| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$8,000.00 |
$8,000.00 |
$31,500.00 |
$37,250.00 |
$15,000.00 |
$19,500.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 5,399 | CY |
$6.50 |
$8.00 |
$6.00 |
$7.87 |
$12.75 |
$8.25 |
$9.00 |
| 3 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$6,500.00 |
$4,157.50 |
$4,200.00 |
$10,000.00 |
$10,875.00 |
$9,500.00 |
| 4 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,542 | LF |
$4.00 |
$3.00 |
$2.25 |
$1.51 |
$2.00 |
$1.76 |
$1.44 |
| 5 | 221(F) 0100 |
TEMPORARY SILT DIKE | 370 | LF |
$8.00 |
$6.50 |
$7.25 |
$12.05 |
$12.50 |
$9.00 |
$11.48 |
| 6 | 230(A) 2806 |
SOLID SLAB SODDING | 11,972 | SY |
$2.50 |
$2.50 |
$2.00 |
$1.87 |
$2.22 |
$2.00 |
$1.78 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.5 | AC |
$450.00 |
$500.00 |
$2,750.00 |
$656.25 |
$650.00 |
$350.00 |
$625.00 |
| 8 | 307(J) 4290 |
MODIFIED SUBGRADE | 6,513 | SY |
$10.00 |
$6.85 |
$6.00 |
$5.78 |
$7.25 |
$6.30 |
$5.50 |
| 9 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,509 | TON |
$35.00 |
$28.00 |
$23.50 |
$27.30 |
$27.50 |
$34.75 |
$36.00 |
| 10 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 121 | CY |
$25.00 |
$15.25 |
$8.00 |
$16.38 |
$22.00 |
$14.25 |
$25.00 |
| 11 | 509(A) 0319 |
CLASS AA CONCRETE | 144 | CY |
$550.00 |
$510.00 |
$400.00 |
$467.63 |
$425.00 |
$625.00 |
$675.00 |
| 12 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$300.00 |
$325.00 |
$390.00 |
$545.32 |
$200.00 |
$310.00 |
$250.00 |
| 13 | 511(A) 0332 |
REINFORCING STEEL | 24,734 | LB |
$1.00 |
$0.9500 |
$1.00 |
$1.02 |
$1.22 |
$0.8500 |
$0.8500 |
| 14 | 601(A) 0297 |
TYPE I PLAIN RIPRAP | 486 | TON |
$70.00 |
$30.00 |
$40.00 |
$32.55 |
$39.00 |
$48.60 |
$38.00 |
| 15 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$10,000.00 |
$10,000.00 |
$6,300.00 |
$12,750.00 |
$6,000.00 |
$5,000.00 |
| 16 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 614.5 | LF |
$25.00 |
$20.00 |
$19.00 |
$18.90 |
$19.75 |
$18.70 |
$18.00 |
| 17 | 623(F) 4446 |
GUARDRAIL ANCHOR UNIT (TYPE A) | 8 | EA |
$1,600.00 |
$1,900.00 |
$1,750.00 |
$1,575.00 |
$1,650.00 |
$1,625.00 |
$1,500.00 |
| 18 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 8 | EA |
$2,200.00 |
$2,150.00 |
$1,500.00 |
$1,312.50 |
$1,925.00 |
$1,250.00 |
$1,250.00 |
| 19 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,430 | LF |
$7.00 |
$6.50 |
$6.50 |
$4.62 |
$4.25 |
$5.00 |
$4.40 |
| 20 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 10 | SF |
$20.00 |
$24.00 |
$16.00 |
$21.00 |
$20.00 |
$25.00 |
$20.00 |
| 21 | 851(C) 8327 |
2 1/4" SQUARE TUBE POST | 22 | LF |
$20.00 |
$12.00 |
$12.00 |
$10.50 |
$20.00 |
$15.00 |
$10.00 |
| 22 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 180 | CY |
$26.00 |
$14.64 |
$10.50 |
$21.00 |
$25.00 |
$11.75 |
$25.00 |
| 23 | 501(F) 6352 |
GRANULAR BACKFILL | 76 | CY |
$60.00 |
$65.00 |
$19.50 |
$84.00 |
$100.00 |
$72.00 |
$75.00 |
| 24 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 224 | LF |
$220.00 |
$243.00 |
$275.00 |
$236.81 |
$225.00 |
$246.50 |
$270.00 |
| 25 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 211.2 | LF |
$80.00 |
$88.92 |
$90.00 |
$79.57 |
$67.50 |
$83.00 |
$105.00 |
| 26 | 506(A) 1322 |
STRUCTURAL STEEL | 510 | LB |
$4.00 |
$2.00 |
$3.25 |
$2.36 |
$5.00 |
$3.00 |
$3.00 |
| 27 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 3 | EA |
$1,000.00 |
$550.00 |
$950.00 |
$733.29 |
$1,250.00 |
$900.00 |
$975.00 |
| 28 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 3 | EA |
$1,200.00 |
$550.00 |
$950.00 |
$733.29 |
$1,250.00 |
$900.00 |
$975.00 |
| 29 | 509(A) 1326 |
CLASS AA CONCRETE | 60.1 | CY |
$550.00 |
$550.00 |
$650.00 |
$659.43 |
$775.00 |
$692.50 |
$725.00 |
| 30 | 509(B) 1328 |
CLASS A CONCRETE | 66.2 | CY |
$620.00 |
$550.00 |
$660.00 |
$659.43 |
$650.00 |
$735.00 |
$725.00 |
| 31 | 511(A) 1332 |
REINFORCING STEEL | 23,310 | LB |
$1.00 |
$1.02 |
$0.9500 |
$0.9200 |
$1.55 |
$0.8300 |
$1.05 |
| 32 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 82 | LF |
$40.00 |
$41.20 |
$70.00 |
$27.57 |
$35.00 |
$51.80 |
$42.00 |
| 33 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 173 | LF |
$45.00 |
$44.00 |
$72.00 |
$33.56 |
$45.00 |
$63.00 |
$55.00 |
| 34 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 82 | LF |
$15.00 |
$10.00 |
$40.00 |
$15.75 |
$15.00 |
$22.20 |
$12.00 |
| 35 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 173 | LF |
$15.00 |
$10.00 |
$40.00 |
$15.75 |
$15.00 |
$27.00 |
$12.00 |
| 36 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 37 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 370 | TON |
$45.00 |
$31.00 |
$40.00 |
$37.80 |
$39.00 |
$49.25 |
$40.00 |
| 38 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 112 | TON |
$35.00 |
$28.00 |
$20.00 |
$33.60 |
$39.00 |
$38.75 |
$38.00 |
| 39 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$32.00 |
$15.00 |
$45.00 |
$31.50 |
$25.00 |
$30.00 |
$35.00 |
| 40 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$15.00 |
$45.00 |
$31.50 |
$25.00 |
$35.00 |
$35.00 |
| 41 | 504 6143 |
TUBULAR METAL TRAFFIC RAIL | 82 | LF |
$115.00 |
$42.00 |
$55.00 |
$47.25 |
$75.00 |
$72.50 |
$45.00 |
| 42 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$10,000.00 |
$4,000.00 |
$4,500.00 |
$3,150.00 |
$4,950.00 |
$3,500.00 |
$3,000.00 |
| 43 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$10,000.00 |
$10,000.00 |
$10,815.00 |
$1,250.00 |
$11,000.00 |
$15,500.00 |
| 44 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$6,500.00 |
$2,625.00 |
$500.00 |
$3,600.00 |
$1,275.00 |
| 45 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$58,000.00 |
$45,000.00 |
$50,000.00 |
$51,691.84 |
$17,250.00 |
$44,000.00 |
$61,000.00 |