P resurfacing and milled rumble strips on US 41 from IL 120 to Dorchester Avenue in Parck City and Gurnee. | — | Executed | Peter Baker & Son Co. $3,628,516 · | ||
| Apr 26, 2019 | 62G96 | LakeDistrict 1 | 0.947 mile of 3P resurfacing and overlaying including pedestrian curb improvements on US 41 from Lake-Cook Road to south of Chantilly Boulevard in Highland Park. | — | Executed | Plote Construction, Inc. $2,694,455 · | ||
| Apr 26, 2019 | 62H28 | LakeDistrict 1 | Routing, cleaning and sealing longitudinal cracks on IL 137 from IL 83 to O'Plaine Road in Libertyville and Green Oaks. | — | Executed | SKC Construction, Inc. $254,148 · | ||
| Apr 26, 2019 | 62H29 | CookLakeDistrict 1 | A total of 10.2 miles of routing, cleaning, and sealing of longitudinal cracks at 3 locations on IL 21/US 45 in Niles, Glenview, Vernon Hills, Libertyville and Gurnee. | — | Executed | Denler, Inc. $525,544 · | ||
| Apr 26, 2019 | 62H36 | LakeDistrict 1 | 1.9 miles of resurfacing, pedestrian ramp improvements and culvert repairs on US 41 from West Park Avenue to Chantilly Boulevard in the City of Highland Park. | — | Executed | Peter Baker & Son Co. and Plote Construction, Inc JV $5,321,788 · | ||
| Apr 26, 2019 | 62H81 | LakeDistrict 1 | 1.9 miles of ultra thin wearing course and ADA upgrades on US 41 from Ferndale Street to IL 21 in the Village of Gurnee. | — | Rejected | |||
| Jun 14, 2019 | 46507 | LakeWillDistrict 1 | Apply water borne, lead free, white and yellow paint pavement marking lines, 4, 6, and 8 inches in width in Lake and Will counties. | — | Executed | STF, LLC d/b/a Traffic Control Company $593,000 · | ||
| Jun 14, 2019 | 62B75 | LakeDistrict 1 | Intersection reconstruction at IL 131 and Kenosha Road in the Village of Beach Park. | — | Executed | Campanella and Sons, Inc. $3,348,311 · | ||
| Jun 14, 2019 | 62G30 | LakeDistrict 1 | 3.1 miles of resurfacing on IL 22 from N. Quentin Road to IL 83 in the Villages of Kildeer and Long Grove. | — | Executed | Builders Paving, LLC $1,698,888 · | ||
| Jun 14, 2019 | 62G83 | LakeDistrict 1 | 1.9 miles of resurfacing, shoulders, milled rumble strips, ADA ramps and pedestrian traffic signals at 2 locations in Gurnee, Livertyville, Waukegan and Park City: 1) IL 120 from east of I-94 to IL 43; 2)IL 21 at Red Top Drive. | — | Executed | Peter Baker & Son Co. $2,893,697 · | ||
| Jun 14, 2019 | 62H10 | LakeMcHenryDistrict 1 | Guardrail improvements at varous locations in McHenry and Lake Counties. | — | Executed | Kujo, Inc. $655,072 · | ||
| Jun 14, 2019 | 62H18 | LakeDistrict 1 | Culvert wing wall replacement on IL 120 just west of IL 83 in Grayslake. | — | Executed | Meru Corporation $147,965 · | ||
| Jun 14, 2019 | 62H88 | LakeDistrict 1 | Demolition and site clean-up of three single-family residences on IL 22 between Quentin Road and west of IL 83 in Long Grove and Kildeer. | — | Executed | McDonagh Demolition, Inc. $122,288 · | ||
| Jun 14, 2019 | 62J14 | LakeMcHenryDistrict 1 | Intermittent resurfacing on various routes in Lake and McHenry counties. | — | Executed | J. A. Johnson Paving Company $1,964,700 · | ||
| Jul 12, 2019 | 62H92 | LakeDistrict 1 | 1.8 miles of resurfacing and pedestrian ramp improvements along US 45 from Lake Woodlawn Dr. to IL RTE 83 in Mundelein. | — | Executed | Builders Paving, LLC $2,634,888 · | ||
| Jul 12, 2019 | 62H95 | LakeDistrict 1 | 3.56 miles of standard overlay and pedestrian ramp upgrades on IL-176 from Hilltop Terrace to De Webb Blvd. and on IL 60/83 from IL-176 to CN Railroad in Mundelein. | — | Executed | Arrow Road Construction Co. $2,064,157 · | ||
| Jul 12, 2019 | 62J03 | LakeDistrict 1 | 0.98 miles of designed overlay and pedestrian ramp improvements on IL 43 from McGaw Road / Pulaski Road to US 41 in Park City and Waukegan. | — | Executed | Peter Baker & Son Co. $1,997,757 · | ||
| Aug 2, 2019 | 62H91 | LakeDistrict 1 | Drain tile repair project, includes replacement of 18" clay pipe with 24" reinforced concrete pipe in unincorporated Avon Township on IL 120, just east of Wilson Road | — | Executed | Lion Construction 1, LLC $497,411 · | ||
| Sep 20, 2019 | 61D65 | LakeDistrict 1 | Reconstruct the intersection of Hart Road at US Route 14 in the Villages of Barrington and Barrington Hills. | — | Executed | Plote Construction, Inc. $7,965,000 · | ||
| Sep 20, 2019 | 61F25 | LakeDistrict 1 | Pavement reconstruction and the construction of a HMA pedestrian path next to Weiland Road from Aptakisic Road to Deerfield Parkway, and on Aptakistic Road from Joseph Court to Industrial Drive in the villages of Buffalo Grove and Lincolnshire. | — | Executed | Berger Excavating Contractors, Inc. $12,469,513 · | ||
| Sep 20, 2019 | 61G00 | LakeDistrict 1 | Reconstruction and resurfacing Rockland Road from east of the Des Plaines River bridge to St. Mary's Road, located in Libertyville Township, Lake County. | — | Executed | Berger Excavating Contractors, Inc. $1,964,385 · | ||
| Nov 8, 2019 | 61F63 | LakeDistrict 1 | Construction of HMA path on Riverwoods Road between Daniel Wright School and Whytegate Park and construction of a sidewalk along Westminster Way from the CDW Path west for 0.07 miles, located in the Village of Lincolnshire. | — | Executed | Chicagoland Paving Contractors, Inc. $270,000 · | ||
| Jan 17, 2020 | 62J05 | LakeDistrict 1 | Traffic signal modernization that includes going protected on for the NB/SB left turns and pedestrian improvements at the intersection of Il Rte 131 at IL Rte 120 in Waukegan. | — | Executed | Home Towne Electric, Inc. $269,491 · | ||
| Jan 17, 2020 | 62K39 | CookLakeDistrict 1 | Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (S The improvement consists of Litter/Debris Removal from the edge of the pavement to the pedestrian Barrier I-94 (Edens Expressway)/US 41 (Skokie Hwy) expressway from Clavey Rd to I-90 (Kennedy Expwy). 147 miles in length. | — | Rejected | Sewer Rat Contractors, LLC $211,200 · | ||
| Mar 6, 2020 | 61G31 | LakeDistrict 1 | Roadway reconstruction on Thompson Boulevard from Brandywyn Lane to Buffalo Grove Road, and on Brandywyn Lane from Thompson Blvd. to Aptakisic Road in Buffalo Grove. | — | Executed | A Lamp Concrete Contractors, Inc. $3,224,076 · | ||
| Mar 6, 2020 | 62G86 | LakeDistrict 1 | Cleaning and painting designated steel surfaces of bridge structures carrying IL 120 (Belvidere Rd) over Greenleaf St and CPRR in Gurnee, Waukegan, and Park City. | — | Executed | Eagle Painting & Maintenance Company, Inc. $498,300 · | ||
| Mar 6, 2020 | 62J99 | LakeDistrict 1 | 2.6 miles of designed overlay, new shoulders and pedestrian ramp improvements on IL 176 from Crescent Knoll Drive to west of US 41 in the Village of Libertyville. | — | Executed | Peter Baker & Son Co. $3,498,734 · | ||
| Mar 6, 2020 | 62K17 | LakeDistrict 1 | Demolition of one commercial structure and one single-family residence at various locations near US 14 and CN Railroad in the Village of Barrington. | — | Executed | Copenhaver Construction, Inc. $237,435 · | ||
| Jun 12, 2020 | 46545 | LakeDistrict 1 | Removing reflectors, new reflectors, removing damaged raised reflective pavement marker castings and placing new raised pavement marker castings. | — | Executed | Superior Road Striping, Inc. $651,102 · | ||
| Jun 12, 2020 | 61G47 | LakeDistrict 1 | Traffic Signal modifications, installation of fiber optic communication system, sidewalk replacement and pavment markings at various locations in Waukegan. | — | Executed | Home Towne Electric, Inc. $1,395,602 · | ||
| Jun 12, 2020 | 61G49 | LakeDistrict 1 | Installation of snow-proof lens cover for red signal indications. | — | Executed | Meade Inc. $627,708 · | ||
| Jun 12, 2020 | 62J92 | LakeDistrict 1 | (3.10 Mile) Overlay, pedestrian ramp new HMA Shoulders on IL- 173 Shoulders on IL- 173 from Green Bay Rd to Sheridan Rd . Drainage improvement between Hebron Ave. and Galilee Ave. in the City of Zion. | — | Executed | J. A. Johnson Paving Company $2,870,188 · | ||
| Jun 12, 2020 | 62K19 | LakeDistrict 1 | (0.019MI) Bridge superstructure repair over Flint Creek Tributary. Located in the Village of Barrington on US 14. SN 049-0003. | — | Executed | Alliance Contractors, Inc. $264,114 · | ||
| Jul 31, 2020 | 61G65 | LakeDistrict 1 | Construction of a shared-use path from the Raven Glen Forest Preserve to the Ethel's Woods Forest Preserve, and construction of a US 45 pedestrian underpass in Antioch. | — | Executed | Campanella and Sons, Inc. $3,315,373 · | ||
| Jul 31, 2020 | 62J06 | LakeDistrict 1 | Traffic Signal Modernization at the intersection of IL 131 (Green Bay Rd) and Audrey Nixon Blvd / Casimir Pulaski Dr in North Chicago, Lake County. | — | Executed | Home Towne Electric, Inc. $259,097 · | ||
| Jul 31, 2020 | 62J32 | LakeDistrict 1 | (6.452 Mile) Standard overlay and new HMA shoulders on IL 60/83 from IL 120 (Belvidere Rd) to IL 176. Located within the Villages of Volo, Ivanhoe, Round Lake Park. | — | Executed | Peter Baker & Son Co. $3,563,637 · | ||
| Sep 18, 2020 | 60V06 | LakeDistrict 1 | Precast concrete pavement and class B concrete patches along IL 83, approximately 419 ft E of the center line of N Buffalo Grove Rd and approximately 29833 ft NE to US 45. | — | Executed | R. W. Dunteman Company $1,738,700 · | ||
| Sep 18, 2020 | 61F90 | LakeDistrict 1 | Sidewalk construction at various locations in Lake Villa. | — | Executed | Electric Conduit Construction $388,937 · | ||
| Sep 18, 2020 | 62B65 | LakeDistrict 1 | US 41 @ Deerpath Rd-PS#38. New pump station 38 in the SW quadrant of Deerpath Rd. @ Ahwahnee Ln., decommissioning existing pump station at bridge abutement (SN 049-0033). 2 detention ponds in Lake Forest golf course, 2 new ret. walls, resurfacing, drainage repairs (0.49 miles) | — | Executed | Berger Excavating Contractors, Inc. $12,127,335 · | ||
| Sep 18, 2020 | 62K94 | LakeDistrict 1 | Weigh Station Repairs (remove and replace scales, steel beam support and deck platform, repairs to the pit walls and replacement of approach pavements. Location: Northbound Wasdworth Weigh Station in Wadsworth, Lake County. | — | Executed | Alliance Contractors, Inc. $328,144 · | ||
| Sep 18, 2020 | 62L13 | LakeDistrict 1 | (0.5 Mile) Designed Overlay, ADA Improvements, Located on Barrington Road from ILL 176 (Liberty St) to US 12 (Rand Rd) in the Village of Wauconda in Lake County. | — | Executed | Arrow Road Construction Co. $305,686 · | ||
| Nov 6, 2020 | 61G46 | LakeDistrict 1 | Reconstruction of Nippersink Boulevard from Oak Street to Grand Avenue in Fox Lake. | — | Executed | Copenhaver Construction, Inc. $2,722,349 · | ||
| Nov 6, 2020 | 61G69 | LakeDistrict 1 | Traffic signal replacement and installation of adaptive signal control with flashing yellow arrows on Butterfield Road from IL 137 to Allanson Road. | — | Executed | H & H Electric Co. $2,711,130 · | ||
| Nov 6, 2020 | 61G70 | LakeDistrict 1 | Reconstruction of Brandywyn Lane from Aptakisic Road to Prairie Road; and the reconstruction of Thompson Boulevard from Buffalo Grove Road to Welland Road in Buffalo Grove. | — | Executed | A Lamp Concrete Contractors, Inc. $4,849,825 · | ||
| Nov 6, 2020 | 62L24 | LakeDistrict 1 | (4.12-Mile) SMART overlay and ADA improvements on US 12 from north of Old Rand Rd. to south of IL 22 located in the Villages of Lake Zurich and North Barrington. | — | Executed | Peter Baker & Son Co. $3,247,000 · | ||
| Nov 6, 2020 | 62N01 | LakeDistrict 1 | Cleaning(sweeping) various arterial highways in District One throughout Lake County. | — | Active | Illinois Central Sweeping LLC $697,950 · | ||
| Jan 15, 2021 | 61F89 | LakeDistrict 1 | Construction of a pedestrian bridge over the Wisconsin Central Railroad at the Mundelein Metra Station in the Village of Mundelein. | — | Executed | Dunnet Bay Construction Company $3,915,764 · | ||
| Jan 15, 2021 | 61G84 | LakeDistrict 1 | Replace the bridge carrying Clavey Road over Skokie Ditch, and the reconstruction of the roadway from east of US 41 to Green Bay Road in Highland. | — | Executed | Copenhaver Construction, Inc. $5,485,767 · | ||
| Jan 15, 2021 | 62K93 | LakeMcHenryDistrict 1 | ADA improvement project along various State maintained routes. Located in the City of Zion and Villages of Richmond, Winthrop Harbor, Fox Lake, Lake Villa and Grayslake. | — | Executed | Triggi Construction, Inc. $414,718 · | ||
| Jan 15, 2021 | 62L03 | LakeDistrict 1 | Pavement patching, micro-surfacing, sidewalk ramps improvements, curb Gutter replacement in the village of Ant (5.660-Mile) Improvement on IL-173 (Rosecrans Road) from Mc Henry Co. Line to west of Lake Ave. and Orchard Street to Madison Ave. consists of pavement patching, micro-surfacing, sidewalk ramps improvements, curb Gutter replacement in the village of Antioch, Antioch Township. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $2,665,776 · | ||
| Jan 15, 2021 | 62L38 | LakeMcHenryDistrict 1 | ADA improvements on IL 171 from 19th St to Maryknoll Dr in the City of Lockport in Will, Southern Lake and McHenry Counties. Located in the City of Crystal Lake and Villages of Barrington and Wauconda. | — | Executed | Triggi Construction, Inc. $315,664 · | ||
| Jan 15, 2021 | 62L39 | LakeDistrict 1 | ADA improvement project along various State maintained routes within Eastern Lake County. Located in the Cities of Waukegan, Park City, North Chicago and Villages of Mundelein and Libertyville. | — | Executed | Triggi Construction, Inc. $555,908 · | ||
| Jan 15, 2021 | 62L44 | LakeDistrict 1 | Cleaning and sealing longitudinal joints and cracks of the existing concrete pavement from Riverwoods Blvd to US 41 (Skokie Hwy) pavement markings restriping in the Villages of Mettawa and Lake Forest, Libertyville, Shields, Vernon and Deerfield Townships. | — | Executed | SKC Construction, Inc. $132,327 · | ||
| Jan 15, 2021 | 62L49 | LakeDistrict 1 | Sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages of Lakemo (2.578-Mile) Improvement on IL-120 (Belvidere Road) from McHenry Co. Line to East of IL-60 consist of sealing cracks and joints in the existing concrete pavement, restriping pavement marking in Villages of Lakemoor, Round Lake, and Volo, Wauconda Township. | — | Executed | Freehill Asphalt, Inc. $117,389 · |
1–100 of 236Next ›
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.