| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$17,895.20 |
$2,000.00 |
$97,427.80 |
$25,000.00 |
$27,250.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 51,156.1 | CY |
$5.48 |
$4.25 |
$5.00 |
$7.00 |
$6.55 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 5,807.2 | CY |
$10.18 |
$9.50 |
$5.00 |
$10.00 |
$12.45 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$14,939.57 |
$8,500.00 |
$14,000.00 |
$26,000.00 |
$7,850.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,306.7 | LF |
$1.53 |
$1.99 |
$2.00 |
$2.50 |
$2.50 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 406 | LF |
$8.11 |
$5.95 |
$6.00 |
$6.25 |
$12.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 40,483.9 | SY |
$1.35 |
$1.85 |
$2.00 |
$1.90 |
$2.25 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 5.6 | AC |
$585.35 |
$295.00 |
$330.00 |
$300.00 |
$650.00 |
| 9 | 241 2832 |
MOWING | 8.4 | AC |
$82.62 |
$59.00 |
$100.00 |
$65.00 |
$125.00 |
| 10 | 307(K) 4300 |
STABILIZED SUBGRADE | 26,528 | SY |
$7.16 |
$3.00 |
$6.00 |
$5.50 |
$5.45 |
| 11 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 500 | TON |
$27.62 |
$24.74 |
$20.00 |
$32.00 |
$29.66 |
| 12 | 407(B) 0250 |
TACK COAT | 7,611.7 | GAL |
$2.77 |
$3.10 |
$2.00 |
$3.20 |
$3.10 |
| 13 | 408 5774 |
PRIME COAT | 6,770.7 | GAL |
$5.09 |
$3.80 |
$1.00 |
$3.90 |
$3.80 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 7,111.1 | TON |
$64.63 |
$65.15 |
$55.00 |
$67.50 |
$65.15 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 2,740.5 | TON |
$79.19 |
$70.00 |
$60.00 |
$72.50 |
$70.00 |
| 16 | 411(I) 6310 |
SUPERPAVE, TYPE S4(PATCH)(PG64-22OK) | 200 | TON |
$128.11 |
$105.00 |
$80.00 |
$108.00 |
$105.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 50 | CY |
$317.85 |
$350.00 |
$350.00 |
$310.00 |
$500.00 |
| 18 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 240 | LF |
$32.38 |
$29.72 |
$60.00 |
$48.00 |
$40.00 |
| 19 | 613(B) 0690 |
24" CORR. GALV. STEEL PIPE | 69 | LF |
$41.22 |
$35.90 |
$65.00 |
$69.00 |
$50.00 |
| 20 | 613(M) 7196 |
TYPE A6 CULVERT END TREATMENT | 4 | EA |
$1,361.85 |
$1,500.00 |
$1,300.00 |
$1,950.00 |
$1,250.00 |
| 21 | 613(M) 7197 |
TYPE B6 CULVERT END TREATMENT | 2 | EA |
$1,506.63 |
$1,800.00 |
$1,500.00 |
$2,175.00 |
$1,425.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$7,396.46 |
$1,500.00 |
$5,000.00 |
$7,000.00 |
$1,500.00 |
| 23 | 619(B) 4725 |
REMOVAL OF FENCE | 5,250 | LF |
$1.42 |
$1.75 |
$2.00 |
$3.50 |
$3.00 |
| 24 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 19,371.5 | SY |
$2.75 |
$2.25 |
$4.00 |
$3.50 |
$7.00 |
| 25 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 545.82 | LF |
$2.88 |
$3.00 |
$5.00 |
$6.25 |
$6.35 |
| 26 | 619(C) 0924 |
SAWING PAVEMENT | 973.6 | LF |
$3.98 |
$5.00 |
$3.00 |
$2.05 |
$8.00 |
| 27 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 1,575 | LF |
$15.55 |
$16.50 |
$18.00 |
$17.00 |
$16.21 |
| 28 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 8 | EA |
$2,188.87 |
$1,950.00 |
$2,500.00 |
$2,000.00 |
$2,300.00 |
| 29 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 8 | EA |
$1,851.82 |
$1,425.00 |
$2,000.00 |
$2,300.00 |
$1,667.00 |
| 30 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 43 | EA |
$9.83 |
$12.50 |
$16.00 |
$16.00 |
$12.65 |
| 31 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 170 | CY |
$15.13 |
$40.00 |
$25.00 |
$50.00 |
$30.56 |
| 32 | 501(G) 6309 |
CLSM BACKFILL | 180 | CY |
$96.70 |
$150.00 |
$125.00 |
$125.00 |
$163.08 |
| 33 | 502(B) 6357 |
DETOUR BRIDGE | 1 | LSUM |
$307,533.00 |
$400,000.00 |
$225,000.00 |
$315,500.00 |
$249,800.50 |
| 34 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 596.7 | LF |
$191.45 |
$200.00 |
$180.00 |
$210.00 |
$239.54 |
| 35 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 498.3 | LF |
$223.70 |
$275.00 |
$250.00 |
$285.00 |
$307.43 |
| 36 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$161.00 |
$200.00 |
$175.00 |
$155.00 |
$181.41 |
| 37 | 504(B) 1305 |
SAW-CUT GROOVING | 1,260 | SY |
$3.93 |
$3.80 |
$4.00 |
$4.00 |
$5.00 |
| 38 | 504(C) 6250 |
SEALED EXPANSION JOINT | 43.2 | LF |
$230.00 |
$400.00 |
$215.00 |
$175.00 |
$267.71 |
| 39 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 563 | LF |
$72.60 |
$100.00 |
$60.00 |
$56.00 |
$83.34 |
| 40 | 506(A) 1322 |
STRUCTURAL STEEL | 1,428 | LB |
$2.80 |
$2.00 |
$4.00 |
$2.00 |
$3.17 |
| 41 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,100.00 |
$1,500.00 |
$1,400.00 |
$1,500.00 |
$1,583.83 |
| 42 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$1,760.00 |
$1,500.00 |
$1,400.00 |
$1,500.00 |
$1,583.83 |
| 43 | 509 6152 |
SPECIAL CONCRETE FINISH | 142 | SY |
$80.00 |
$100.00 |
$110.00 |
$85.00 |
$120.00 |
| 44 | 509(A) 1326 |
CLASS AA CONCRETE | 274 | CY |
$759.00 |
$582.00 |
$750.00 |
$625.00 |
$719.25 |
| 45 | 509(B) 1328 |
CLASS A CONCRETE | 188 | CY |
$492.00 |
$582.00 |
$675.00 |
$850.00 |
$654.26 |
| 46 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 98,525 | LB |
$1.79 |
$0.8500 |
$1.00 |
$1.10 |
$0.9100 |
| 47 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 25 | SY |
$314.89 |
$175.00 |
$300.00 |
$400.00 |
$561.73 |
| 48 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 25 | SY |
$505.52 |
$219.00 |
$350.00 |
$500.00 |
$765.74 |
| 49 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 130 | LF |
$37.25 |
$25.00 |
$30.00 |
$28.00 |
$38.78 |
| 50 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 412 | LF |
$34.50 |
$30.00 |
$35.00 |
$33.00 |
$48.37 |
| 51 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 130 | LF |
$14.00 |
$30.00 |
$15.00 |
$11.00 |
$5.83 |
| 52 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 412 | LF |
$25.00 |
$35.00 |
$15.00 |
$12.00 |
$5.83 |
| 53 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 54 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 987 | SY |
$4.00 |
$3.65 |
$4.00 |
$4.00 |
$3.65 |
| 55 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 70 | LF |
$795.00 |
$410.00 |
$700.00 |
$750.00 |
$894.19 |
| 56 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 64 | LF |
$790.00 |
$455.00 |
$1,000.00 |
$950.00 |
$1,135.74 |
| 57 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 2 | EA |
$2,475.00 |
$5,000.00 |
$6,500.00 |
$2,000.00 |
$1,500.00 |
| 58 | 523(A) 6550 |
SEALER CRACK PREPARATION | 123 | LF |
$3.80 |
$4.00 |
$4.00 |
$4.20 |
$4.00 |
| 59 | 523(B) 6560 |
SEALER RESIN | 1.5 | GAL |
$115.00 |
$200.00 |
$220.00 |
$210.00 |
$200.00 |
| 60 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 2,260 | TON |
$30.00 |
$40.00 |
$35.00 |
$40.00 |
$47.58 |
| 61 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 330 | TON |
$36.25 |
$34.00 |
$25.00 |
$35.00 |
$37.62 |
| 62 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 84 | LF |
$23.00 |
$40.00 |
$20.00 |
$18.00 |
$24.77 |
| 63 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$18.00 |
$40.00 |
$15.00 |
$18.00 |
$27.64 |
| 64 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$17,000.00 |
$180,000.00 |
$75,000.00 |
$90,000.00 |
| 65 | 202(D) 1302 |
UNCLASSIFIED BORROW | 133.5 | CY |
$10.18 |
$9.50 |
$5.00 |
$20.00 |
$28.40 |
| 66 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 189 | CY |
$25.00 |
$40.00 |
$25.00 |
$50.00 |
$27.16 |
| 67 | 501(G) 6309 |
CLSM BACKFILL | 200 | CY |
$127.00 |
$150.00 |
$125.00 |
$125.00 |
$163.08 |
| 68 | 502(B) 6357 |
DETOUR BRIDGE | 1 | LSUM |
$307,533.00 |
$310,000.00 |
$185,000.00 |
$250,000.00 |
$182,620.43 |
| 69 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 894.2 | LF |
$191.45 |
$200.00 |
$180.00 |
$235.00 |
$239.56 |
| 70 | 504(A) 1304 |
APPROACH SLAB | 295 | SY |
$161.00 |
$200.00 |
$175.00 |
$155.00 |
$181.03 |
| 71 | 504(B) 1305 |
SAW-CUT GROOVING | 1,272 | SY |
$3.93 |
$3.80 |
$4.00 |
$4.00 |
$5.00 |
| 72 | 504(C) 6250 |
SEALED EXPANSION JOINT | 20.9 | LF |
$230.00 |
$400.00 |
$215.00 |
$175.00 |
$618.74 |
| 73 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 496 | LF |
$72.60 |
$100.00 |
$60.00 |
$56.00 |
$83.55 |
| 74 | 506(A) 1322 |
STRUCTURAL STEEL | 1,350 | LB |
$1.79 |
$2.00 |
$4.00 |
$2.00 |
$3.47 |
| 75 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 10 | EA |
$2,100.00 |
$1,500.00 |
$1,400.00 |
$1,500.00 |
$2,114.10 |
| 76 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 20 | EA |
$1,760.00 |
$1,500.00 |
$1,400.00 |
$1,500.00 |
$2,114.10 |
| 77 | 509 6152 |
SPECIAL CONCRETE FINISH | 154 | SY |
$80.00 |
$100.00 |
$110.00 |
$85.00 |
$120.00 |
| 78 | 509(A) 1326 |
CLASS AA CONCRETE | 202 | CY |
$759.00 |
$582.00 |
$750.00 |
$725.00 |
$788.24 |
| 79 | 509(B) 1328 |
CLASS A CONCRETE | 190 | CY |
$492.00 |
$582.00 |
$675.00 |
$850.00 |
$645.03 |
| 80 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 88,150 | LB |
$1.79 |
$0.8500 |
$1.00 |
$1.10 |
$0.9100 |
| 81 | 513(B) 6019 |
CLASS B BRIDGE DECK REPAIR | 25 | SY |
$314.89 |
$175.00 |
$300.00 |
$400.00 |
$561.73 |
| 82 | 513(C) 6020 |
CLASS C BRIDGE DECK REPAIR | 25 | SY |
$505.52 |
$219.00 |
$350.00 |
$500.00 |
$765.74 |
| 83 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 875 | SY |
$4.00 |
$3.65 |
$4.00 |
$4.00 |
$3.65 |
| 84 | 516(A) 6091 |
DRILLED SHAFTS 30" DIAMETER | 191 | LF |
$185.00 |
$520.00 |
$550.00 |
$650.00 |
$815.60 |
| 85 | 516(A) 6094 |
DRILLED SHAFTS 48" DIAMETER | 58 | LF |
$795.00 |
$1,300.00 |
$1,000.00 |
$2,500.00 |
$2,164.92 |
| 86 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 4 | EA |
$2,475.00 |
$5,000.00 |
$6,500.00 |
$2,000.00 |
$1,500.00 |
| 87 | 523(A) 6550 |
SEALER CRACK PREPARATION | 144 | LF |
$3.80 |
$4.00 |
$4.00 |
$4.20 |
$4.00 |
| 88 | 523(B) 6560 |
SEALER RESIN | 1.5 | GAL |
$115.00 |
$200.00 |
$220.00 |
$210.00 |
$200.00 |
| 89 | 601(A) 1351 |
TYPE I PLAIN RIPRAP | 2,585 | TON |
$30.00 |
$40.00 |
$35.00 |
$40.00 |
$47.58 |
| 90 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 377 | TON |
$36.25 |
$34.00 |
$25.00 |
$35.00 |
$37.62 |
| 91 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 100 | LF |
$23.00 |
$40.00 |
$20.00 |
$18.00 |
$25.19 |
| 92 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 50 | LF |
$18.00 |
$40.00 |
$15.00 |
$18.00 |
$26.94 |
| 93 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$30,000.00 |
$13,000.00 |
$130,000.00 |
$50,000.00 |
$80,000.00 |
| 94 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 16,730 | LF |
$0.2000 |
$0.2000 |
$0.2500 |
$0.2200 |
$0.1500 |
| 95 | 857(C) 8851 |
REMOVABLE PAVEMENT MARKING TAPE(4" WIDE) | 1,050 | LF |
$1.81 |
$1.00 |
$1.00 |
$1.05 |
$2.00 |
| 96 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 3,000 | LF |
$0.4000 |
$0.2500 |
$0.2500 |
$0.2700 |
$2.00 |
| 97 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 2,050 | SD |
$5.54 |
$5.00 |
$5.50 |
$5.15 |
$4.00 |
| 98 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 10,561 | LF |
$17.33 |
$24.75 |
$13.00 |
$22.00 |
$30.00 |
| 99 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 5,300 | LF |
$3.64 |
$0.2500 |
$6.00 |
$2.00 |
$6.00 |
| 100 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 12,930 | SD |
$0.2300 |
$0.2500 |
$0.2500 |
$0.3000 |
$0.0200 |
| 101 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 10,660 | SD |
$0.6800 |
$0.2500 |
$0.2500 |
$0.2700 |
$0.0200 |
| 102 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 10,050 | SD |
$0.7200 |
$0.5000 |
$0.5500 |
$0.5300 |
$0.1000 |
| 103 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 6,430 | SD |
$0.4000 |
$1.00 |
$1.10 |
$1.05 |
$0.2000 |
| 104 | 880(C) 8848 |
WING BARRICADES | 1,280 | SD |
$0.6900 |
$2.00 |
$2.20 |
$2.10 |
$5.00 |
| 105 | 880(D) 8854 |
VERTICAL PANELS | 12,150 | SD |
$0.1700 |
$0.1000 |
$0.1000 |
$0.1100 |
$1.50 |
| 106 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 21,220 | SD |
$0.1800 |
$0.0500 |
$0.1000 |
$0.0600 |
$0.0200 |
| 107 | 880(F) 8878 |
DRUMS | 2,600 | SD |
$0.3100 |
$1.00 |
$1.10 |
$1.10 |
$1.50 |
| 108 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 696 | SD |
$8.90 |
$10.00 |
$11.00 |
$11.00 |
$30.00 |
| 109 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$294.57 |
$200.00 |
$1,000.00 |
$225.00 |
$675.00 |
| 110 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 79.9 | SF |
$19.14 |
$14.00 |
$15.00 |
$15.00 |
$15.00 |
| 111 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 96 | LF |
$9.09 |
$10.00 |
$11.00 |
$10.50 |
$6.00 |
| 112 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 17,500 | LF |
$0.6600 |
$0.4700 |
$1.00 |
$0.5000 |
$0.6200 |
| 113 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,500 | LF |
$0.4000 |
$0.2500 |
$0.3000 |
$0.2700 |
$2.00 |
| 114 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$15,761.27 |
$14,500.00 |
$25,000.00 |
$15,000.00 |
$39,700.00 |
| 115 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,678.91 |
$5,000.00 |
$7,500.00 |
$2,000.00 |
$15,500.00 |
| 116 | 640(A) 1398 |
FIELD OFFICE | 1 | EA |
$9,344.22 |
$8,500.00 |
$5,000.00 |
$10,200.00 |
$5,000.00 |
| 117 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$75,156.18 |
$155,550.00 |
$260,000.00 |
$276,043.00 |
$490,000.00 |