| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$14,000.00 |
$18,000.00 |
$7,500.00 |
$8,000.00 |
$20,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 12,249 | CY |
$11.00 |
$7.00 |
$6.00 |
$6.00 |
$10.50 |
$10.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 100 | CY |
$12.50 |
$15.00 |
$10.00 |
$18.00 |
$12.50 |
$23.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$10,000.00 |
$19,900.00 |
$20,000.00 |
$7,500.00 |
$15,000.00 |
$40,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 1,139 | LF |
$2.00 |
$2.05 |
$4.00 |
$1.99 |
$1.99 |
$2.25 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 56 | LF |
$10.00 |
$13.00 |
$6.00 |
$12.95 |
$12.95 |
$15.00 |
| 7 | 221(G) 0151 |
TEMPORARY ROCK FILTER DAM TYPE 2 | 27 | CY |
$115.00 |
$110.00 |
$150.00 |
$203.19 |
$125.00 |
$75.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 13,566 | SY |
$2.00 |
$1.43 |
$2.00 |
$1.39 |
$1.39 |
$1.60 |
| 9 | 230(F) 2812 |
WATERING | 543 | KGAL |
$3.00 |
$6.00 |
$8.00 |
$5.95 |
$5.95 |
$6.80 |
| 10 | 233(A) 2817 |
VEGETATIVE MULCHING | 3 | AC |
$500.00 |
$850.00 |
$100.00 |
$795.00 |
$795.00 |
$900.00 |
| 11 | 234(A) 2824 |
FERTILIZING (10-20-10) | 2 | TON |
$600.00 |
$709.00 |
$650.00 |
$695.00 |
$695.00 |
$1,200.00 |
| 12 | 234(A) 4409 |
FERTILIZING (18-46-0) | 1 | TON |
$600.00 |
$810.00 |
$650.00 |
$795.00 |
$795.00 |
$905.00 |
| 13 | 241 2832 |
MOWING | 2.81 | AC |
$70.00 |
$200.00 |
$10.00 |
$199.00 |
$199.00 |
$230.00 |
| 14 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,420 | CY |
$60.00 |
$50.00 |
$55.00 |
$45.00 |
$51.00 |
$59.00 |
| 15 | 325 5271 |
SEPARATOR FABRIC | 4,658 | SY |
$2.00 |
$1.50 |
$1.50 |
$0.7000 |
$1.00 |
$1.15 |
| 16 | 325 5280 |
MOISTURE BARRIER MEMBRANE | 6,316 | SY |
$4.00 |
$4.00 |
$4.00 |
$3.50 |
$3.90 |
$4.50 |
| 17 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 352 | TON |
$32.00 |
$24.00 |
$35.00 |
$35.00 |
$30.00 |
$20.00 |
| 18 | 407(B) 0250 |
TACK COAT | 585 | GAL |
$4.25 |
$3.67 |
$4.00 |
$3.60 |
$3.60 |
$4.10 |
| 19 | 408 5774 |
PRIME COAT | 3,557 | GAL |
$5.50 |
$5.61 |
$5.75 |
$5.50 |
$5.50 |
$6.25 |
| 20 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,298 | TON |
$70.00 |
$85.05 |
$85.00 |
$85.00 |
$83.35 |
$95.00 |
| 21 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 488 | TON |
$90.00 |
$95.25 |
$105.00 |
$95.00 |
$93.35 |
$107.00 |
| 22 | 613(B) 0694 |
48" CORR. GALV. STEEL PIPE | 132 | LF |
$75.00 |
$73.00 |
$75.00 |
$45.00 |
$140.00 |
$54.00 |
| 23 | 613(H) 0500 |
8" PERFORATED PIPE UNDERDRAIN ROUND | 77 | LF |
$15.00 |
$27.00 |
$5.00 |
$10.00 |
$25.00 |
$16.50 |
| 24 | 613(I) 1097 |
8" NON-PERF.PIPE UNDERDRAIN RND. | 26 | LF |
$15.00 |
$37.00 |
$5.00 |
$10.00 |
$25.00 |
$14.50 |
| 25 | 613(M) 7200 |
TYPE E6 CULVERT END TREATMENT | 2 | EA |
$2,100.00 |
$3,000.00 |
$2,500.00 |
$5,000.00 |
$2,900.00 |
$3,200.00 |
| 26 | 613(Q) 5946 |
OUTLET LATERAL HEADWALL | 1 | EA |
$750.00 |
$500.00 |
$500.00 |
$600.00 |
$650.00 |
$500.00 |
| 27 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 16 | CY |
$55.00 |
$55.00 |
$75.00 |
$55.00 |
$60.00 |
$66.00 |
| 28 | 613(U) 1100 |
PIPE UNDERDRAIN COVER MAT'L. | 9 | CY |
$60.00 |
$87.00 |
$80.00 |
$75.00 |
$60.00 |
$66.50 |
| 29 | 613(V) 1180 |
TRENCH EXCAVATION | 31 | CY |
$14.00 |
$15.00 |
$6.00 |
$10.00 |
$15.00 |
$23.00 |
| 30 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$7,800.00 |
$1,500.00 |
$5,000.00 |
$7,500.00 |
$15,000.00 |
| 31 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 2,894 | SY |
$5.00 |
$4.00 |
$2.00 |
$3.00 |
$6.00 |
$6.50 |
| 32 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 823 | LF |
$5.00 |
$4.00 |
$3.00 |
$3.00 |
$4.00 |
$15.00 |
| 33 | 619(C) 0924 |
SAWING PAVEMENT | 48 | LF |
$4.00 |
$10.00 |
$10.00 |
$8.00 |
$5.00 |
$12.00 |
| 34 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 400 | LF |
$20.00 |
$19.00 |
$20.00 |
$19.13 |
$18.35 |
$21.00 |
| 35 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 4 | EA |
$2,400.00 |
$2,550.00 |
$2,500.00 |
$2,200.00 |
$2,200.00 |
$2,500.00 |
| 36 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$2,000.00 |
$1,450.00 |
$2,100.00 |
$1,650.00 |
$1,550.00 |
$1,800.00 |
| 37 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,320 | LF |
$5.00 |
$4.60 |
$6.00 |
$4.42 |
$4.42 |
$7.00 |
| 38 | 853 9069 |
GUARDRAIL DELINEATORS(TYPE 2, CODE 1) | 16 | EA |
$15.00 |
$11.00 |
$18.00 |
$12.00 |
$15.00 |
$17.00 |
| 39 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 200 | CY |
$20.00 |
$8.00 |
$12.00 |
$15.00 |
$15.00 |
$28.00 |
| 40 | 501(G) 6309 |
CLSM BACKFILL | 203.8 | CY |
$145.00 |
$137.00 |
$150.00 |
$175.00 |
$170.00 |
$150.00 |
| 41 | 503(A) 1312 |
PRESTRESSED CONCRETE BEAMS (TYPE III) | 397.4 | LF |
$210.00 |
$176.00 |
$190.00 |
$200.00 |
$240.00 |
$275.00 |
| 42 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 338.7 | LF |
$225.00 |
$212.00 |
$220.00 |
$250.00 |
$265.00 |
$295.00 |
| 43 | 504(A) 1304 |
APPROACH SLAB | 281.2 | SY |
$200.00 |
$173.00 |
$185.00 |
$185.00 |
$285.00 |
$180.00 |
| 44 | 504(B) 1305 |
SAW-CUT GROOVING | 979.7 | SY |
$4.50 |
$3.90 |
$4.00 |
$3.85 |
$3.80 |
$4.50 |
| 45 | 504(C) 6250 |
SEALED EXPANSION JOINT | 48.7 | LF |
$260.00 |
$203.00 |
$250.00 |
$180.00 |
$275.00 |
$300.00 |
| 46 | 504(D) 6245 |
CONCRETE RAIL (TR4) | 624.7 | LF |
$85.00 |
$77.00 |
$90.00 |
$90.00 |
$85.00 |
$95.00 |
| 47 | 506(A) 4050 |
STRUCTURAL STEEL M270 GRADE 50W | 1,510 | LB |
$2.00 |
$2.16 |
$2.00 |
$2.00 |
$3.50 |
$4.00 |
| 48 | 507(A) 6170 |
STAINLESS STEEL FIXED BEARING ASSEMBLY | 8 | EA |
$1,800.00 |
$1,140.00 |
$1,200.00 |
$1,200.00 |
$1,700.00 |
$1,600.00 |
| 49 | 507(B) 6174 |
STAINLESS STEEL EXPANSION BEARING ASSEMBLY | 16 | EA |
$1,700.00 |
$1,140.00 |
$1,150.00 |
$1,200.00 |
$1,700.00 |
$1,400.00 |
| 50 | 509(A) 1326 |
CLASS AA CONCRETE | 209.6 | CY |
$600.00 |
$500.00 |
$575.00 |
$750.00 |
$700.00 |
$780.00 |
| 51 | 509(B) 1328 |
CLASS A CONCRETE | 206.2 | CY |
$650.00 |
$500.00 |
$575.00 |
$625.00 |
$700.00 |
$600.00 |
| 52 | 509(D) 1331 |
CLASS C CONCRETE | 15 | CY |
$620.00 |
$250.00 |
$300.00 |
$1,100.00 |
$400.00 |
$1,000.00 |
| 53 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 110,920 | LB |
$1.05 |
$0.8200 |
$0.9000 |
$1.00 |
$1.15 |
$1.30 |
| 54 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 114 | LF |
$32.00 |
$27.00 |
$35.00 |
$35.00 |
$45.00 |
$22.00 |
| 55 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 357 | LF |
$36.00 |
$30.00 |
$45.00 |
$45.00 |
$55.00 |
$28.00 |
| 56 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 114 | LF |
$15.00 |
$8.00 |
$10.00 |
$15.00 |
$10.00 |
$39.00 |
| 57 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 357 | LF |
$18.00 |
$8.00 |
$12.00 |
$19.25 |
$10.00 |
$28.00 |
| 58 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 59 | 515(A) 6013 |
WATER REPELLENT (VISUALLY INSPECTED) | 1,063 | SY |
$2.90 |
$3.60 |
$4.00 |
$3.50 |
$3.50 |
$4.00 |
| 60 | 516(A) 6096 |
DRILLED SHAFTS 60" DIAMETER | 116 | LF |
$900.00 |
$916.00 |
$730.00 |
$850.00 |
$1,000.00 |
$1,100.00 |
| 61 | 516(C) 6200 |
CROSSHOLE SONIC LOGGING | 1 | EA |
$3,000.00 |
$2,000.00 |
$2,500.00 |
$1,800.00 |
$2,700.00 |
$2,000.00 |
| 62 | 523(A) 6550 |
SEALER CRACK PREPARATION | 48 | LF |
$3.50 |
$6.00 |
$6.00 |
$4.00 |
$5.00 |
$5.80 |
| 63 | 523(B) 6560 |
SEALER RESIN | 0.4 | GAL |
$80.00 |
$400.00 |
$350.00 |
$150.00 |
$300.00 |
$350.00 |
| 64 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 370 | TON |
$45.00 |
$43.00 |
$48.00 |
$45.00 |
$62.00 |
$51.00 |
| 65 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 55 | TON |
$40.00 |
$35.00 |
$40.00 |
$35.00 |
$50.00 |
$40.00 |
| 66 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 96 | LF |
$16.00 |
$25.00 |
$25.00 |
$30.00 |
$30.00 |
$26.00 |
| 67 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 42 | LF |
$16.00 |
$25.00 |
$10.00 |
$30.00 |
$30.00 |
$25.00 |
| 68 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$60,000.00 |
$35,000.00 |
$30,000.00 |
$22,000.00 |
$45,000.00 |
$95,000.00 |
| 69 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 24,900 | SD |
$0.3000 |
$0.1200 |
$0.0800 |
$0.0500 |
$0.1000 |
$0.1100 |
| 70 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 1,200 | SD |
$0.7500 |
$2.05 |
$0.1000 |
$0.0900 |
$2.00 |
$2.30 |
| 71 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 300 | SD |
$1.80 |
$0.1200 |
$0.2500 |
$0.2000 |
$0.1000 |
$0.1100 |
| 72 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,100 | SD |
$0.9000 |
$0.2800 |
$0.3500 |
$0.3000 |
$0.2500 |
$0.3000 |
| 73 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 4,500 | SD |
$0.3000 |
$0.2800 |
$0.0500 |
$0.0300 |
$0.2500 |
$0.3000 |
| 74 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 328 | SD |
$13.00 |
$15.50 |
$12.00 |
$10.25 |
$15.00 |
$17.00 |
| 75 | 805(A) 8724 |
(PL)REMOVAL OF EXISTING SIGNS | 4 | EA |
$50.00 |
$100.00 |
$100.00 |
$75.00 |
$50.00 |
$57.00 |
| 76 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 12.5 | SF |
$18.00 |
$27.00 |
$40.00 |
$36.00 |
$25.00 |
$29.00 |
| 77 | 851(C) 8324 |
2" SQUARE TUBE POST | 28 | LF |
$8.50 |
$12.00 |
$28.00 |
$26.00 |
$10.00 |
$12.00 |
| 78 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 4,500 | LF |
$0.5000 |
$1.25 |
$1.40 |
$1.25 |
$1.20 |
$1.50 |
| 79 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$25,000.00 |
$13,000.00 |
$15,000.00 |
$12,000.00 |
$7,570.00 |
$27,000.00 |
| 80 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$2,500.00 |
$2,500.00 |
$3,500.00 |
$1,275.00 |
$2,500.00 |
| 81 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$100,000.00 |
$84,000.00 |
$54,000.00 |
$100,000.00 |
$115,000.00 |
$120,000.00 |