Bid tab 170376

Let Nov 16, 2017 · Division 8 · Nowata Sign up free

‹ Nov 2017 results

BRIDGE AND APPROACHES SH -28: OVER SALT CREEK , 1.3 MILES SOUTH OF THE US -60 INTERSECTION NEAR NOWATA . PROJECT LENGTH = 0.245 MILE

Let date
Thursday, November 16, 2017
Contract
170376
J/P numbers
28857(04)
District
Division 8
County
Nowata
Highway
Limits
BRIDGE AND APPROACHES SH -28: OVER SALT CREEK , 1.3 MILES SOUTH OF THE US -60 INTERSECTION NEAR NOWATA . PROJECT LENGTH = 0.245 MILE
Project number
STP-253C(041)SS

Bidders 3

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$1,985,584
1 H & H BRIDGE COMPANY Low bidder $1,778,169 -10.4%
3 B & B BRIDGE COMPANY, LLC $2,098,410 +5.7% +18.0%
4 M.J. HUGHES CONSTRUCTION, INC. $2,226,873 +12.2% +25.2%

Bid tab: unit prices 72 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 H & H BRIDGE CO…#3 B & B BRIDGE CO…#4 M.J. HUGHES CON…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $5,000.00 $50,000.00 $6,500.00 $20,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION1,862CY $7.50 $20.00 $8.50 $18.00
3205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $8,000.00 $8,500.00 $7,392.00 $18,000.00
4221(C) 2801 TEMPORARY SILT FENCE2,129LF $2.00 $2.99 $2.99 $3.50
5221(F) 0100 TEMPORARY SILT DIKE98LF $8.00 $14.95 $14.95 $16.00
6221(G) 0152 TEMPORARY ROCK FILTER DAM TYPE 3200CY $80.00 $35.00 $150.00 $62.00
7230(A) 2806 SOLID SLAB SODDING2,019SY $1.50 $9.95 $9.95 $11.20
8232(B) 2814 SEEDING METHOD B3.32AC $500.00 $6,750.00 $6,750.00 $7,538.00
9233(A) 2817 VEGETATIVE MULCHING3.32AC $200.00 $6,750.00 $6,750.00 $7,538.00
10303(A) 2100 AGGREGATE BASE TYPE A1,234CY $50.00 $46.24 $35.00 $55.00
11307(K) 4300 STABILIZED SUBGRADE5,853SY $8.00 $7.75 $5.95 $5.75
12325 5271 SEPARATOR FABRIC5,853SY $1.50 $1.62 $1.11 $1.50
13402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E313TON $35.00 $34.12 $20.00 $30.50
14408 5774 PRIME COAT3,483GAL $5.50 $4.00 $5.00 $5.00
15411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)1,691TON $85.00 $81.77 $64.00 $82.54
16411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)556TON $90.00 $93.48 $78.00 $110.00
17509(D) 0325 CLASS C CONCRETE10CY $250.00 $200.00 $300.00 $400.00
18613(B) 0689 18" CORR. GALV. STEEL PIPE67LF $35.00 $42.00 $25.50 $50.00
19613(M) 7196 TYPE A6 CULVERT END TREATMENT2EA $1,215.00 $1,500.00 $1,500.00 $1,700.00
20619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $8,000.00 $7,500.00 $4,500.00 $6,200.00
21619(B) 4728 REMOVAL OF ASPHALT PAVEMENT4,140SY $6.00 $6.00 $4.00 $8.00
22619(B) 4780 REMOVAL OF GUARDRAIL547LF $5.00 $3.00 $3.00 $4.50
23619(C) 0924 SAWING PAVEMENT72LF $7.00 $20.00 $20.00 $7.00
24623(A) 0932 BEAM GUARDRAIL W-BEAM SINGLE962LF $16.00 $16.50 $16.00 $21.00
25623(G) 8590 GUARDRAIL END TREATMENT (31")4EA $2,700.00 $2,200.00 $1,895.00 $2,650.00
26623(I) 8700 GUARDRAIL BRIDGE CONN-THRIE BEAM (31")4EA $2,500.00 $1,675.00 $1,390.00 $2,000.00
27624(C) 4458 FENCE-STYLE SWF (4 BARBED WIRE)600LF $8.00 $5.40 $9.50 $7.69
28624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)380LF $10.00 $5.70 $10.00 $7.50
29501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON250CY $22.00 $100.00 $25.00 $28.00
30501(G) 6309 CLSM BACKFILL288CY $125.00 $375.00 $140.00 $105.00
31503(A) 1313 PRESTRESSED CONCRETE BEAMS (TYPE IV)1,345LF $225.00 $200.00 $275.00 $250.00
32504(A) 1304 APPROACH SLAB381.4SY $173.44 $75.00 $200.00 $180.00
33504(B) 1305 SAW-CUT GROOVING1,579.9SY $4.22 $4.05 $4.05 $4.50
34504(C) 6250 SEALED EXPANSION JOINT48.9LF $254.49 $50.00 $205.00 $300.00
35504(D) 6245 CONCRETE RAIL (TR4)711LF $100.00 $50.00 $90.00 $100.00
36506(A) 1322 STRUCTURAL STEEL1,575LB $5.00 $1.00 $3.00 $1.75
37507(A) 6170 STAINLESS STEEL FIXED BEARING ASSEMBLY10EA $2,500.00 $2,500.00 $1,000.00 $1,650.00
38507(B) 6174 STAINLESS STEEL EXPANSION BEARING ASSEMBLY20EA $2,500.00 $2,500.00 $1,000.00 $1,750.00
39509(A) 1326 CLASS AA CONCRETE331.8CY $600.00 $200.00 $625.00 $700.00
40509(B) 1328 CLASS A CONCRETE206.9CY $650.00 $600.00 $625.00 $700.00
41509(D) 1331 CLASS C CONCRETE12CY $511.76 $500.00 $300.00 $325.00
42511(B) 6010 EPOXY COATED REINFORCING STEEL124,270LB $1.05 $0.7000 $0.9000 $1.00
43514(A) 6010 PILES, FURNISHED (HP 10X42)84LF $40.00 $21.00 $30.00 $25.00
44514(A) 6011 PILES, FURNISHED (HP 12X53)378LF $40.80 $28.00 $35.00 $31.00
45514(B) 6292 PILES, DRIVEN (HP 10X42)84LF $13.30 $3.00 $15.00 $95.00
46514(B) 6294 PILES, DRIVEN (HP 12X53)378LF $30.00 $3.00 $15.00 $61.00
47514(K) 6260 (PL)PILOT HOLES330LF $192.71 $140.00 $225.00 $220.00
48514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00
49515(A) 6013 WATER REPELLENT (VISUALLY INSPECTED)1,301SY $5.00 $3.65 $3.65 $4.00
50516(A) 6094 DRILLED SHAFTS 48" DIAMETER82LF $800.00 $1,000.00 $1,600.00 $900.00
51516(C) 6200 CROSSHOLE SONIC LOGGING1EA $3,000.00 $2,000.00 $10,000.00 $1,500.00
52523(A) 6550 SEALER CRACK PREPARATION46.5LF $4.35 $5.00 $5.00 $6.00
53523(B) 6560 SEALER RESIN0.6GAL $129.57 $200.00 $200.00 $225.00
54601(B) 1353 TYPE I-A PLAIN RIPRAP1,550TON $34.16 $33.14 $37.00 $38.00
55601(C) 1355 TYPE I-A FILTER BLANKET295TON $35.00 $24.72 $30.00 $30.00
56613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND96LF $25.22 $75.00 $40.00 $27.00
57613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.60LF $25.94 $65.00 $40.00 $21.00
58619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $40,000.00 $50,000.00 $100,000.00 $97,000.00
59805(A) 8724 (PL)REMOVAL OF EXISTING SIGNS4EA $50.00 $50.00 $50.00 $56.00
60850(A) 8110 SHEET ALUMINUM SIGNS32SF $30.00 $20.00 $15.00 $22.50
61851(C) 8330 2 1/2" SQUARE TUBE POST32LF $7.00 $8.00 $10.00 $9.00
62853 9069 GUARDRAIL DELINEATORS(TYPE 2, CODE 1)24EA $11.00 $10.00 $12.50 $12.00
63856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)5,200LF $1.00 $1.00 $1.00 $1.15
64880(B) 8818 CONSTRUCTION SIGNS 0 TO 6.25 SF8,640SD $0.8000 $0.5000 $0.3500 $0.7000
65880(B) 8821 CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF2,160SD $1.35 $1.00 $1.00 $3.40
66880(C) 8842 CONSTRUCTION BARRICADES(TYPE III)2,160SD $5.00 $1.00 $1.00 $1.15
67880(F) 8878 DRUMS960SD $0.5000 $0.5000 $0.4500 $0.5000
68882(A) 8306 PORT.CHANGEABLE MESSAGE SIGN120SD $10.00 $20.00 $15.00 $22.50
69642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $8,000.00 $6,600.00 $6,200.00 $18,000.00
70220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $5,000.00 $1,000.00 $2,500.00 $2,000.00
71640(A) 1398 FIELD OFFICE1EA $10,000.00 $1,000.00 $5,000.00 $5,500.00
72641 1399 MOBILIZATION1LSUM $118,953.26 $65,000.00 $130,450.00 $110,000.00