| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$10,000.00 |
$28,650.00 |
$14,700.00 |
$10,600.00 |
$10,448.90 |
$4,821.72 |
$31,340.00 |
$45,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 599 | CY |
$7.00 |
$7.85 |
$9.97 |
$8.48 |
$6.68 |
$6.89 |
$18.00 |
$15.50 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 6,568 | CY |
$10.00 |
$3.00 |
$9.97 |
$10.94 |
$10.30 |
$10.33 |
$19.80 |
$13.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$4,800.00 |
$8,610.00 |
$9,010.00 |
$5,505.48 |
$3,444.09 |
$21,315.00 |
$27,297.70 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 900 | LF |
$2.00 |
$1.65 |
$1.42 |
$1.64 |
$1.79 |
$1.03 |
$1.50 |
$1.60 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 32 | LF |
$9.00 |
$10.00 |
$8.40 |
$8.48 |
$15.70 |
$6.89 |
$13.30 |
$14.00 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 4,460 | SY |
$2.00 |
$1.65 |
$1.57 |
$1.59 |
$2.28 |
$5.44 |
$1.95 |
$2.05 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 0.92 | AC |
$500.00 |
$400.00 |
$525.00 |
$530.00 |
$60.38 |
$3,444.09 |
$51.00 |
$500.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 679 | CY |
$55.00 |
$50.37 |
$51.45 |
$46.70 |
$55.56 |
$34.17 |
$76.70 |
$52.00 |
| 10 | 310(B) 0149 |
SUBGRADE, METHOD B | 3,184 | SY |
$3.00 |
$3.00 |
$1.94 |
$2.65 |
$2.66 |
$3.44 |
$6.85 |
$3.45 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 3,498 | SY |
$3.00 |
$3.00 |
$1.47 |
$1.27 |
$1.81 |
$1.34 |
$2.65 |
$0.9000 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 217.82 | TON |
$37.00 |
$27.69 |
$27.82 |
$26.70 |
$34.27 |
$34.17 |
$82.40 |
$31.00 |
| 13 | 407(B) 0250 |
TACK COAT | 191 | GAL |
$4.50 |
$5.50 |
$5.30 |
$5.35 |
$6.10 |
$6.96 |
$4.70 |
$4.00 |
| 14 | 408 5774 |
PRIME COAT | 1,531 | GAL |
$6.00 |
$4.00 |
$6.30 |
$5.35 |
$12.21 |
$8.27 |
$8.50 |
$4.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 431 | TON |
$94.00 |
$93.27 |
$85.15 |
$85.97 |
$97.95 |
$111.73 |
$75.70 |
$65.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 283 | TON |
$118.00 |
$102.95 |
$93.97 |
$94.87 |
$108.10 |
$123.30 |
$83.50 |
$76.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$325.00 |
$270.00 |
$525.00 |
$378.80 |
$289.52 |
$264.51 |
$320.50 |
$525.00 |
| 18 | 613(A) 0493 |
30" R.C.PIPE CLASS III | 69 | LF |
$90.00 |
$115.00 |
$121.80 |
$117.43 |
$118.73 |
$96.43 |
$75.50 |
$130.00 |
| 19 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 20 | LF |
$40.00 |
$23.00 |
$27.30 |
$25.16 |
$31.85 |
$42.91 |
$77.60 |
$102.00 |
| 20 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$400.00 |
$225.00 |
$236.25 |
$312.41 |
$353.29 |
$399.52 |
$752.50 |
$1,000.00 |
| 21 | 613(L) 5732 |
30" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,200.00 |
$1,400.00 |
$1,338.75 |
$1,545.22 |
$1,904.30 |
$1,377.64 |
$1,557.00 |
$2,000.00 |
| 22 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$3,500.00 |
$6,930.00 |
$3,392.00 |
$3,730.64 |
$2,066.45 |
$9,102.00 |
$16,000.00 |
| 23 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,922 | SY |
$5.00 |
$4.00 |
$4.20 |
$6.36 |
$12.77 |
$13.78 |
$4.25 |
$8.00 |
| 24 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 50 | LF |
$20.00 |
$22.00 |
$18.38 |
$21.20 |
$24.16 |
$27.55 |
$20.40 |
$19.00 |
| 25 | 623(F) 6033 |
GUARDRAIL ANCHOR UNIT (TYPE II) | 4 | EA |
$650.00 |
$2,550.00 |
$2,367.48 |
$2,438.00 |
$2,777.89 |
$3,168.56 |
$2,447.00 |
$2,450.00 |
| 26 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$4,500.00 |
$3,000.00 |
$2,362.50 |
$2,385.00 |
$2,717.50 |
$3,099.68 |
$3,059.00 |
$2,425.00 |
| 27 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 2,290 | CY |
$10.00 |
$7.85 |
$8.93 |
$4.40 |
$8.35 |
$9.64 |
$7.35 |
$9.00 |
| 28 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 190 | CY |
$18.00 |
$7.85 |
$21.00 |
$24.20 |
$11.56 |
$11.71 |
$17.70 |
$26.00 |
| 29 | 501(F) 6352 |
GRANULAR BACKFILL | 88 | CY |
$68.00 |
$61.05 |
$51.82 |
$86.26 |
$97.99 |
$31.41 |
$72.70 |
$77.00 |
| 30 | 503(A) 1313 |
PRESTRESSED CONCRETE BEAMS (TYPE IV) | 299 | LF |
$230.00 |
$245.00 |
$241.82 |
$257.60 |
$262.70 |
$274.85 |
$223.50 |
$290.00 |
| 31 | 504(B) 1305 |
SAW-CUT GROOVING | 249.8 | SY |
$7.00 |
$8.50 |
$9.97 |
$8.25 |
$12.08 |
$10.33 |
$7.65 |
$8.10 |
| 32 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 266.4 | LF |
$90.00 |
$75.00 |
$72.67 |
$99.95 |
$105.35 |
$85.41 |
$76.60 |
$185.00 |
| 33 | 506(A) 1322 |
STRUCTURAL STEEL | 290 | LB |
$4.00 |
$2.95 |
$3.80 |
$3.97 |
$2.29 |
$8.06 |
$13.10 |
$8.00 |
| 34 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$1,100.00 |
$750.00 |
$852.91 |
$1,612.27 |
$862.18 |
$813.49 |
$1,330.00 |
$1,115.00 |
| 35 | 509(A) 1326 |
CLASS AA CONCRETE | 79 | CY |
$650.00 |
$645.00 |
$778.10 |
$798.93 |
$690.89 |
$482.17 |
$562.50 |
$1,175.00 |
| 36 | 509(B) 1328 |
CLASS A CONCRETE | 69.8 | CY |
$650.00 |
$675.00 |
$778.10 |
$681.98 |
$569.26 |
$378.85 |
$660.00 |
$1,020.00 |
| 37 | 511(A) 1332 |
REINFORCING STEEL | 28,300 | LB |
$1.00 |
$0.8800 |
$1.05 |
$1.08 |
$0.8400 |
$0.8200 |
$1.15 |
$1.00 |
| 38 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 276 | LF |
$30.00 |
$24.50 |
$24.73 |
$30.14 |
$37.27 |
$23.72 |
$30.60 |
$21.00 |
| 39 | 514(A) 6011 |
PILES, FURNISHED (HP 12X53) | 904 | LF |
$34.00 |
$30.80 |
$29.80 |
$35.82 |
$43.85 |
$29.94 |
$33.30 |
$28.00 |
| 40 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 276 | LF |
$14.00 |
$10.50 |
$12.60 |
$11.00 |
$18.63 |
$30.31 |
$10.50 |
$44.00 |
| 41 | 514(B) 6294 |
PILES, DRIVEN (HP 12X53) | 904 | LF |
$15.00 |
$13.20 |
$12.60 |
$13.20 |
$19.91 |
$30.31 |
$17.70 |
$38.00 |
| 42 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 43 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 370 | TON |
$50.00 |
$46.68 |
$44.42 |
$42.55 |
$42.53 |
$51.32 |
$40.00 |
$80.00 |
| 44 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 80 | TON |
$50.00 |
$37.63 |
$34.65 |
$30.40 |
$31.30 |
$51.32 |
$30.50 |
$80.00 |
| 45 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$30.00 |
$31.50 |
$31.78 |
$25.19 |
$27.55 |
$60.40 |
$33.00 |
| 46 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 60 | LF |
$25.00 |
$30.00 |
$31.50 |
$24.84 |
$25.19 |
$27.55 |
$26.40 |
$23.00 |
| 47 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$20,000.00 |
$4,800.00 |
$5,145.00 |
$8,250.00 |
$15,172.29 |
$15,153.98 |
$9,143.00 |
$27,000.00 |
| 48 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$10,000.00 |
$7,000.00 |
$5,880.00 |
$6,160.00 |
$6,763.54 |
$9,230.15 |
$6,831.00 |
$25,000.00 |
| 49 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$5,000.00 |
$2,500.00 |
$2,625.00 |
$2,750.00 |
$4,869.60 |
$9,299.03 |
$2,858.00 |
$5,000.00 |
| 50 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$85,000.00 |
$36,000.00 |
$46,957.22 |
$51,692.43 |
$20,773.40 |
$77,147.53 |
$24,722.54 |
$55,000.00 |