Bid tab 170196

Let Jun 15, 2017 · Division 8 · Craig Sign up free

‹ Jun 2017 results

BRIDGE AND APPROACHES COUNTY ROAD (NS-444): OVER LOCUST CREEK , 1.6 MILES SOUTH OF THE US-60 INTERSECTION NEAR VINITA . PROJECT LENGTH = 0.188 MILE

Let date
Thursday, June 15, 2017
Contract
170196
J/P numbers
30443(04)
District
Division 8
County
Craig
Highway
Limits
BRIDGE AND APPROACHES COUNTY ROAD (NS-444): OVER LOCUST CREEK , 1.6 MILES SOUTH OF THE US-60 INTERSECTION NEAR VINITA . PROJECT LENGTH = 0.188 MILE
Project number
CIRB-218D(058)RB

Bidders 5

#ContractorTotal bidvs estimatevs low
EEEngineer's estimate$830,845
1 RRY SERVICES LLC Low bidder $839,781 +1.1%
2 B & B BRIDGE COMPANY, LLC $852,603 +2.6% +1.5%
3 K & R BUILDERS, INC. $899,032 +8.2% +7.1%
4 H & H BRIDGE COMPANY $990,978 +19.3% +18.0%
5 BRIGHT LIGHTING, INC. DBA BL TOWER CONSTRUCTION $1,075,253 +29.4% +28.0%

Bid tab: unit prices 56 items

ExcelCSV
SeqBid codeDescriptionQtyUnitEstimate #1 RRY SERVICES LLC#2 B & B BRIDGE CO…#3 K & R BUILDERS,…#4 H & H BRIDGE CO…#5 BRIGHT LIGHTING…
1201(A) 0102 CLEARING AND GRUBBING1LSUM $10,000.00 $13,000.00 $7,960.00 $12,000.00 $10,000.00 $20,000.00
2202(A) 0183 UNCLASSIFIED EXCAVATION1,529CY $12.00 $8.00 $7.50 $9.90 $10.00 $14.00
3202(D) 0184 UNCLASSIFIED BORROW1,661CY $14.00 $10.00 $9.50 $12.00 $12.50 $9.00
4205(A) 4229 TYPE A-SALVAGED TOPSOIL1LSUM $5,000.00 $6,000.00 $6,500.00 $7,050.00 $9,500.00 $12,000.00
5221(C) 2801 TEMPORARY SILT FENCE1,612LF $1.50 $1.28 $1.28 $1.53 $2.95 $2.75
6221(F) 0100 TEMPORARY SILT DIKE154LF $9.00 $15.20 $15.20 $15.50 $8.95 $8.00
7230(A) 2806 SOLID SLAB SODDING9,340SY $1.80 $1.78 $1.78 $1.96 $1.95 $3.00
8233(A) 2817 VEGETATIVE MULCHING3.05AC $650.00 $798.00 $798.00 $495.00 $100.00 $900.00
9303(A) 2100 AGGREGATE BASE TYPE A415CY $60.00 $50.00 $26.23 $52.00 $42.33 $43.00
10310(B) 0149 SUBGRADE, METHOD B2,668SY $3.14 $1.50 $3.20 $3.50 $2.50 $1.50
11402(E) 0225 TRAFFIC BOUND SURFACE COURSE TYPE E117TON $60.00 $29.00 $18.00 $36.00 $27.50 $25.00
12411(B) 5945 SUPERPAVE, TYPE S3(PG 64-22 OK)412TON $100.00 $89.25 $89.25 $102.00 $86.61 $95.00
13411(C) 5960 SUPERPAVE, TYPE S4(PG 64-22 OK)262TON $115.00 $89.50 $89.50 $124.00 $101.64 $120.00
14509(D) 0325 CLASS C CONCRETE10CY $360.00 $250.00 $300.00 $312.50 $150.00 $650.00
15601(B) 0536 TYPE I-A PLAIN RIPRAP59TON $80.00 $40.00 $31.00 $44.50 $35.00 $65.00
16601(C) 0538 TYPE I-A FILTER BLANKET30TON $60.00 $30.00 $18.00 $34.00 $30.00 $65.00
17613(A) 0494 36" R.C.PIPE CLASS III54LF $120.00 $110.00 $100.29 $85.00 $90.00 $120.00
18613(EE) 5610 (SP) 18" CORRUGATED POLYPROPYLENE PIPE36LF $60.00 $50.00 $21.69 $45.75 $40.00 $50.00
19613(L) 5726 18" PREFAB. CULVERT END SECTION, ROUND2EA $500.00 $360.00 $310.66 $332.00 $300.00 $350.00
20613(L) 5734 36" PREFAB. CULVERT END SECTION, ROUND2EA $1,400.00 $1,700.00 $2,478.86 $1,615.00 $1,200.00 $1,500.00
21613(T) 1187 STANDARD BEDDING MATERIAL, CLASS C41CY $50.00 $37.00 $60.31 $56.00 $75.00 $40.00
22613(V) 1180 TRENCH EXCAVATION87CY $15.00 $16.00 $6.55 $11.25 $20.00 $40.00
23619(A) 0920 REMOVAL OF STRUCTURES & OBSTRUCTIONS1LSUM $5,000.00 $4,000.00 $5,105.23 $5,000.00 $5,750.00 $45,000.00
24619(B) 4728 REMOVAL OF ASPHALT PAVEMENT1,877SY $6.00 $5.00 $8.00 $5.75 $6.00 $7.00
25624(C) 4459 FENCE-STYLE SWF (5 BARBED WIRE)2,365LF $5.00 $4.28 $4.28 $5.00 $4.93 $7.00
26624(D) 4470 GATE, GALVANIZED STEEL1EA $800.00 $1,000.00 $1,000.00 $1,400.00 $2,500.00 $1,500.00
27501(B) 1307 SUBSTRUCTURE EXCAVATION COMMON100CY $20.00 $15.00 $20.00 $14.50 $75.00 $60.00
28501(G) 6309 CLSM BACKFILL46CY $180.00 $135.00 $100.00 $183.00 $200.00 $130.00
29503(A) 1311 PRESTRESSED CONCRETE BEAMS (TYPE II)492LF $220.00 $190.00 $210.00 $188.00 $200.00 $230.00
30504(A) 1304 APPROACH SLAB115SY $185.00 $190.00 $220.00 $214.50 $150.00 $140.00
31504(B) 1305 SAW-CUT GROOVING483.8SY $6.00 $4.80 $4.80 $5.40 $8.00 $8.00
32504(D) 6239 CONCRETE RAIL (TR3)382.6LF $75.00 $75.00 $85.00 $79.00 $150.00 $110.00
33506(A) 1322 STRUCTURAL STEEL660LB $3.50 $3.00 $5.00 $3.00 $1.50 $4.00
34507(A) 6172 WEATHERING STEEL FIXED BEARING ASSEMBLY6EA $1,000.00 $250.00 $400.00 $385.00 $2,000.00 $1,000.00
35507(B) 6176 WEATHERING STEEL EXPANSION BEARING ASSEMBLY12EA $1,000.00 $850.00 $500.00 $493.00 $2,000.00 $1,000.00
36507(C) 6282 ELASTOMERIC BEARING PADS12EA $550.00 $350.00 $200.00 $525.00 $1,000.00 $625.00
37509(A) 1326 CLASS AA CONCRETE141.9CY $475.00 $550.00 $800.00 $692.50 $400.00 $925.00
38509(B) 1328 CLASS A CONCRETE68.2CY $600.00 $550.00 $800.00 $710.00 $500.00 $850.00
39511(A) 1332 REINFORCING STEEL45,430LB $1.00 $0.8500 $0.7000 $0.8200 $1.00 $0.6500
40514(A) 6010 PILES, FURNISHED (HP 10X42)180LF $30.00 $45.00 $30.00 $50.40 $25.00 $47.00
41514(B) 6292 PILES, DRIVEN (HP 10X42)180LF $20.00 $10.00 $20.00 $21.60 $3.00 $140.00
42514(K) 6260 (PL)PILOT HOLES110LF $170.00 $500.00 $436.00 $560.00 $900.00 $500.00
43514(L) 6220 PILE SPLICE, H-PILE (NON-BIDDABLE)1EA $400.00 $400.00 $400.00 $400.00 $400.00 $400.00
44516(A) 6093 DRILLED SHAFTS 42" DIAMETER64LF $500.00 $1,200.00 $800.00 $1,094.00 $1,500.00 $1,100.00
45601(B) 1353 TYPE I-A PLAIN RIPRAP1,140TON $40.00 $40.00 $31.00 $36.50 $32.40 $42.00
46601(C) 1355 TYPE I-A FILTER BLANKET272TON $30.00 $31.00 $18.00 $25.50 $29.00 $36.00
47613(H) 6204 6" PERFORATED PIPE UNDERDRAIN ROUND52LF $35.00 $30.00 $40.00 $30.00 $75.00 $36.00
48613(I) 6207 6" NON-PERF.PIPE UNDERDRAIN RND.40LF $25.00 $30.00 $40.00 $39.00 $65.00 $36.00
49619(D) 1397 REMOVAL OF EXISTING BRIDGE STRUCTURE1LSUM $15,000.00 $10,000.00 $9,232.86 $9,500.00 $27,000.00 $32,000.00
50623(F) 5686 GUARDRAIL ANCHOR UNIT (TYPE D-BF)4EA $1,880.70 $1,475.00 $1,475.00 $1,650.00 $1,500.00 $2,200.00
51623(G) 8571 GUARDRAIL END TREATMENT (GET)4EA $2,284.05 $2,250.00 $2,250.00 $2,750.00 $2,500.00 $3,000.00
52856(A) 8530 TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE)4,000LF $1.20 $1.00 $1.00 $1.15 $1.00 $1.50
53880(J) 8905 CONSTRUCTION TRAFFIC CONTROL1LSUM $3,000.00 $2,600.00 $2,600.00 $4,000.00 $2,600.00 $3,500.00
54642(B) 0096 CONSTRUCTION STAKING LEVEL II1LSUM $6,000.00 $7,300.00 $4,900.00 $9,700.00 $5,000.00 $13,000.00
55220 2800 SWPPP DOCUMENTATION AND MANAGEMENT1LSUM $2,000.00 $1,275.00 $2,500.00 $4,550.00 $1,000.00 $4,700.00
56641 1399 MOBILIZATION1LSUM $69,000.00 $70,000.00 $79,600.00 $54,500.00 $85,000.00 $35,000.00