Filtered by: County: Fulton Clear all
| Let date | Contract / PPS | County / Division | Highway | Description | Estimate | Status | Low bidder | |
|---|---|---|---|---|---|---|---|---|
| Mar 9, 2018 | 68D94 | FultonMcDonoughDistrict 4 | 26 miles of microsurfacing and cape seal at 4 locations on US 24, IL 100 and US 136. | — | Executed | A. C. Pavement Striping Co. $1,684,358 · | ||
| Aug 3, 2018 | 68E09 | FultonDistrict 4 | Replace 4' X 6' culvert and repair slope on IL route 97, 2.5 miles south of Cuba. | — | Executed | Lee Hood d/b/a Hood Demolition & Excavation $342,404 · | ||
| Aug 3, 2018 | 68E57 | FultonMcDonoughDistrict 4 | Partial depth patching on IL 41 from Avon city limits north to IL 9. | — | Rejected | Gunther Construction, a div of UCM, Inc. $418,027 · | ||
| Jan 18, 2019 | 68A91 | FultonDistrict 4 | Resurfacing on US 24 from Maple St. in Lewistown to Little America, and on IL 97 from US 24 to North Clark Rd. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $3,428,793 · | ||
| Jun 14, 2019 | 68D45 | FultonDistrict 4 | 2400' OF SLOPE AND TOE REPAIR ALONG THE EAST SIDE OF IL 78/IL 97 N OF DICKSON MOUNDS RD. THE PROJECT ALSO INCLUDES THE RECONSTRUCTION OF THE SHOULDER AND INSTALLATION OF GUARDRAIL. | — | Executed | Illinois Civil Contractors, Inc. $865,314 · | ||
| Jun 14, 2019 | 89715 | FultonDistrict 4 | Install ornamental lighting, sidewalks, curb and gutter, storm sewers, pavement milling, resurfacing and markings on IL 116/78 from Main Street to Lightfoot Road in Farmington. | — | Executed | Otto Baum Company, Inc. $1,756,231 · | ||
| Jun 14, 2019 | 89742 | FultonDistrict 4 | Processing modified soils, HMA resurfacing, aggregate shoulders, pipe culverts and pavement markings on CH 2 from Airport Road to the BSNF Railroad crossing. | — | Executed | Gunther Construction, a div of UCM, Inc. $1,105,754 · | ||
| Jan 17, 2020 | 68C64 | FultonDistrict 4 | 0.535 mile of milling and resurfacing and replacement of culvert on IL Rte 41 over Gallett Creek 1.0 mile E of Prairie City. | — | Rejected | Gunther Construction, a div of UCM, Inc. $2,986,769 · | ||
| Mar 6, 2020 | 68F23 | FultonSchuylerDistrict 4 | 10.5 miles of patching, cold-in-place recycling, and resurfacing from US 136 to 0.4 mile S of the Schuyler County line. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $5,653,611 · | ||
| Apr 24, 2020 | 68953 | FultonDistrict 4 | 2.88 miles of HMA cold-in-place, milling and resurfacing along US Rte 24 in Lewistown with minor drainage work and ADA requirements. | — | Executed | Gunther Construction, a div of UCM, Inc. $2,661,940 · | ||
| Apr 24, 2020 | 68F01 | FultonDistrict 4 | 4 miles of microsurfacing on US 24 from the eastern city limits of Astoria to west of Izaak Walton Rd. | — | Executed | Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $272,635 · | ||
| Jan 15, 2021 | 68G07 | FultonPeoriaWarrenDistrict 4 | Tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, alo This project consists of tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, along US 67 north of Monmouth in Warren County, and along IL 40 between Northmoor Road and Mt. Hawley in Peoria County. | — | Executed | Homer Tree Service, Inc. $146,325 · | ||
| Mar 5, 2021 | 89765 | FultonDistrict 4 | Processing modified soil, HMA resurfacing, aggregate shoulders, box culvert extension, and the construction of a box culvert, located on CH2 from CH 14 to Airport Road. | — | Executed | Gunther Construction, a div of UCM, Inc. $2,983,349 · | ||
| Apr 23, 2021 | 89777 | FultonDistrict 4 | Replace the culvert carrying CH 15 over an unnamed tributary located 0.4 mile west of CH 38. | — | Executed | Phoenix Corporation of the Quad Cities $125,253 · | ||
| Apr 23, 2021 | 89799 | FultonDistrict 4 | Remove and replace guardrail at various locations in Fulton County. | — | Rejected | Midwest Fence Corporation $872,639 · | ||
| Jun 11, 2021 | 68D34 | FultonDistrict 4 | Replacement of existing S.N. 029-0001 carrying US 24/IL 9 over Copperas Creek, and associated roadway work. at the east end of Banner. | — | Executed | Stark Excavating, Inc. $9,110,397 · | ||
| Jun 11, 2021 | 68G14 | FultonDistrict 4 | Pavement patching on IL 9 from Big Creek to Avenue A in Canton. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $456,015 · | ||
| Sep 17, 2021 | 68G62 | FultonDistrict 4 | Intersection improvement with flashing lights and lighting upgrades in Fulton County. | — | Executed | Illinois Civil Contractors, Inc. $723,553 · | ||
| Sep 17, 2021 | 89795 | FultonDistrict 4 | Replace the bridge carrying CH 2 over Coal Creek, 4.25 miles south of London Mills. | — | Executed | Stark Excavating, Inc. $1,359,595 · | ||
| Nov 5, 2021 | 68E12 | FultonDistrict 4 | Culvert replacement with slope repair on IL Route 97, 1.0 mile North of Cuba, Fulton County. | — | Executed | Phoenix Corporation of the Quad Cities $311,555 · | ||
| Nov 18, 2022 | 89796 | FultonDistrict 4 | Replace the bridge carrying CH 2 over Otter Creek, 4 miles north of Astoria. | — | Executed | Stark Excavating, Inc. $2,199,397 · | ||
| Apr 28, 2023 | 68E54 | FultonDistrict 4 | Headwall removal and replacement, culvert ext., and slope repair at 3 locations along IL 41 from S of Avon to N of Capp Rd. | — | Executed | Phoenix Corporation of the Quad Cities $938,577 · | ||
| Jun 16, 2023 | 68H55 | FultonPeoriaDistrict 4 | Remove and replace traffic signal mast arms and posts at Ash and Vine Streets along North Main Street in Canton and at Adams and Spring Streets in Peoria in Fulton and Peoria Counties. | — | Executed | Oberlander Electric Co. $672,500 · | ||
| Jun 16, 2023 | 68H66 | FultonDistrict 4 | PCC Pavement Resurfacing of Lewistown Maintenance Yard. | — | Executed | Gensini Excavating, Inc. $316,237 · | ||
| Jan 19, 2024 | 68H94 | FultonDistrict 4 | Bridge expansion joint replacement and installation of new steel diaphragms. IL 100; 0.1 mile south of Enion. | — | Executed | County Contractors, Inc. $407,324 · | ||
| Mar 8, 2024 | 68H20 | FultonDistrict 4 | Bridge deck overlay, bridge join replacement/repair, bridge approach roadway, bridge repair to structures on IL 78/IL 97 (SN 029-0021, SN 029-0055, SN 029-0056, and SN 029-0012). | — | Executed | Laverdiere Construction, Inc. $4,618,208 · | ||
| Mar 8, 2024 | 89798 | FultonDistrict 4 | Reconstruction of CH 15 from the McDonough County Line to IL 9. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $2,628,388 · | ||
| Aug 2, 2024 | 68H92 | FultonDistrict 4 | Slope stabilization and culvert extension along US 24 east of IL 78. | — | Executed | Phoenix Corporation of the Quad Cities $473,181 · | ||
| Jan 17, 2025 | 89837 | FultonDistrict 4 | Construction of a single-span plate girder with reinforced deck to carry CH 22 over Big Creek. Work includes channel excavation and HMA resurfacing. | — | Executed | Otto Baum Company, Inc. $1,169,900 · | ||
| Mar 7, 2025 | 89860 | FultonDistrict 4 | Bituminous Surface Treatment Class A-1 on various county highways in Fulton County | — | Executed | A. C. Pavement Striping Co. $1,034,857 · | ||
| Jun 13, 2025 | 68A86 | FultonDistrict 4 | 5.3 miles of resurfacing on IL 78 from 0.1 mile south of North Clark Rd to US 136 and on US 136 from west of the IL 78 Junction Wye to east of the IL 78 Junction Wye. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $10,405,096 · | ||
| Jun 13, 2025 | 68J44 | FultonDistrict 4 | Cleaning of woody debris around SN 029-0025 carrying IL Route 95 over Spoon River in Fulton County. | — | Executed | CSD Environmental Services, Inc. $94,842 · | ||
| Aug 1, 2025 | 68J13 | FultonDistrict 4 | Bridge deck overlay, joint replacements and bridge repairs to SN 029-0007 carrying US Route 24 over BNSF RR 1 mile east of the Schuyler County Line in Fulton County. | — | Executed | Freesen, a div of UCM, Inc. $496,456 · | ||
| Aug 1, 2025 | 68J14 | FultonDistrict 4 | Bridge deck overlays on SN's 029-0057 over Coal Creek, 029-0061 over Turkey Creek, 029-0062 over Lost Grove Creek, and 029-0065 over Putt Creek in Fulton County. | — | Executed | Freesen, a div of UCM, Inc. $2,366,430 · | ||
| Jan 16, 2026 | 68F50 | FultonDistrict 4 | Bridge painting and repair on SN 063-0002, the Scott W. Lucas Memorial Bridge over the Illinois River, in Fulton County. | — | Executed | Civil Coatings and Construction Inc. $14,341,242 · | ||
| Feb 27, 2026 | 68F91 | FultonMcDonoughDistrict 4 | 6.24 miles of resurfacing from SCL of Avon to IL 9 in Fulton and McDonough Counties. | — | Executed | Gunther Construction, a div of UCM, Inc. $11,748,219 · | ||
| Feb 27, 2026 | 68J68 | FultonDistrict 4 | Resurfacing and cold-in-place recycling on Il 78 from Fort St in Farmington to 0.2 mile north of Alder St in Canton; and resurfacing on Old Il 78 from IL 78 from IL 78(N) to IL 78(S) in Norris. Approximately 7.63 miles gross. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $7,447,606 · | ||
| Apr 24, 2026 | 68K17 | FultonDistrict 4 | 9.93 miles of 3P resurfacing on US Route 24 from Izaack Walton Road to North of Rut Road in Fulton County. | — | Executed | Illinois Valley Paving, a div of UCM, Inc. $10,922,962 · | ||
| Jun 12, 2026 | 68K90 | FultonDistrict 4 | Partial depth HMA patching on US 24 and resurfacing (1,000 ft) rest area roadway in Fulton County. 0.402 mile total gross length. | — | Executed | R. A. Cullinan and Son, a div of UCM, Inc. $693,984 · | ||
| Jul 31, 2026 | 68L03 | FultonKnoxDistrict 4 | HMA patching on IL 97 from Littlers Creek to IL 116. Approximately 2.92 miles gross length. | — | Executed | Brandt Construction Co. $630,038 · |
1–40 of 40
Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.