| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$20,000.00 |
$5,000.00 |
$3,000.00 |
$24,500.00 |
$4,132.18 |
$10,000.00 |
$11,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 2,541 | CY |
$10.00 |
$8.00 |
$6.75 |
$11.00 |
$13.09 |
$12.00 |
$25.00 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 3,015 | CY |
$12.00 |
$8.00 |
$8.50 |
$5.00 |
$24.39 |
$16.00 |
$25.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$3,000.00 |
$5,000.00 |
$2,315.00 |
$4,900.00 |
$2,386.20 |
$5,000.00 |
$10,000.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 700 | LF |
$10.00 |
$4.50 |
$3.50 |
$5.75 |
$8.25 |
$9.00 |
$8.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 500 | LF |
$1.90 |
$1.25 |
$1.28 |
$2.75 |
$1.94 |
$1.75 |
$3.00 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 196 | LF |
$8.20 |
$13.99 |
$12.95 |
$6.25 |
$9.97 |
$8.00 |
$15.00 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 6,500 | SY |
$1.70 |
$1.68 |
$1.68 |
$2.75 |
$3.26 |
$2.25 |
$2.75 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 1.3 | AC |
$279.60 |
$100.00 |
$100.00 |
$700.00 |
$551.40 |
$600.00 |
$2,000.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 473 | CY |
$61.50 |
$53.00 |
$31.00 |
$50.75 |
$42.03 |
$49.00 |
$60.00 |
| 11 | 325 5271 |
SEPARATOR FABRIC | 2,550 | SY |
$1.70 |
$1.40 |
$2.15 |
$1.50 |
$1.66 |
$1.50 |
$1.80 |
| 12 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 459 | TON |
$28.30 |
$36.00 |
$21.00 |
$28.25 |
$26.44 |
$32.00 |
$60.00 |
| 13 | 407(B) 0250 |
TACK COAT | 199 | GAL |
$3.80 |
$3.50 |
$5.00 |
$8.50 |
$6.68 |
$3.30 |
$7.00 |
| 14 | 408 5774 |
PRIME COAT | 1,557 | GAL |
$5.60 |
$6.00 |
$3.50 |
$2.00 |
$6.68 |
$6.00 |
$5.00 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 464 | TON |
$95.00 |
$81.00 |
$86.75 |
$107.00 |
$93.57 |
$110.00 |
$123.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 350 | TON |
$110.00 |
$101.00 |
$92.45 |
$122.00 |
$106.94 |
$130.00 |
$125.00 |
| 17 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$309.90 |
$250.00 |
$450.00 |
$282.00 |
$294.52 |
$900.00 |
$600.00 |
| 18 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 68 | LF |
$40.50 |
$35.00 |
$24.55 |
$52.75 |
$53.52 |
$40.00 |
$60.00 |
| 19 | 613(L) 5726 |
18" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$284.90 |
$360.00 |
$165.05 |
$304.00 |
$286.53 |
$400.00 |
$400.00 |
| 20 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 2,346 | LF |
$8.40 |
$4.00 |
$4.00 |
$7.00 |
$8.23 |
$6.00 |
$7.00 |
| 21 | 624(D) 4470 |
GATE, GALVANIZED STEEL | 2 | EA |
$500.00 |
$650.00 |
$650.00 |
$423.00 |
$155.95 |
$800.00 |
$1,300.00 |
| 22 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$5,000.00 |
$4,000.00 |
$4,000.00 |
$5,640.00 |
$12,836.12 |
$8,000.00 |
$5,500.00 |
| 23 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 180 | SD |
$13.30 |
$5.00 |
$5.00 |
$7.00 |
$5.50 |
$7.00 |
$30.00 |
| 24 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 391 | CY |
$10.00 |
$8.50 |
$7.70 |
$11.00 |
$21.24 |
$40.00 |
$25.00 |
| 25 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 78 | CY |
$20.00 |
$12.00 |
$10.00 |
$24.00 |
$7.73 |
$65.00 |
$25.00 |
| 26 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 68 | LF |
$97.70 |
$120.00 |
$100.00 |
$112.00 |
$114.07 |
$200.00 |
$180.00 |
| 27 | 509(A) 1326 |
CLASS AA CONCRETE | 169.2 | CY |
$616.80 |
$590.00 |
$756.94 |
$593.00 |
$453.50 |
$800.00 |
$575.00 |
| 28 | 511(A) 1332 |
REINFORCING STEEL | 22,114 | LB |
$1.00 |
$0.8500 |
$0.8500 |
$1.00 |
$0.7200 |
$0.8500 |
$1.70 |
| 29 | 511(B) 6010 |
EPOXY COATED REINFORCING STEEL | 900 | LB |
$1.40 |
$1.25 |
$1.00 |
$1.10 |
$0.9900 |
$1.20 |
$4.70 |
| 30 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$10,000.00 |
$5,000.00 |
$6,725.05 |
$10,300.00 |
$2,286.66 |
$15,000.00 |
$23,000.00 |
| 31 | 623(F) 6034 |
GUARDRAIL ANCHOR UNIT (TYPE III) | 4 | EA |
$2,500.00 |
$1,800.00 |
$2,600.00 |
$2,538.00 |
$2,255.00 |
$2,800.00 |
$2,200.00 |
| 32 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$7,500.00 |
$7,260.00 |
$4,700.00 |
$3,737.00 |
$8,281.68 |
$15,000.00 |
$4,000.00 |
| 33 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$1,250.00 |
$3,500.00 |
$2,115.00 |
$973.57 |
$7,500.00 |
$2,500.00 |
| 34 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$25,000.00 |
$41,000.00 |
$42,232.91 |
$25,930.00 |
$37,100.00 |
$60,000.00 |
$30,000.00 |