Let date Contract / PPS County / Division Highway Description Estimate Status Added Low bidder
Sep 19, 2025 61L70 CookDistrict 1 Sidewalk construction on Prairie Avenue from Hillside Avenue to South Street, and South Street from Summit Street to Prairie Avenue in Barrington. — Executed Nov 25 New Triggi Construction, Inc. $220,672 ·
Sep 19, 2025 61L71 CookDistrict 1 HMA resurfacing on Dee Road from Devon Avenue to the Union Pacific Railroad in Park Ridge. — Executed Nov 25 New Builders Paving, LLC $2,778,778 ·
Sep 19, 2025 61L72 CookDistrict 1 HMA Resurfacing of State Street from 127th Street to Cass Street in Lemont. Includes; ADA Ramps, curb and gutter, and drainage adjustments. — Executed Nov 25 New P. T. Ferro Construction Co. $1,092,187 ·
Sep 19, 2025 62B64 CookDistrict 1 (1,354-Ft) Intersection and ADA Improvements include pavement widening, HMA resurfacing, patching, traffic signal modernization, drainage improvements, pavement markings and landscaping. Located at Joliet Rd and Brainard Ave. in the City of Countryside in Cook County. — Executed Nov 25 New R. W. Dunteman Company $2,431,246 ·
Sep 19, 2025 62F86 CookDistrict 1 Pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps (3,542-Mile) This improvement consists of pavement patching, hot-mix asphalt surface removal, resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers, accessible pedestrian signals. Located in the Villages of Arlington Heights, Buffalo Grove, and Wheeling in Cook County. — Executed Nov 25 New
Sep 19, 2025 62L15 CookDistrict 1 (2.23-Mile) Designed Overlay and ADA Improvements consisting of asphalt surface removal, pavement patching, hot-mix asphalt resurfacing, detector loop replacement, concrete curb and gutter replacement, curb ramps for sidewalks (ADA) improvements and new thermoplastic pavement marking on Lincoln Avenue from 138th Street to IL 83 (Sibley Boulevard) within the Village of Dolton, in in Cook County. — Executed Nov 25 New D. Construction, Inc. $2,190,770 ·
Sep 19, 2025 62U11 CookWillDistrict 1 Drainage Improvements. Work includes ditch regrading, culvert replacement and other drainage improvements. Locations: US 30 between 84th Avenue and 82nd Avenue in Will County; US 52 at Draves Road and Offner Road in Will County; Intersection of 115th Street and Homan Avenue in Cook County; Intersection of Taft Avenue and Elm Avenue in Cook County; Along Palatine Road, West of Roselle Road in Cook County. — Executed Nov 25 New Everlast Blacktop Inc. $1,530,704 ·
Sep 19, 2025 62W62 CookDuPageWillDistrict 1 This work includes replacement of existing span wire mounted traffic signals with new mast arm mounted traffic signals, installation of LED signal heads, traffic signal posts and mast arms, installation of accessible pedestrian signals. Installations are various locations in District 1. — Executed Nov 25 New John Burns Construction Company $2,170,856 ·
Sep 19, 2025 62X58 CookDistrict 1 Resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement marki (4,646-Ft) The resurfacing project consists of resurfacing the existing HMA pavement with HMA surface course, HMA binder course, thermoplastic pavement markings located FAU 2916 (State Street) from Sauk Trail to Steger Road in the Villages of South Chicago Heights and Steger in Cook County. Also included is a box culvert (SN 016-1413), cleaning project consists of debris removal. The Torrence Avenue over a ditch in the Village of Sauk Village in Cook County. — Executed Nov 25 New Gallagher Asphalt Corporation $549,468 ·
Sep 19, 2025 62X84 CookDistrict 1 (2.28-Mile) Standard Overlay (1st HMA overlay of bare PCC pavement), ADA Improvements. Work includes curb and gutter removal and replacement, curb ramps for sidewalk (ADA), pedestrian signals (APS), pavement patching, PCC milling, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, pavement markings, raised reflective markers, detector loops. Location: Pershing Road, from US 34 Ogden Avenue to West of Central Avenue within the municipalities of Berwyn, Cicero, Lyons and — Rejected Nov 25 New K-Five Construction Corporation $4,154,377 ·
Sep 19, 2025 62X87 CookDistrict 1 Asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concre (3,089-Ft) Standard Overlay consists of asphalt surface removal, pavement patching, resurfacing with hot-mix asphalt binder and surface course, concrete curb and gutter removal and replacement, pedestrian curb ramps (ADA) improvements, raised reflective pavement markers, thermoplastic pavement marking. Located along Dolton Avenue from 142nd Street to I-94 (Bishop Ford Freeway) in the Village of Dolton. — Executed Nov 25 New D. Construction, Inc. $682,549 ·
Sep 19, 2025 62Y12 CookDistrict 1 (269-Ft) Bridge Preservation Project: deck overlay, joint replacement/ repair. Work includes hydroscarification, deck repairs, latex modified concrete overlay diamond grinding, structural repair of concrete, joint replacement with strip seals, relief joints cleaning, approach slab repair, concrete sealer, HMA butt joints, curb and gutter replacement, sidewalk replacement and collateral and incidental work. Location: Bridge carrying Foster Avenue over the North Shore Channel, just East of North A — Executed Nov 25 New Martam Construction Incorporated $955,094 ·
Sep 19, 2025 62Y13 CookDistrict 1 Staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge (304-Ft) Bridge Deck Overlay, Bridge Joint Replacement / Repair consists of staged construction to complete partial and full depth deck slab repair and latex overlay of existing bridge. The scope also includes sidewalk and curb and gutter removal and replacement. (Existing Structure No. 016-2672). This project is on IL 19 (Irving Park Road) at Des Plaines River in Schiller Park, IL. in Cook County. — Executed Nov 25 New Martam Construction Incorporated $966,309 ·
Nov 7, 2025 61J94 CookDistrict 1 Construct a shared-use path adjacent to Meacham Road, from IL 72 to American Lane, and adjacent to Golf Road from Meacham Road to Roosevelt Boulevard in Schaumburg. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $997,000 ·
Nov 7, 2025 61L43 CookDistrict 1 HMA resurfacing on Woodfield Road from Plum Grove Road to Meacham Road in Schaumburg. Includes; HMA full depth patching, curb and gutter, sidewalks, shared use path, traffic signal modifications, and lighting. — Executed Nov 25 New K-Five Construction Corporation $5,837,039 ·
Nov 7, 2025 61L76 CookDistrict 1 Resurfacing and pedestrian safety improvements at the intersection of 9th Ave. at Van Buren Street, and at Quiney Street in Maywood. — Executed Nov 25 New Davis Concrete Construction Co. $298,167 ·
Nov 7, 2025 61L77 CookDistrict 1 Construct PCC Sidewalks along Center Avenue from Maple Avenue to Laurel Avenue. Includes: ADA Ramps, curb and gutter, landscaping, pavement markings and driveways. — Executed Nov 25 New Triggi Construction, Inc. $359,832 ·
Nov 7, 2025 61L82 CookDistrict 1 Construction of a three-span cast-in-place RC slab bridge to carry 21st Street over Addison Creek in Broadview. Includes; full depth HMA pavement, sidewalk, curb and gutter, storm sewer, and lighting. — Executed Nov 25 New Dunnet Bay Construction Company $2,582,436 ·
Nov 7, 2025 61L92 CookDistrict 1 Rehabilitation of Devon Avenue from Lincoln Avenue to McCormick Boulevard in Lincolnwood. Includes; HMA resurfacing, curb and gutter, sidewalks, lighting, parkway ebhancements and water main. — Executed Nov 25 New Capitol Cement Co., Inc. $5,462,909 ·
Nov 7, 2025 61L98 CookDistrict 1 Reconstruction and HMA resurfacing of shoenbeck Road from US 12 to Camp McDonald Road in Mount Prospect. Includes; sidewalks, ADA ramps, pedestrian signals, driveways, storm sewers, and curb and gutter. — Executed Nov 25 New PirTano Construction Co., LLC $1,778,510 ·
Nov 7, 2025 62R63 CookDistrict 1 (2,891-Ft) Bridge Replacement Project. lighting, traffic signals and ADA improvements for structure (SN 016-0834) for I-94 (Edens Expressway) at Devon Avenue (Overhead) in the City of Chicago and the Village of Lincolnwood within Cook County. — Executed Nov 25 New Dunnet Bay Construction Company $15,646,955 ·
Nov 7, 2025 62U41 CookDistrict 1 (481-Ft) Bridge Replacement Project, bridge approach slab replacement for Structure Number (016-2068), lighting, traffic signal modernization, ADA improvement, resurfacing, I-290 at Keeler Avenue. — Executed Nov 25 New Lorig Construction Company $22,596,336 ·
Nov 7, 2025 80B53 CookDistrict 1 A full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenso This improvement consists of a full bridge painting and cleaning for the BNSF Bridges (SN 016-0020) and (SN 016-0021) over FAI 55 (Stevenson Expressway) in the City of Chicago and Cook County. — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $1,180,528 ·
Nov 7, 2025 80B69 CookDistrict 1 Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of lim The project consists of Full Arterial Cleaning Cycle, Supplemental Sweeping including pickup, removal and satisfactory disposal of limbs, sticks, leaves, stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter on various State maintained arterial routes located within the northern half of Cook County. — Executed Nov 25 New Berger Excavating Contractors, Inc. d/b/a Berger Contractors, Inc. $4,622,500 ·
Nov 7, 2025 80B71 CookDistrict 1 Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of lim This project consists of Arterial Cleaning, Supplemental Sweeping shall consist of the pickup, removal and satisfactory disposal of limbs, sticks, leaves, sand stones, dirt, weeds, debris, deceased animal carcasses, refuse, litter and any other rubbish which has accumulated on the highway areas located on various State maintained arterial routes located within southern half of Cook County. — Executed Nov 25 New Central Sweeping of Illinois, LLC $4,010,755 ·
Nov 7, 2025 80B73 CookDistrict 1 GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on The project consists of GRAFFITI REMOVAL and shall consist of removing graffiti from the surfaces on State DOT right of way located on the inbound and outbound mainlines and ramps of the Kennedy (I-90/94), Dan Ryan (I-90/94), Bishop Ford (I-94), the Stevenson (I-55), and I-57 Expressways in Cook County. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $1,110,000 ·
Jan 16, 2026 60R94 CookDistrict 1 (3366.37-Ft) Intersection Reconstruction of IL-171 at 95th Street, reconfigure the existing "wye" intersection into a "tee" intersection, in Unincorporated Willow Springs, Illinois in. Cook County. — Executed Nov 25 New OHLA Central, Inc. $8,643,219 ·
Jan 16, 2026 61K16 CookDistrict 1 Roadway reconstruction, lighting and traffic signal modernization on Belmont Avenue from Williams Drive to Mannheim Road and on Mannheim Road from South of Gage Avenue to Anderson Place in Franklin Park. — Executed Nov 25 New Alliance Contractors, Inc. $3,835,382 ·
Jan 16, 2026 61L75 CookDistrict 1 Resurfacing 5th Avenue from Harrison Street to Quincy Street in Maywood. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $424,594 ·
Jan 16, 2026 61L89 CookDistrict 1 HMA resurfacing on Maple Avenue from Brookfield Avenue to 31st Street in Brookfield. Includes pavement patching, curb and gutter, sidewalk, driveways, ADA ramps, curb bump-outs, and flashing beacons. — Executed Nov 25 New Builders Paving, LLC $1,934,050 ·
Jan 16, 2026 61L90 CookDistrict 1 Resurfacing on Jackson Boulevard from Des Plaines Avenue to Harlem Avenue in Forest Park. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $3,554,981 ·
Jan 16, 2026 61M09 CookDistrict 1 HMA resurfacing on 34th Street from Harlem Avenue to Ogden Avenue in Berwyn. Includes patching, PCC base course widening, sidewalk, curb and gutter, drainage improvements and traffic signal modernization. — Executed Nov 25 New Martam Construction Incorporated $7,777,148 ·
Jan 16, 2026 62321 CookDistrict 1 (1,375-Ft) Standard Overlay, ADA Improvements Project with HMA surface and binder course, thermoplastic pavement markings, curb ramps located on Kimball Avenue from Diversey Avenue to Wellington Avenue located in the City of Chicago Cook County. — Executed Nov 25 New MAT Construction Leasing, Inc. $548,280 ·
Jan 16, 2026 62D34 CookDistrict 1 The removal and replacement of the existing bridge including traffic signal modernization and ADA improvements (430-Ft) Proposed improvement consists of the removal and replacement of the existing bridge including traffic signal modernization and ADA improvements located on Touhy Avenue at North Branch of the Chicago River in Cook County. — Executed Nov 25 New Lorig Construction Company $6,966,559 ·
Jan 16, 2026 62K62 CookDistrict 1 The construction of the Central Park Avenue bridge (SN 016-2091) includes bridge construction, roadway reconst (480-Ft) The work consists of the construction of the Central Park Avenue bridge (SN 016-2091) includes bridge construction, roadway reconstruction, erosion control and protection, utility relocation of existing storm sewers, earth excavation and embankment, storm sewers, pavements, pavement marking and signage, roadway lighting, traffic signals, ITS, traffic control and protection urban enhancements. Located along Central Park Avenue over I-290 in the City of Chicago, Cook County, Illinois. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $19,469,072 ·
Jan 16, 2026 62K64 CookDistrict 1 (780-Ft) Bridge Superstructure (S.N. 016-0098) replacement including approach slab replacement, pier repairs, lighting, ADA improvements, traffic signal modernization, pedestrian walkways, bike lanes, curb ramp, and curb and gutter replacement located at I-290 at Paulina Street. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $13,918,848 ·
Jan 16, 2026 62K65 CookDistrict 1 (740-Ft) Bridge Superstructure reconstruction (SN-016-0754), approach slab reconstruction, bridge railing, fencing, earth excavation, topsoil excavation and placement, seeding and sodding, storm sewer and drainage structures, erosion control, hot-mix asphalt base, binder, and surface courses, PCC driveway pavement, PCC sidewalk, combination curb and gutter, traffic signal modernization, roadway and underpass lighting located I-290 at Sacramento Boulevard. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $13,380,221 ·
Jan 16, 2026 62P93 CookDistrict 1 ADA Improvements: curb ramps for sidewalks (ADA) including combination curb and gutter removal and replacement, sidewalk removal and replacement, installation of detectable warning surfaces, drainage structure adjustments, minor traffic signal improvements (accessible pedestrian signals), thermoplastic pavement markings work. Location: Various Routes, Various Locations within Norwood Park and Leyden Townships (Villages of Norridge, Park Ridge, River Grove and Elmwood Park). — Executed Nov 25 New Triggi Construction, Inc. $2,633,662 ·
Jan 16, 2026 62U12 CookDistrict 1 (520-Ft) Bridge Superstructure replacement, approach slab replacement, lighting ADA improvement and traffic signal modernization. The project is located at Structure No. 016-2114 on Loomis Street over I-290 in the City of Chicago in Cook County. — Executed Nov 25 New F. H. Paschen, S.N. Nielsen & Associates LLC $11,102,837 ·
Jan 16, 2026 62V42 CookDistrict 1 Resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement marki (4,061-Ft) Standard Overlay and ADA improvements consists of resurfacing the existing HMA pavement with HMA surface course, HMA Binder course, thermoplastic pavement markings, ADA Improvements for curb ramps. This project is in the villages of Niles and Morton Grove in Cook County. — Rejected Nov 25 New
Jan 16, 2026 62W33 CookDistrict 1 (2,652-Ft) Drainage improvements, installation of new trunk storm sewer includes pavement restoration, designed overlay, curb ramps for sidewalks (ADA) improvements and lane re-allocation via pavement markings. Location of Work: FAU 2843: Dixie Hwy, from Harwood Avenue to north of Sycamore Drive, within the Village of Homewood in Cook County. — Executed Nov 25 New Iroquois Paving Corporation $7,521,180 ·
Jan 16, 2026 62W47 CookDistrict 1 (2,231-Ft) Intersection Improvements, Traffic Signal Modernization, ADA compliant curb ramps at pedestrian crossings, driveway improvements, pavement markings, landscaping, roadway lighting locations at IL 7 (Southwest Hwy) and IL 43 (Harlem Ave) in the Villages of Worth and Chicago Ridge in Cook County. — Executed Nov 25 New D. Construction, Inc. $3,827,864 ·
Jan 16, 2026 62Y14 CookDistrict 1 I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic (296-Ft) Bridge joint repair and replacement, and bridge deck latex overlay project (SN 016-2545) consist of I-beam repair, joint sealing, HMA surface removal, butt joints, HMA surface course, guardrail removal, traffic barrier terminal installation, pavement markings, temporary concrete barrier, maintenance of traffic with temporary pavement markings, temporary traffic signals. This project is in the City of Chicago Heights, in Cook County, IL. — Executed Nov 25 New D. Construction, Inc. $742,733 ·
Jan 16, 2026 80B18 CookDistrict 1 Hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course and polymerized h (767.78-Ft) Designed Overlay Project consists of hot-mix asphalt surface removal, resurfacing with polymerized hot-mix asphalt surface course and polymerized hot-mix asphalt binder course, placement of thermoplastic and preformed plastic pavement markings, pavement patching, combination concrete curb and gutter removal and replacement. The project is located within the City of Elgin in Hanover Townships in Cook County. — Executed Nov 25 New Everlast Blacktop Inc. $556,373 ·
Jan 16, 2026 80B19 CookDistrict 1 Asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian r (3,512-Ft) Standard Overlay and ADA curb ramp improvement project consists of asphalt surface removal, placement of hot mix surface course, placement of hot mix binder course, pedestrian ramp improvements, pavement patching and pavement markings. This project located on IL-1 (Halsted St) from South of Ridge Road to Strieff Lane in the Villages of Homewood and Glenwood within Cook County. — Executed Nov 25 New Gallagher Asphalt Corporation $959,778 ·
Jan 16, 2026 80B81 CookDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-90/94 (Dan Ryan Expwy) expressway from Congress Pkwy to I-57 / I-94 (Bishop Ford Expwy) in Cook County. — Executed Nov 25 New Thor General Contracting LLC $293,485 ·
Jan 16, 2026 80B82 CookDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish which has accumulated on the highway areas. This work is located on I-190; I-90/94 expressways from W. of US 12/45 Mannheim Rd to Congress Pkwy in Cook County. — Executed Nov 25 New Thor General Contracting LLC $196,829 ·
Jan 16, 2026 80B85 CookDuPageDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-290/ IL 110; I-290A, FAP 342 and ILL 53 expressways from Lake Cook Road to Wells St. in Cook and DuPage Counties. — Executed Nov 25 New Thor General Contracting LLC $650,328 ·
Jan 16, 2026 80B86 CookDuPageWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking project shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish. This work is located on I-55 - Stevenson expressway from Reed Road to Lake Shore Dr in Cook, DuPage, and Will Counties. — Executed Nov 25 New Thor General Contracting LLC $515,515 ·
Feb 27, 2026 61L87 CookDistrict 1 HMA resurfacing of School Street from W 144th Street to W. 138th Street in the Village of Riverdale. Additionally includes curb and gutter, sidewalk and other required work. — Executed Nov 25 New Gallagher Asphalt Corporation $902,962 ·
Feb 27, 2026 61L93 CookDistrict 1 Resurfacing of Euclid Avenue from Rohlwing Road to Rand Road in the Village of Arlington Heights. Additional work includes HMA patching, sidewalks, curb and gutter, drainage improvements, traffic signal replacement and other required work. — Executed Nov 25 New K-Five Construction Corporation $6,861,033 ·
Feb 27, 2026 61M05 CookDistrict 1 Resurfacing 173rd Street from Wausau Avenue to South Park Avenue in the Village of South Holland. — Executed Nov 25 New K-Five Construction Corporation $293,000 ·
Feb 27, 2026 61M16 CookDistrict 1 Resurfacing and channelization on Gannon Drive from Golf Road to Higgins Road in the Village of Hoffman Estates. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $838,719 ·
Feb 27, 2026 61M18 CookDistrict 1 Resurfacing 171st Street from California Avenue to I-80/294 and from Western Avenue to I-80/294 in the Village of Hazel Crest. — Executed Nov 25 New Gallagher Asphalt Corporation $399,778 ·
Feb 27, 2026 61M20 CookDistrict 1 Lighting improvements on IL 50 from 87th Street to 111th Street in the Village of Oak Lawn. — Executed Nov 25 New H & H Electric Co. $318,848 ·
Feb 27, 2026 61M21 CookDistrict 1 Lighting improvements on US 20 from 69th Avenue to 54th Avenue and from IL 50 to Pulaski Road in the Village of Oak Lawn. — Executed Nov 25 New H & H Electric Co. $326,553 ·
Feb 27, 2026 61M26 CookDistrict 1 HMA resurfacing of Braintree Drive from Wise Road to Weathersfield Way in the village of Schaumburg. Work also includes construction of a roundabout intersection at Weathersfield Way, curb and gutter, PCC shared-use path, ADA ramps, lighting and other required work. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $12,659,993 ·
Feb 27, 2026 61M27 CookDistrict 1 HMA resurfacing of Braintree Road from Weathersfield Way to Schaumburg Road in the village of Schaumburg. Additionally includes pavement patching, curb and gutter, PCC shared-use path, ADA ramps, drainage improvements, lighting relocation and other required work. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $3,554,124 ·
Feb 27, 2026 61M28 CookDistrict 1 HMA resurfacing of Braintree Drive from Schaumburg Road to Bode Road in the village of Schaumburg. Additionally includes pavement patching, curb and gutter, PCC shared-use path, ADA ramps, drainage improvements, traffic signal modification, lighting relocation and other required work. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $3,964,130 ·
Feb 27, 2026 61M31 CookDistrict 1 Resurfacing Jones Road from Highland Boulevard to IL 72 in the village of Hoffman Estates. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $631,786 ·
Feb 27, 2026 61M32 CookDistrict 1 Resurfacing Montrose Avenue from Sayre Avenue to Forest Preserve Drive in the village of Harwood Heights. — Executed Nov 25 New A Lamp Concrete Contractors, Inc. $839,740 ·
Feb 27, 2026 62V09 CookDistrict 1 (1621-Ft) Intersection Improvements and Traffic Modernization will involve right-turn lane Pavement Reconstruction, Pavement widening, Intersection Resurfacing, Traffic Signal Modification, and ADA improvements. Located at IL 72 (Higgins Road) and Huntington Boulevard in the Village of Hoffman Estates in Cook County. — Executed Nov 25 New Plote Construction, Inc. $2,129,000 ·
Feb 27, 2026 62X53 CookDistrict 1 (185-ft) Proposed Culvert Repairs improvements is located at the intersection of IL 59 and IL 68 (Dundee Road) SN 016-2212, Village of Barrington Hills in Cook County. — Executed Nov 25 New MYS, Incorporated $899,287 ·
Feb 27, 2026 62X88 CookDistrict 1 (6,935-Ft) Designed and Standard Overlays, ADA sidewalk ramp Improvement, pavement patching, milling of existing HMA surface, placing HMA surface course and HMA binder course, drainage structures adjustment and cleaning, placement of pavement markings, installation of sidewalk ramp improvements, located on IL Route 43 (Waukegan Rd.) from Henley Street to Emerson Street in the Villages of Glenview and Morton Grove in Cook County. — Executed Nov 25 New Peter Baker & Son Co. $2,806,275 ·
Feb 27, 2026 62Y17 CookDistrict 1 Joint replacement, substructure repairs and cleaning and painting of bearings of the bridge located on Cermak (460-Ft) Bridge Deck Overlay (SN 016-0634) consist of joint replacement, substructure repairs and cleaning and painting of bearings of the bridge located on Cermak Road at Des Plaines River in the Village of North Riverside Cook County. — Executed Nov 25 New MYS, Incorporated $1,272,505 ·
Feb 27, 2026 80B56 CookDistrict 1 Cleaning and painting designated steel surfaces Bridge Painting project consists of cleaning and painting designated steel surfaces. Location 1: IL-21 (FAU 1332A) over US-14 (SN: 016-2572) Location 2: Oakton St. (FAP 374) over Des Plaines River 14 (SN: 016-2601) — Executed Nov 25 New Eagle Painting & Maintenance Company, Inc. $401,758 ·
Feb 27, 2026 80B83 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on FAI 80, I-80 Expressway from I-294 (Tri-State Tollway) to Will / Kendall County Line in Cook and Will Counties. — Executed Nov 25 New ABC Traffic Safety $160,313 ·
Feb 27, 2026 80B84 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any oth Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, Litter and any other rubbish located on I-57 expressway from I-90/94 (Dan Ryan Expressway) to Will / Kankakee County Line in Cook and Will Counties. — Executed Nov 25 New ABC Traffic Safety $211,275 ·
Apr 24, 2026 61L54 CookDistrict 1 HMA resurfacing of FAU 1447 (16th St.) from Harlem Ave. to Lombard Ave. in the City of Berwyn. Additional work includes traffic signal improvements, curb and gutter repair, pavement markings and other required work. — Executed Nov 25 New Martam Construction Incorporated $10,340,904 ·
Apr 24, 2026 61M15 CookDistrict 1 Construct a prefabricated truss bridge with approach spans to carry a shared-use path over US 14 and Union Pacific Railroad. Includes; MSE walls, HMA path, sidewalk, pavement patching, landscaping, and drainage improvements from Melas Park to Meadows Park in Mount Prospect. — Executed Nov 25 New Dunnet Bay Construction Company $10,744,243 ·
Apr 24, 2026 62K33 CookDistrict 1 (2.03-Mile) The project includes widening and reconstruction of Barrington Road to provide two lanes in each direction separated by a median from Mundhank Road to IL 62, replacing the Poplar Creek box culvert, modernizing and replacing traffic signals, interconnection, sidewalk and shared-use paths, ADA improvements, landscaping. The project is located on Barrington Road from Central Road to IL 62 (Algonquin Road). — Executed Nov 25 New Plote Construction, Inc. $31,680,000 ·
Apr 24, 2026 62L85 CookDistrict 1 Hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermop (1,525-Ft) Standard Overlay consists of hot-mix asphalt pavement removal and replacement, combination curb and gutter removal and replacement, thermoplastic pavement marking, sidewalk removal and replacement. Located in the Village of Forest Park, Cook County. — Executed Nov 25 New K-Five Construction Corporation $852,460 ·
Apr 24, 2026 62P51 CookDistrict 1 Earth excavation, pavement removal, sidewalk removal, driveway removal, (HMA) surface removal, curb and gutter (3,935-Ft) Traffic Signal Modernization and lighting installation project consists of earth excavation, pavement removal, sidewalk removal, driveway removal, (HMA) surface removal, curb and gutter removal, pavement patching, installation of aggregate and (HMA) shoulders, widening with (HMA) base course, resurfacing with polymerized (HMA) binder and polymerized (HMA) surface courses, structure adjustments, installation of storm sewer, drainage structures, sidewalk, shared-use path, driveways, lig — Executed Nov 25 New Martam Construction Incorporated $6,339,172 ·
Apr 24, 2026 62X31 CookWillDistrict 1 (650-Ft) Two culverts (SN 016-2290 and SN 099-0541) will undergo routine maintenance and repairs. Items include structural repair of concrete on headwalls and the removal and replacement of a wingwall. This project is located at FAI Route 57 over Butterfield Creek (0.04 Miles North of Village Commons Drive) and FAI Route 57 over Culvert (0.38 Miles North of Harlem Ave) — Executed Nov 25 New D. Construction, Inc. $135,363 ·
Apr 24, 2026 62X44 CookDistrict 1 Bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical This improvement consists of bridge deck concrete sealer upon the entire top surface of the bridge deck, sidewalks, top of inside vertical faces of the faces of curbs/raised medians, and inside and outside of dividing walls along walkways of the structure, roadway faces of parapets. (41) SN locations along I-90/94 (Edens and Kennedy Expressways) in the City of Chicago, Villages of Skokie and Wilmette, Cook County. — Executed Nov 25 New Mosley Construction 1, LLC $459,265 ·
Apr 24, 2026 62X57 CookDistrict 1 Pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement (1.27-Mile) Design Overlay consists of pavement patching, resurfacing with polymerized hot-mix asphalt surface course, binder course, ADA improvement and curb and gutter replacement, thermoplastic pavement marking. This improvement is in the Village of Wilmette, Kenilworth and Winnetka. — Executed Nov 25 New Schroeder Asphalt Services, Inc. $1,529,254 ·
Apr 24, 2026 62Y28 CookDistrict 1 Furnishing all labor, materials, equipment, and other incidentals necessary for the conversion of existing ITS The work consists of furnishing all labor, materials, equipment, and other incidentals necessary for the conversion of existing ITS equipment to run on cellular communications. This work also consists of installing temporary fiber optic cable. Improvements associated with this project are located with the Villages of Hillside, Bellwood, Westchester, Broadview, Maywood, Forest Park, and Oak Park, as well as the City of Chicago in Cook County, on I-290 between Wolf Road and Racine Avenue. — Executed Nov 25 New Meade Inc. $9,649,148 ·
Apr 24, 2026 62Y30 CookDistrict 1 Scarify and overlay bridge deck, bridge deck repairs, repair piers and abutments, repair parapets and sidewalk (190-Ft) Bridge Deck Overlay, Bridge Joint Replacement consists of scarify and overlay bridge deck, bridge deck repairs, repair piers and abutments, repair parapets and sidewalk, joint replacement, and graffiti removal on the bridge of US 14 (Peterson Ave) over North Shore Channel. This project is in the City of Chicago in Cook County. — Executed Nov 25 New Martam Construction Incorporated $786,723 ·
Apr 24, 2026 80B09 CookDistrict 1 (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerize (9,682.91) Standard Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with (HMA) surface course, polymerized (HMA) surface course, and polymerized (HMA) binder course, thermoplastic pavement markings and preformed plastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement The project is located within the Village of Elk Grove in Elk Grove Township in Cook County. — Executed Nov 25 New Builders Paving, LLC $4,440,808 ·
Apr 24, 2026 80B21 CookDistrict 1 (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace (3,373-Ft) Smart Overlay consists of (HMA) surface removal, (HMA) resurfacing, pavement reconstruction of existing PCC pavement (remove and replace), sidewalk removal, thermoplastic pavement markings, combination curb and gutter removal and replacement, concrete sidewalk and detectable warnings, drainage structure adjustments and pedestrian ramp improvements. This project is in the Village of Schaumburg in Cook County. — Executed Nov 25 New K-Five Construction Corporation $4,582,944 ·
Apr 24, 2026 80B26 CookDistrict 1 Pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps This improvement consists of pavement patching, hot-mix asphalt surface removal resurfacing with binder and surface course, sidewalk ramps improvements, curb and gutter replacement, thermoplastic pavement marking, raised reflective pavement markers located in the City of Blue Island and Village of Calumet Park in Cook County. — Executed Nov 25 New Gallagher Asphalt Corporation $2,940,592 ·
Apr 24, 2026 80B27 CookDistrict 1 (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized (3.104-Mile) Designed and Smart Overlay and ADA improvements project consists of (HMA) surface removal, resurfacing with polymerized (HMA) surface course, (HMA) binder course, and polymerized (HMA) binder course, thermoplastic pavement markings, ADA and APS improvements, pavement patching, combination concrete curb and gutter removal and replacement and median repair. The project is located within the City of Des Plaines in Maine Township in Cook County. — Executed Nov 25 New Plote Construction, Inc. $5,915,339 ·
Apr 24, 2026 80B30 CookDistrict 1 (2.3-Mile) Design Overlay and shoulder widening project includes HMA removal, earth excavation, pavement patching, resurfacing with HMA, full depth HMA shoulder, placement of pavement markings, installation of raised reflective markers, ADA ramps, pedestrian signals, detector loops. Located on IL 171 (Archer Avenue) in the Village of Lemont, Cook County. — Executed Nov 25 New K-Five Construction Corporation $4,118,431 ·
Apr 24, 2026 80B39 CookDistrict 1 Resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sid (4.42-Mile) Designed Overlay, standard overlay, and ADA improvements consists of resurfacing and existing HMA pavement with HMA surface and binder course, thermoplastic pavement markings, sidewalks. Location along US 34 (Ogden Ave) in the Cities of Brookfield, LaGrange, Lyons, and Riverside in Cook County. — Executed Nov 25 New K-Five Construction Corporation $6,442,571 ·
Apr 24, 2026 80B48 CookDistrict 1 (1,800-Ft) Bridge Deck Overlay includes hydro scarification of the existing bridge deck, concrete patching. The existing guardrail and bridge rails will be updated to meet standards. Pavement marking will be reestablished at the end of the construction. Project is in the city of Chicago, Cook County, Illinois, along Central Avenue over the North Branch of the Chicago River. — Executed Nov 25 New Martam Construction Incorporated $1,108,954 ·
Apr 24, 2026 80B55 CookDistrict 1 Bridge painting of the structures (Roosevelt Rd This improvement consists of bridge painting of the structures (Roosevelt Rd. over I-90/94 (Dan Ryan Expwy) SN: 016-0478, and Wilson Ave. over I-94 (Edens Expwy) SN: 016-2038. All structures are located at City of Chicago. — Executed Nov 25 New ERA-Valdivia Contractors, Inc. $1,123,158 ·
Apr 24, 2026 80B62 CookDistrict 1 (373.8-Ft) Bridge Deck latex concrete overlay, bridge and approach slab scarification, full and partial depth repairs to bridge slab and approach slab, HMA overlay on approach slabs, bridge deck grooving, concrete repair, maintenance of traffic, pavement marking, ADA ramps located on the Chicago Avenue bridge over I-90/94 in the City of Chicago in Cook County. — Executed Nov 25 New Martam Construction Incorporated $1,446,233 ·
Apr 24, 2026 80B79 CookWillDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING consists of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Bishop Ford Expwy) from Dan Ryan Expwy to I-80 in Cook County, on IL-394 from I-80 to IL 1 (Dixie Hwy) in Cook and Will Counties, on Stony Island Ave from I-94 to US 12 (95th St) and on 103rd St from Cottage Groove to Stony Island. — Executed Nov 25 New Charles & Charlie Janitorial Landscaping LLC $628,506 ·
Apr 24, 2026 80B80 CookLakeDistrict 1 The pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any ot LITTER PICKING. The work to be done under Litter Picking shall consist of the pickup, removal and satisfactory disposal of debris, deceased animal carcasses, refuse, litter, and any other rubbish which has accumulated on the highway located on I-94 (Edens Expwy) / US 41 (Skokie Hwy) expressway from Clavey Road to I-90 (Kennedy Expwy) in Cook and Lake Counties. — Executed Nov 25 New Orlando Lawn Service, Inc. $150,790 ·
Apr 24, 2026 80C49 CookDistrict 1 Milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder (2.66-Mile) Designed Overlay, New shoulders, and curb ramps improvements consists of milling the existing (HMA) surface, pavement patching, resurfacing with (HMA) surface course and (HMA) binder course, replacing aggregate shoulders with (HMA) shoulders, drainage structures adjustments and cleaning, replacement of curb and gutter, longitudinal joint sealing, thermoplastic pavement markings, joint and crack filling, joint or crack routing in (PCC Pavement), restriping with modified urethane pavem — Executed Nov 25 New K-Five Construction Corporation $4,164,775 ·
Jun 12, 2026 46952 CookDistrict 1 Resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs (2.69-Mile) Project consists of resurfacing William Powers State Park roadways, parking lots, pull-off parking areas, and cul-de-sacs. The work includes hot- mix asphalt resurfacing of roadway and parking areas, striping of park roadways and parking lots, bridge construction, pipe culvert replacements, sign replacements, multi-use path improvements, sidewalk and ADA improvements, and other miscellaneous improvement items. Project is in William Powers State Park, located in the City of Chicago in — Executed Nov 25 New K-Five Construction Corporation $3,153,771 ·
Jun 12, 2026 61M46 CookDistrict 1 HMA resurfacing of Skokie Boulevard from the southern city limits to Lake-Cook Road in the village of Northbrook. — Executed Nov 25 New Builders Paving, LLC $2,247,439 ·
Jun 12, 2026 61M49 CookDistrict 1 Installation of pedestrian lighting along the illinois Prairie Path in the village of Maywood. — Executed Nov 25 New Sjostrom & Sons, Inc. $1,709,017 ·
Jun 12, 2026 61M51 CookDistrict 1 Reconstruction of HMA trail from 109th Street and Lavergne Avenue to Harold L. Richards High School in the village of Oak Lawn. — Executed Nov 25 New Martam Construction Incorporated $3,179,237 ·
Jun 12, 2026 61M53 CookDistrict 1 Resurfacing Lexington Drive from Lake Cook Road to McHenry Road in the village of Wheeling. — Executed Nov 25 New Builders Paving, LLC $478,613 ·
Jun 12, 2026 62L30 CookDistrict 1 (2.95-Mile) Roadway Reconstruction and widening with hot-mix asphalt pavement, resurfacing, multi-cell box culverts, pipe culverts, storm sewer systems, ditch grading, curb and gutter, pavement markings, landscaping, guardrail. Located on Main Street is a two-lane roadway located in the Village of Lemont and unincorporated Cook County. — Executed Nov 25 New D. Construction, Inc. $13,940,412 ·
Jun 12, 2026 62R61 CookDistrict 1 (710.53-Ft) Bridge Replacement and widening project (SN 016-2015) include pavement resurfacing/reconstruction, curb and gutter replacement, sidewalk replacement (including ADA improvements), various drainage improvements, watermain (including jacking beneath I-290), signing, pavement markings, bridge and underpass lighting, traffic signal modernization, replacement storm manhole The project is in the City of Chicago, Cook County on Laramie Ave. over I-290. — Executed Nov 25 New OHLA Central, Inc. $43,537,120 ·
Jun 12, 2026 62T46 CookDistrict 1 Bridge Joint Replace, bearing and Substructure Repairs (350.89-Ft) Bridge Deck Overlay consists of Bridge Joint Replace, bearing and Substructure Repairs. This improvement is located along 131st Street over Metra Railroad (SN 016-2611) located in Cook County, Illinois. — Executed Nov 25 New D. Construction, Inc. $602,552 ·
Jun 12, 2026 62V08 CookDuPageKaneDistrict 1 Ditch regrading, culvert replacement, and various other drainage improvements The work on this project consists of ditch regrading, culvert replacement, and various other drainage improvements. This project is in DuPage County, This project is in DuPage County, Cook County and Kane County. — Executed Nov 25 New D. Construction, Inc. $1,863,322 ·
Jun 12, 2026 62W83 CookDistrict 1 This project adds 35 traffic signals into the Central Traffic Management System and 2 traffic signals to an existing closed loop system including installing fiber optic cable, network switches, PTZ Cameras and traffic signal controllers among other equipment to allow for remote access and monitoring capabilities at these locations. The Project is in three different areas of Cook County. — Executed Nov 25 New H & H Electric Co. $2,052,267 ·
101–200 of 239‹ PrevNext ›

Lettings: IDOT Transportation Bulletin (Notice of Letting and Contract Detail pages). Planned projects: IDOT Multi-Year Highway Improvement Program (roadway, structure and spot layers on the IDOT open data hub), listed by program year, not let date. "Added" is the first date Bid Potato saw the job. Always confirm against the official proposal before bidding.