| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$8,000.00 |
$4,650.00 |
$7,900.00 |
$7,500.00 |
$7,000.00 |
$8,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 810 | CY |
$10.00 |
$9.00 |
$9.00 |
$6.55 |
$9.00 |
$10.50 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 300 | CY |
$40.00 |
$30.00 |
$30.00 |
$16.67 |
$35.00 |
$33.00 |
| 4 | 202(D) 0184 |
UNCLASSIFIED BORROW | 1,487 | CY |
$12.00 |
$10.00 |
$10.00 |
$8.00 |
$10.50 |
$13.00 |
| 5 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$3,500.00 |
$7,500.00 |
$7,500.00 |
$4,500.00 |
$5,800.00 |
$4,000.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,220 | LF |
$2.50 |
$1.12 |
$2.95 |
$1.12 |
$1.25 |
$1.12 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 105 | LF |
$10.00 |
$12.50 |
$8.95 |
$12.50 |
$13.80 |
$12.50 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 6,916 | SY |
$2.50 |
$1.23 |
$1.59 |
$1.23 |
$1.36 |
$1.23 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 2.1 | AC |
$500.00 |
$550.00 |
$100.00 |
$550.00 |
$395.00 |
$550.00 |
| 10 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 584 | TON |
$40.00 |
$21.15 |
$21.15 |
$19.20 |
$27.40 |
$27.00 |
| 11 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$300.00 |
$150.00 |
$349.00 |
$305.00 |
$250.00 |
| 12 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 4 | TON |
$200.00 |
$100.00 |
$100.00 |
$60.00 |
$300.00 |
$36.00 |
| 13 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 2 | TON |
$150.00 |
$100.00 |
$100.00 |
$55.00 |
$100.00 |
$30.00 |
| 14 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 159 | LF |
$50.00 |
$40.00 |
$40.00 |
$23.15 |
$24.00 |
$45.00 |
| 15 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$1,000.00 |
$1,500.00 |
$1,000.00 |
$2,010.00 |
$970.00 |
$1,800.00 |
| 16 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$3,500.00 |
$2,900.00 |
$4,000.00 |
$4,000.00 |
| 17 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 195 | LF |
$8.50 |
$12.00 |
$6.00 |
$6.50 |
$17.00 |
$15.00 |
| 18 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$20.00 |
$50.00 |
$15.00 |
$11.00 |
$15.00 |
| 19 | 501(G) 6309 |
CLSM BACKFILL | 56 | CY |
$220.00 |
$100.00 |
$200.00 |
$161.00 |
$166.00 |
$150.00 |
| 20 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 254 | LF |
$250.00 |
$190.00 |
$250.00 |
$290.00 |
$223.00 |
$230.00 |
| 21 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$250.00 |
$220.00 |
$150.00 |
$214.00 |
$211.50 |
$210.00 |
| 22 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 226.6 | LF |
$75.00 |
$85.00 |
$50.00 |
$101.00 |
$79.50 |
$85.00 |
| 23 | 506(A) 1322 |
STRUCTURAL STEEL | 320 | LB |
$4.00 |
$5.00 |
$1.00 |
$3.00 |
$3.50 |
$3.00 |
| 24 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$900.00 |
$300.00 |
$1,000.00 |
$342.00 |
$450.00 |
$400.00 |
| 25 | 509(A) 1326 |
CLASS AA CONCRETE | 85.5 | CY |
$950.00 |
$700.00 |
$250.00 |
$667.00 |
$667.50 |
$600.00 |
| 26 | 509(B) 1328 |
CLASS A CONCRETE | 39.2 | CY |
$580.00 |
$700.00 |
$350.00 |
$778.00 |
$685.00 |
$600.00 |
| 27 | 511(A) 1332 |
REINFORCING STEEL | 21,470 | LB |
$1.00 |
$0.7500 |
$1.00 |
$0.8000 |
$0.8000 |
$0.9500 |
| 28 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 216 | LF |
$38.00 |
$30.00 |
$25.00 |
$42.00 |
$45.50 |
$35.00 |
| 29 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 216 | LF |
$12.00 |
$20.00 |
$3.00 |
$12.00 |
$19.50 |
$10.00 |
| 30 | 514(K) 6260 |
(PL)PILOT HOLES | 132 | LF |
$125.00 |
$200.00 |
$350.00 |
$243.00 |
$225.00 |
$250.00 |
| 31 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 32 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,293 | TON |
$50.00 |
$29.00 |
$30.52 |
$31.37 |
$36.00 |
$36.00 |
| 33 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 138 | TON |
$50.00 |
$22.00 |
$24.64 |
$21.56 |
$29.00 |
$30.00 |
| 34 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$40.00 |
$75.00 |
$14.00 |
$30.00 |
$30.00 |
| 35 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$40.00 |
$65.00 |
$14.00 |
$39.00 |
$30.00 |
| 36 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,400.00 |
$5,400.00 |
$9,000.00 |
$12,500.00 |
$8,000.00 |
| 37 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$1,475.00 |
$1,300.00 |
$1,475.00 |
$1,565.00 |
$1,475.00 |
| 38 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 137.5 | LF |
$17.50 |
$17.00 |
$20.00 |
$17.00 |
$18.00 |
$17.00 |
| 39 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,250.00 |
$2,250.00 |
$2,400.00 |
$2,250.00 |
$2,362.50 |
$2,250.00 |
| 40 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$1,875.00 |
$1,875.00 |
$1,992.29 |
$2,625.00 |
$1,875.00 |
| 41 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$5,000.00 |
$2,350.00 |
$5,600.00 |
$7,000.00 |
$6,500.00 |
$9,000.00 |
| 42 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 1,846 | CY |
$10.00 |
$8.50 |
$8.50 |
$6.55 |
$8.25 |
$8.50 |
| 43 | 202(C) 0182 |
ROCK EXCAVATION | 300 | CY |
$40.00 |
$30.00 |
$30.00 |
$16.67 |
$40.00 |
$33.00 |
| 44 | 202(D) 0184 |
UNCLASSIFIED BORROW | 2,284 | CY |
$12.00 |
$10.00 |
$10.00 |
$8.00 |
$10.25 |
$10.50 |
| 45 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$6,900.00 |
$6,900.00 |
$4,500.00 |
$6,250.00 |
$6,000.00 |
| 46 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,946 | LF |
$2.00 |
$1.12 |
$2.95 |
$1.12 |
$1.25 |
$1.12 |
| 47 | 221(F) 0100 |
TEMPORARY SILT DIKE | 119 | LF |
$10.00 |
$12.50 |
$8.95 |
$12.50 |
$13.80 |
$12.50 |
| 48 | 230(A) 2806 |
SOLID SLAB SODDING | 10,119 | SY |
$2.00 |
$1.23 |
$1.59 |
$1.23 |
$1.36 |
$1.23 |
| 49 | 233(A) 2817 |
VEGETATIVE MULCHING | 3.14 | AC |
$475.00 |
$550.00 |
$100.00 |
$550.00 |
$395.00 |
$550.00 |
| 50 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 942 | TON |
$35.00 |
$21.15 |
$21.15 |
$19.20 |
$27.00 |
$27.00 |
| 51 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$375.00 |
$300.00 |
$150.00 |
$349.00 |
$300.00 |
$250.00 |
| 52 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 166 | LF |
$50.00 |
$40.00 |
$40.00 |
$28.07 |
$24.00 |
$45.00 |
| 53 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 6 | EA |
$1,075.00 |
$1,500.00 |
$1,000.00 |
$2,010.00 |
$970.00 |
$1,700.00 |
| 54 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$3,500.00 |
$4,000.00 |
$4,000.00 |
$4,000.00 |
| 55 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 450 | LF |
$8.00 |
$12.00 |
$6.00 |
$6.50 |
$17.00 |
$15.00 |
| 56 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$20.00 |
$20.00 |
$50.00 |
$15.00 |
$10.50 |
$25.00 |
| 57 | 501(G) 6309 |
CLSM BACKFILL | 70 | CY |
$220.00 |
$100.00 |
$200.00 |
$161.00 |
$166.00 |
$155.00 |
| 58 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 269 | LF |
$225.00 |
$225.00 |
$350.00 |
$298.00 |
$235.00 |
$260.00 |
| 59 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$250.00 |
$220.00 |
$150.00 |
$214.00 |
$209.00 |
$210.00 |
| 60 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 244.6 | LF |
$75.00 |
$85.00 |
$50.00 |
$101.00 |
$79.00 |
$85.00 |
| 61 | 506(A) 1322 |
STRUCTURAL STEEL | 320 | LB |
$4.00 |
$5.00 |
$1.00 |
$3.00 |
$3.50 |
$4.00 |
| 62 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$900.00 |
$300.00 |
$1,000.00 |
$355.00 |
$450.00 |
$400.00 |
| 63 | 509(A) 1326 |
CLASS AA CONCRETE | 93.8 | CY |
$650.00 |
$700.00 |
$250.00 |
$666.00 |
$650.00 |
$600.00 |
| 64 | 509(B) 1328 |
CLASS A CONCRETE | 41.8 | CY |
$600.00 |
$700.00 |
$350.00 |
$777.00 |
$685.00 |
$600.00 |
| 65 | 511(A) 1332 |
REINFORCING STEEL | 23,730 | LB |
$1.00 |
$0.7500 |
$1.20 |
$0.8000 |
$0.8000 |
$0.9500 |
| 66 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 252 | LF |
$35.00 |
$30.00 |
$25.00 |
$42.00 |
$45.50 |
$40.00 |
| 67 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 252 | LF |
$12.00 |
$20.00 |
$3.00 |
$12.00 |
$19.50 |
$10.00 |
| 68 | 514(K) 6260 |
(PL)PILOT HOLES | 154 | LF |
$120.00 |
$180.00 |
$350.00 |
$213.00 |
$205.00 |
$250.00 |
| 69 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 70 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 2,281 | TON |
$40.00 |
$29.00 |
$30.52 |
$31.37 |
$36.00 |
$36.00 |
| 71 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 161 | TON |
$50.00 |
$22.00 |
$24.64 |
$21.47 |
$29.00 |
$30.00 |
| 72 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$30.00 |
$40.00 |
$75.00 |
$14.00 |
$30.00 |
$30.00 |
| 73 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$25.00 |
$40.00 |
$65.00 |
$14.00 |
$39.00 |
$30.00 |
| 74 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$12,000.00 |
$8,000.00 |
$13,000.00 |
$8,500.00 |
| 75 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$1,475.00 |
$1,300.00 |
$1,475.00 |
$1,565.00 |
$1,475.00 |
| 76 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 112.5 | LF |
$20.00 |
$17.00 |
$20.00 |
$17.00 |
$18.00 |
$17.00 |
| 77 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 3 | EA |
$2,275.00 |
$2,250.00 |
$2,400.00 |
$2,250.00 |
$2,362.50 |
$2,250.00 |
| 78 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$3,000.00 |
$1,875.00 |
$1,875.00 |
$1,992.29 |
$2,625.00 |
$1,875.00 |
| 79 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$12,000.00 |
$4,500.00 |
$4,500.00 |
$8,100.00 |
$13,500.00 |
$14,500.00 |
| 80 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$3,000.00 |
$1,000.00 |
$4,000.00 |
$6,100.00 |
$1,250.00 |
| 81 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$95,311.35 |
$38,100.00 |
$90,000.00 |
$46,200.00 |
$66,500.00 |
$78,000.00 |