| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$16,000.00 |
$7,458.00 |
$30,000.00 |
$16,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 50 | CY |
$20.00 |
$100.00 |
$27.35 |
$31.00 |
$37.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 400 | CY |
$20.00 |
$30.00 |
$12.43 |
$40.00 |
$42.50 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$15,000.00 |
$5,500.00 |
$9,944.00 |
$15,000.00 |
$13,750.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,752 | LF |
$2.00 |
$3.75 |
$2.49 |
$3.50 |
$4.00 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 140 | LF |
$11.00 |
$15.90 |
$12.43 |
$15.00 |
$17.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 7,412 | SY |
$2.50 |
$4.10 |
$4.82 |
$4.00 |
$4.66 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.54 | AC |
$500.00 |
$1,400.00 |
$1,491.60 |
$1,000.00 |
$1,200.00 |
| 9 | 241 2832 |
MOWING | 3.08 | AC |
$75.00 |
$600.00 |
$621.50 |
$500.00 |
$500.00 |
| 10 | 407(B) 0250 |
TACK COAT | 1,464.93 | GAL |
$4.00 |
$3.60 |
$4.04 |
$5.00 |
$3.74 |
| 11 | 408 5774 |
PRIME COAT | 250.98 | GAL |
$10.00 |
$8.00 |
$7.49 |
$5.00 |
$6.90 |
| 12 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 485.35 | TON |
$120.00 |
$121.00 |
$134.72 |
$130.00 |
$132.25 |
| 13 | 411(C) 5955 |
SUPERPAVE, TYPE S4(PG 70-28 OK) | 274.95 | TON |
$140.00 |
$164.85 |
$186.27 |
$157.00 |
$182.85 |
| 14 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 307.87 | TON |
$135.00 |
$148.00 |
$165.18 |
$132.00 |
$162.15 |
| 15 | 412 5267 |
COLD MILLING PAVEMENT | 4,190.88 | SY |
$5.00 |
$6.00 |
$3.51 |
$3.25 |
$10.50 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$450.00 |
$300.00 |
$348.74 |
$600.00 |
$400.00 |
| 17 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$10,000.00 |
$6,000.00 |
$8,079.50 |
$20,000.00 |
$9,000.00 |
| 18 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 211 | SY |
$10.00 |
$10.00 |
$4.97 |
$15.00 |
$48.00 |
| 19 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 896 | LF |
$4.00 |
$4.00 |
$4.97 |
$4.00 |
$5.50 |
| 20 | 619(C) 0924 |
SAWING PAVEMENT | 248 | LF |
$5.00 |
$5.00 |
$6.22 |
$3.00 |
$10.00 |
| 21 | 623 0100 |
(PL)GUARDRAIL CURBING | 4 | EA |
$3,000.00 |
$1,000.00 |
$3,729.00 |
$3,500.00 |
$1,600.00 |
| 22 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 900 | LF |
$18.00 |
$16.25 |
$19.19 |
$23.00 |
$25.30 |
| 23 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,500.00 |
$3,310.00 |
$3,915.45 |
$3,000.00 |
$3,500.00 |
| 24 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,100.00 |
$3,140.00 |
$3,716.57 |
$2,200.00 |
$2,500.00 |
| 25 | 625(B) 1252 |
REMOVE AND RECONSTRUCT FENCE | 75 | LF |
$10.00 |
$20.00 |
$18.65 |
$100.00 |
$26.00 |
| 26 | 501(G) 6309 |
CLSM BACKFILL | 256.6 | CY |
$175.00 |
$185.00 |
$247.46 |
$200.00 |
$205.00 |
| 27 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 714.2 | LF |
$210.00 |
$190.50 |
$192.98 |
$220.00 |
$191.50 |
| 28 | 504(A) 1304 |
APPROACH SLAB | 308 | SY |
$225.00 |
$197.50 |
$333.84 |
$255.00 |
$311.50 |
| 29 | 504(B) 1305 |
SAW-CUT GROOVING | 887.5 | SY |
$5.00 |
$4.00 |
$4.47 |
$3.60 |
$4.25 |
| 30 | 504(C) 6250 |
SEALED EXPANSION JOINT | 94.4 | LF |
$400.00 |
$259.00 |
$364.55 |
$275.00 |
$370.00 |
| 31 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 363 | LF |
$100.00 |
$80.00 |
$95.18 |
$105.00 |
$102.00 |
| 32 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 474.8 | LF |
$30.00 |
$30.00 |
$55.94 |
$65.00 |
$33.00 |
| 33 | 506(A) 1322 |
STRUCTURAL STEEL | 1,940 | LB |
$5.00 |
$2.25 |
$7.62 |
$1.25 |
$3.00 |
| 34 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 18 | EA |
$2,500.00 |
$1,496.00 |
$1,633.05 |
$2,600.00 |
$2,250.00 |
| 35 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 18 | EA |
$2,500.00 |
$1,496.00 |
$1,633.05 |
$2,600.00 |
$2,250.00 |
| 36 | 509(A) 1326 |
CLASS AA CONCRETE | 161.8 | CY |
$700.00 |
$760.00 |
$716.56 |
$1,200.00 |
$930.00 |
| 37 | 509(B) 1328 |
CLASS A CONCRETE | 0.3 | CY |
$2,000.00 |
$4,000.00 |
$647.57 |
$2,000.00 |
$17,500.00 |
| 38 | 509(D) 1331 |
CLASS C CONCRETE | 13.3 | CY |
$310.00 |
$300.00 |
$348.74 |
$750.00 |
$700.00 |
| 39 | 511(A) 1332 |
REINFORCING STEEL | 500 | LB |
$1.00 |
$2.00 |
$0.9900 |
$1.00 |
$1.65 |
| 40 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 40,690 | LB |
$1.15 |
$1.12 |
$1.13 |
$1.15 |
$1.25 |
| 41 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 588 | SY |
$5.00 |
$4.20 |
$4.97 |
$4.36 |
$4.60 |
| 42 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 113.5 | LF |
$40.00 |
$5.00 |
$49.72 |
$27.25 |
$28.75 |
| 43 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 10.5 | GAL |
$100.00 |
$95.00 |
$124.30 |
$54.50 |
$57.50 |
| 44 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 11.7 | SY |
$750.00 |
$800.00 |
$932.25 |
$820.00 |
$943.00 |
| 45 | 523(A) 6550 |
SEALER CRACK PREPARATION | 121.5 | LF |
$5.00 |
$4.20 |
$4.97 |
$4.00 |
$4.40 |
| 46 | 523(B) 6560 |
SEALER RESIN | 1.5 | GAL |
$250.00 |
$300.00 |
$248.60 |
$200.00 |
$220.00 |
| 47 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 179.5 | SF |
$75.00 |
$150.00 |
$93.23 |
$70.00 |
$80.00 |
| 48 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 11.7 | SY |
$50.00 |
$70.00 |
$37.29 |
$28.00 |
$31.05 |
| 49 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$40,000.00 |
$40,000.00 |
$37,290.00 |
$75,000.00 |
$110,000.00 |
| 50 | 201 6215 |
(PL)REMOVE DRIFT AND SILT | 1 | LSUM |
$50,000.00 |
$5,000.00 |
$10,565.50 |
$25,000.00 |
$40,000.00 |
| 51 | 501(G) 6309 |
CLSM BACKFILL | 342.7 | CY |
$175.00 |
$185.00 |
$247.46 |
$200.00 |
$205.00 |
| 52 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 3,114.8 | LF |
$210.00 |
$183.00 |
$210.16 |
$240.00 |
$200.00 |
| 53 | 504(A) 1304 |
APPROACH SLAB | 410.5 | SY |
$225.00 |
$165.00 |
$336.18 |
$265.00 |
$311.50 |
| 54 | 504(B) 1305 |
SAW-CUT GROOVING | 2,960.1 | SY |
$5.00 |
$3.50 |
$3.98 |
$3.20 |
$3.85 |
| 55 | 504(C) 6250 |
SEALED EXPANSION JOINT | 258.8 | LF |
$400.00 |
$259.00 |
$373.94 |
$275.00 |
$370.00 |
| 56 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 1,211 | LF |
$100.00 |
$80.00 |
$95.18 |
$105.00 |
$100.00 |
| 57 | 504(G) 6390 |
RAPID CURE JOINT SEALANT | 406.8 | LF |
$30.00 |
$30.00 |
$55.94 |
$65.00 |
$33.00 |
| 58 | 506(A) 1322 |
STRUCTURAL STEEL | 5,910 | LB |
$5.00 |
$2.25 |
$7.62 |
$1.25 |
$3.00 |
| 59 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 48 | EA |
$2,500.00 |
$1,400.00 |
$1,539.08 |
$2,600.00 |
$2,100.00 |
| 60 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 48 | EA |
$2,500.00 |
$1,400.00 |
$1,539.08 |
$2,600.00 |
$2,100.00 |
| 61 | 509(A) 1326 |
CLASS AA CONCRETE | 688.5 | CY |
$700.00 |
$750.00 |
$679.37 |
$950.00 |
$930.00 |
| 62 | 509(B) 1328 |
CLASS A CONCRETE | 27.8 | CY |
$700.00 |
$750.00 |
$585.40 |
$1,500.00 |
$2,200.00 |
| 63 | 509(D) 1331 |
CLASS C CONCRETE | 16.8 | CY |
$450.00 |
$350.00 |
$348.74 |
$550.00 |
$700.00 |
| 64 | 511(A) 1332 |
REINFORCING STEEL | 1,000 | LB |
$1.00 |
$2.00 |
$0.9900 |
$1.00 |
$1.65 |
| 65 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 178,090 | LB |
$1.15 |
$1.10 |
$1.13 |
$1.15 |
$1.25 |
| 66 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 2,372 | SY |
$5.00 |
$4.20 |
$4.97 |
$4.00 |
$4.60 |
| 67 | 520(A) 6058 |
PREPARATION OF CRACKS, ABOVE WATER | 369.5 | LF |
$40.00 |
$4.20 |
$49.72 |
$26.00 |
$28.75 |
| 68 | 520(C) 6060 |
EPOXY RESIN, ABOVE WATER | 33.5 | GAL |
$100.00 |
$95.00 |
$124.30 |
$50.00 |
$57.50 |
| 69 | 521(A) 6210 |
PNEUMATICALLY PLACED MORTAR | 43.9 | SY |
$750.00 |
$800.00 |
$932.25 |
$820.00 |
$943.00 |
| 70 | 523(A) 6550 |
SEALER CRACK PREPARATION | 712.1 | LF |
$5.00 |
$4.20 |
$4.97 |
$4.00 |
$4.40 |
| 71 | 523(B) 6560 |
SEALER RESIN | 8.5 | GAL |
$250.00 |
$300.00 |
$248.60 |
$200.00 |
$220.00 |
| 72 | 524(A) 6610 |
(SP)CARBON FIBER-REINFORCED POLYMER | 1,096.9 | SF |
$75.00 |
$150.00 |
$93.22 |
$70.00 |
$80.00 |
| 73 | 535 6130 |
(SP)CORROSION INHIBITOR(SURFACE APPLIED) | 73.9 | SY |
$50.00 |
$70.00 |
$37.29 |
$28.00 |
$31.05 |
| 74 | 619(B) 2500 |
REMOVAL OF BRIDGE ITEMS | 1 | LSUM |
$115,000.00 |
$155,000.00 |
$105,655.00 |
$100,000.00 |
$315,000.00 |
| 75 | 823 8478 |
(SP)PORTABLE TRAFFIC SIGNAL SYSTEM | 240 | SD |
$150.00 |
$66.00 |
$77.07 |
$100.00 |
$80.50 |
| 76 | 853 9033 |
DELINEATORS(TYPE 2, CODE 1) | 28 | EA |
$12.00 |
$15.00 |
$15.97 |
$10.00 |
$12.00 |
| 77 | 855(A) 8840 |
TRAFFIC STRIPE(PLASTIC)(THIN LINE)(4" WIDE) | 5,600 | LF |
$0.5000 |
$0.8800 |
$1.03 |
$0.7300 |
$0.8700 |
| 78 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 6,400 | LF |
$0.2000 |
$0.2800 |
$0.3100 |
$0.2500 |
$0.3000 |
| 79 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 2,800 | LF |
$0.1500 |
$1.22 |
$1.43 |
$0.5000 |
$0.6000 |
| 80 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 480 | SD |
$10.00 |
$14.00 |
$15.23 |
$3.00 |
$3.00 |
| 81 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 1,100 | LF |
$20.00 |
$25.00 |
$26.12 |
$15.00 |
$55.00 |
| 82 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 1,100 | LF |
$4.00 |
$4.00 |
$2.34 |
$5.00 |
$4.00 |
| 83 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 1,440 | SD |
$0.4000 |
$1.10 |
$1.17 |
$3.00 |
$8.00 |
| 84 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 960 | SD |
$0.7500 |
$4.20 |
$4.69 |
$0.1000 |
$0.0500 |
| 85 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 1,440 | SD |
$1.50 |
$4.20 |
$4.69 |
$3.00 |
$8.00 |
| 86 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 1,440 | SD |
$1.00 |
$0.0700 |
$0.0600 |
$0.2500 |
$0.1500 |
| 87 | 880(C) 8848 |
WING BARRICADES | 960 | SD |
$1.00 |
$2.20 |
$2.34 |
$0.2500 |
$0.1500 |
| 88 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,320 | SD |
$0.2500 |
$0.0400 |
$0.0200 |
$0.0500 |
$0.0300 |
| 89 | 880(F) 8878 |
DRUMS | 10,080 | SD |
$0.2500 |
$0.4300 |
$0.4700 |
$0.1000 |
$0.1000 |
| 90 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 480 | SD |
$15.00 |
$13.75 |
$15.23 |
$2.50 |
$3.00 |
| 91 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,000.00 |
$22,850.00 |
$19,212.60 |
$25,000.00 |
$16,000.00 |
| 92 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$5,000.00 |
$5,857.50 |
$6,000.00 |
$10,000.00 |
| 93 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$206,500.00 |
$200,000.00 |
$204,600.00 |
$230,000.00 |
$175,000.00 |