Mar 9, 2018 68D94 FultonMcDonoughDistrict 4 26 miles of microsurfacing and cape seal at 4 locations on US 24, IL 100 and US 136. — Executed Nov 26 New A. C. Pavement Striping Co. $1,684,358 ·
Aug 3, 2018 68E09 FultonDistrict 4 Replace 4' X 6' culvert and repair slope on IL route 97, 2.5 miles south of Cuba. — Executed Nov 26 New Lee Hood d/b/a Hood Demolition & Excavation $342,404 ·
Aug 3, 2018 68E57 FultonMcDonoughDistrict 4 Partial depth patching on IL 41 from Avon city limits north to IL 9. — Rejected Nov 26 New Gunther Construction, a div of UCM, Inc. $418,027 ·
Jan 18, 2019 68A91 FultonDistrict 4 Resurfacing on US 24 from Maple St. in Lewistown to Little America, and on IL 97 from US 24 to North Clark Rd. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $3,428,793 ·
Jun 14, 2019 68D45 FultonDistrict 4 2400' OF SLOPE AND TOE REPAIR ALONG THE EAST SIDE OF IL 78/IL 97 N OF DICKSON MOUNDS RD. THE PROJECT ALSO INCLUDES THE RECONSTRUCTION OF THE SHOULDER AND INSTALLATION OF GUARDRAIL. — Executed Nov 26 New Illinois Civil Contractors, Inc. $865,314 ·
Jun 14, 2019 89715 FultonDistrict 4 Install ornamental lighting, sidewalks, curb and gutter, storm sewers, pavement milling, resurfacing and markings on IL 116/78 from Main Street to Lightfoot Road in Farmington. — Executed Nov 26 New Otto Baum Company, Inc. $1,756,231 ·
Jun 14, 2019 89742 FultonDistrict 4 Processing modified soils, HMA resurfacing, aggregate shoulders, pipe culverts and pavement markings on CH 2 from Airport Road to the BSNF Railroad crossing. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $1,105,754 ·
Jan 17, 2020 68C64 FultonDistrict 4 0.535 mile of milling and resurfacing and replacement of culvert on IL Rte 41 over Gallett Creek 1.0 mile E of Prairie City. — Rejected Nov 26 New Gunther Construction, a div of UCM, Inc. $2,986,769 ·
Mar 6, 2020 68F23 FultonSchuylerDistrict 4 10.5 miles of patching, cold-in-place recycling, and resurfacing from US 136 to 0.4 mile S of the Schuyler County line. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $5,653,611 ·
Apr 24, 2020 68953 FultonDistrict 4 2.88 miles of HMA cold-in-place, milling and resurfacing along US Rte 24 in Lewistown with minor drainage work and ADA requirements. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $2,661,940 ·
Apr 24, 2020 68F01 FultonDistrict 4 4 miles of microsurfacing on US 24 from the eastern city limits of Astoria to west of Izaak Walton Rd. — Executed Nov 26 New Microsurfacing Contractors, LLC, a Division of Byrne and Jones Holding Company $272,635 ·
Jan 15, 2021 68G07 FultonPeoriaWarrenDistrict 4 Tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, alo This project consists of tree removal and other collateral work located along US 24 at Copperas Creek near Banner in Fulton County, along US 67 north of Monmouth in Warren County, and along IL 40 between Northmoor Road and Mt. Hawley in Peoria County. — Executed Nov 26 New Homer Tree Service, Inc. $146,325 ·
Mar 5, 2021 89765 FultonDistrict 4 Processing modified soil, HMA resurfacing, aggregate shoulders, box culvert extension, and the construction of a box culvert, located on CH2 from CH 14 to Airport Road. — Executed Nov 26 New Gunther Construction, a div of UCM, Inc. $2,983,349 ·
Apr 23, 2021 89777 FultonDistrict 4 Replace the culvert carrying CH 15 over an unnamed tributary located 0.4 mile west of CH 38. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $125,253 ·
Apr 23, 2021 89799 FultonDistrict 4 Remove and replace guardrail at various locations in Fulton County. — Rejected Nov 26 New Midwest Fence Corporation $872,639 ·
Jun 11, 2021 68D34 FultonDistrict 4 Replacement of existing S.N. 029-0001 carrying US 24/IL 9 over Copperas Creek, and associated roadway work. at the east end of Banner. — Executed Nov 26 New Stark Excavating, Inc. $9,110,397 ·
Jun 11, 2021 68G14 FultonDistrict 4 Pavement patching on IL 9 from Big Creek to Avenue A in Canton. — Executed Nov 26 New R. A. Cullinan and Son, a div of UCM, Inc. $456,015 ·
Sep 17, 2021 68G62 FultonDistrict 4 Intersection improvement with flashing lights and lighting upgrades in Fulton County. — Executed Nov 26 New Illinois Civil Contractors, Inc. $723,553 ·
Sep 17, 2021 89795 FultonDistrict 4 Replace the bridge carrying CH 2 over Coal Creek, 4.25 miles south of London Mills. — Executed Nov 26 New Stark Excavating, Inc. $1,359,595 ·
Nov 5, 2021 68E12 FultonDistrict 4 Culvert replacement with slope repair on IL Route 97, 1.0 mile North of Cuba, Fulton County. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $311,555 ·
Nov 18, 2022 89796 FultonDistrict 4 Replace the bridge carrying CH 2 over Otter Creek, 4 miles north of Astoria. — Executed Nov 26 New Stark Excavating, Inc. $2,199,397 ·
Apr 28, 2023 68E54 FultonDistrict 4 Headwall removal and replacement, culvert ext., and slope repair at 3 locations along IL 41 from S of Avon to N of Capp Rd. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $938,577 ·
Jun 16, 2023 68H55 FultonPeoriaDistrict 4 Remove and replace traffic signal mast arms and posts at Ash and Vine Streets along North Main Street in Canton and at Adams and Spring Streets in Peoria in Fulton and Peoria Counties. — Executed Nov 26 New Oberlander Electric Co. $672,500 ·
Jun 16, 2023 68H66 FultonDistrict 4 PCC Pavement Resurfacing of Lewistown Maintenance Yard. — Executed Nov 26 New Gensini Excavating, Inc. $316,237 ·
Jan 19, 2024 68H94 FultonDistrict 4 Bridge expansion joint replacement and installation of new steel diaphragms. IL 100; 0.1 mile south of Enion. — Executed Nov 26 New County Contractors, Inc. $407,324 ·
Mar 8, 2024 68H20 FultonDistrict 4 Bridge deck overlay, bridge join replacement/repair, bridge approach roadway, bridge repair to structures on IL 78/IL 97 (SN 029-0021, SN 029-0055, SN 029-0056, and SN 029-0012). — Executed Nov 26 New Laverdiere Construction, Inc. $4,618,208 ·
Mar 8, 2024 89798 FultonDistrict 4 Reconstruction of CH 15 from the McDonough County Line to IL 9. — Executed Nov 26 New Illinois Valley Paving, a div of UCM, Inc. $2,628,388 ·
Aug 2, 2024 68H92 FultonDistrict 4 Slope stabilization and culvert extension along US 24 east of IL 78. — Executed Nov 26 New Phoenix Corporation of the Quad Cities $473,181 ·
Jan 17, 2025 89837 FultonDistrict 4 Construction of a single-span plate girder with reinforced deck to carry CH 22 over Big Creek. Work includes channel excavation and HMA resurfacing. — Executed Nov 25 New Otto Baum Company, Inc. $1,169,900 ·
Mar 7, 2025 89860 FultonDistrict 4 Bituminous Surface Treatment Class A-1 on various county highways in Fulton County — Executed Nov 25 New A. C. Pavement Striping Co. $1,034,857 ·
Jun 13, 2025 68A86 FultonDistrict 4 5.3 miles of resurfacing on IL 78 from 0.1 mile south of North Clark Rd to US 136 and on US 136 from west of the IL 78 Junction Wye to east of the IL 78 Junction Wye. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $10,405,096 ·
Jun 13, 2025 68J44 FultonDistrict 4 Cleaning of woody debris around SN 029-0025 carrying IL Route 95 over Spoon River in Fulton County. — Executed Nov 25 New CSD Environmental Services, Inc. $94,842 ·
Aug 1, 2025 68J13 FultonDistrict 4 Bridge deck overlay, joint replacements and bridge repairs to SN 029-0007 carrying US Route 24 over BNSF RR 1 mile east of the Schuyler County Line in Fulton County. — Executed Nov 25 New Freesen, a div of UCM, Inc. $496,456 ·
Aug 1, 2025 68J14 FultonDistrict 4 Bridge deck overlays on SN's 029-0057 over Coal Creek, 029-0061 over Turkey Creek, 029-0062 over Lost Grove Creek, and 029-0065 over Putt Creek in Fulton County. — Executed Nov 25 New Freesen, a div of UCM, Inc. $2,366,430 ·
Jan 16, 2026 68F50 FultonDistrict 4 Bridge painting and repair on SN 063-0002, the Scott W. Lucas Memorial Bridge over the Illinois River, in Fulton County. — Executed Nov 25 New Civil Coatings and Construction Inc. $14,341,242 ·
Feb 27, 2026 68F91 FultonMcDonoughDistrict 4 6.24 miles of resurfacing from SCL of Avon to IL 9 in Fulton and McDonough Counties. — Executed Nov 25 New Gunther Construction, a div of UCM, Inc. $11,748,219 ·
Feb 27, 2026 68J68 FultonDistrict 4 Resurfacing and cold-in-place recycling on Il 78 from Fort St in Farmington to 0.2 mile north of Alder St in Canton; and resurfacing on Old Il 78 from IL 78 from IL 78(N) to IL 78(S) in Norris. Approximately 7.63 miles gross. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $7,447,606 ·
Apr 24, 2026 68K17 FultonDistrict 4 9.93 miles of 3P resurfacing on US Route 24 from Izaack Walton Road to North of Rut Road in Fulton County. — Executed Nov 25 New Illinois Valley Paving, a div of UCM, Inc. $10,922,962 ·
Jun 12, 2026 68K90 FultonDistrict 4 Partial depth HMA patching on US 24 and resurfacing (1,000 ft) rest area roadway in Fulton County. 0.402 mile total gross length. — Executed Nov 25 New R. A. Cullinan and Son, a div of UCM, Inc. $693,984 ·
Jul 31, 2026 68L03 FultonKnoxDistrict 4 HMA patching on IL 97 from Littlers Creek to IL 116. Approximately 2.92 miles gross length. — Executed Nov 25 New Brandt Construction Co. $630,038 ·
1–40 of 40

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.