| 1 | 104 0955 |
(SP) RAILROAD FLAGGING(NON-BIDDABLE) | 10 | DAY |
$475.00 |
$475.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 3,703 | CY |
$12.00 |
$8.30 |
| 3 | 202(D) 0184 |
UNCLASSIFIED BORROW | 10,086 | CY |
$10.00 |
$9.70 |
| 4 | 202(H) 0185 |
EARTHWORK | 1 | LSUM |
$200,000.00 |
$450,000.00 |
| 5 | 221(C) 2801 |
TEMPORARY SILT FENCE | 7,876 | LF |
$1.75 |
$1.14 |
| 6 | 221(F) 0100 |
TEMPORARY SILT DIKE | 3,500 | LF |
$8.00 |
$6.60 |
| 7 | 230(A) 2806 |
SOLID SLAB SODDING | 177,483 | SY |
$1.50 |
$1.11 |
| 8 | 233(A) 2817 |
VEGETATIVE MULCHING | 36.67 | AC |
$400.00 |
$200.00 |
| 9 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 2,422 | CY |
$50.00 |
$59.00 |
| 10 | 307(D) 4230 |
LIME | 926 | TON |
$175.00 |
$124.00 |
| 11 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 68,379 | SY |
$5.00 |
$4.37 |
| 12 | 311(A) 0151 |
PROCESSING EXISTING BASE & SURFACE, METHOD A | 26,155 | LF |
$7.50 |
$4.50 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 1,227 | TON |
$30.00 |
$29.50 |
| 14 | 407(B) 0250 |
TACK COAT | 3,351 | GAL |
$3.50 |
$5.25 |
| 15 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 11,368 | TON |
$80.00 |
$79.00 |
| 16 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 7,620 | TON |
$84.00 |
$82.00 |
| 17 | 501(A) 0313 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 190 | CY |
$18.00 |
$50.00 |
| 18 | 509(B) 0321 |
CLASS A CONCRETE | 493.82 | CY |
$500.00 |
$735.00 |
| 19 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$350.00 |
$362.50 |
| 20 | 511(A) 0332 |
REINFORCING STEEL | 41,483 | LB |
$1.00 |
$0.8200 |
| 21 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 678 | TON |
$42.00 |
$40.50 |
| 22 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 206 | TON |
$38.00 |
$32.50 |
| 23 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 128 | LF |
$85.00 |
$77.50 |
| 24 | 613(A) 0494 |
36" R.C.PIPE CLASS III | 40 | LF |
$125.00 |
$129.00 |
| 25 | 613(A) 4498 |
43" X 26" R.C.PIPE ARCH CLASS A-III | 40 | LF |
$160.00 |
$208.50 |
| 26 | 613(B) 0691 |
30" CORR. GALV. STEEL PIPE | 24 | LF |
$35.00 |
$72.00 |
| 27 | 613(B) 4528 |
28" X 20" CORR. GALV. STEEL PIPE ARCH | 410 | LF |
$38.00 |
$30.75 |
| 28 | 613(B) 4529 |
35" X 24" CORR. GALV. STEEL PIPE ARCH | 764 | LF |
$45.00 |
$36.75 |
| 29 | 613(B) 4530 |
42" X 29" CORR. GALV. STEEL PIPE ARCH | 324 | LF |
$50.00 |
$46.65 |
| 30 | 613(L) 4531 |
43" X 26" PREFAB. CULVERT END SECTION, ARCH | 2 | EA |
$1,000.00 |
$1,800.00 |
| 31 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 4 | EA |
$750.00 |
$1,070.00 |
| 32 | 613(L) 5734 |
36" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$1,400.00 |
$1,410.00 |
| 33 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 24 | EA |
$1,100.00 |
$1,110.00 |
| 34 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 6 | EA |
$1,500.00 |
$1,700.00 |
| 35 | 613(M) 7192 |
TYPE BB4 CULVERT END TREATMENT | 4 | EA |
$2,500.00 |
$1,600.00 |
| 36 | 619(B) 0291 |
REMOVAL OF HEADWALL | 12 | EA |
$850.00 |
$1,950.00 |
| 37 | 619(B) 4778 |
REMOVAL OF EXISTING STRUCTURES | 5 | EA |
$2,000.00 |
$5,650.00 |
| 38 | 619(B) 5918 |
REMOVAL OF EXISTING PIPE | 1,059 | LF |
$11.00 |
$12.75 |
| 39 | 629(E) 5048 |
REMOVE AND RESET MAILBOX | 2 | EA |
$100.00 |
$250.00 |
| 40 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 105.58 | SF |
$20.00 |
$25.00 |
| 41 | 851(D) 8597 |
FLANGE CHANNEL POSTS(4 LB/FT) | 240 | LF |
$12.00 |
$25.00 |
| 42 | 856(A) 8530 |
TRAFFIC STRIPE(MULTI-POLYMER)(4" WIDE) | 12,570 | LF |
$0.6000 |
$1.28 |
| 43 | 856(A) 8555 |
TRAFFIC STRIPE(MULTI-POLY.)(24" WIDE) | 22 | LF |
$10.00 |
$16.50 |
| 44 | 856(B) 8525 |
TRAFFIC STRIPE (MULTI-POLYMER)(SYMBOLS, WORDS. ETC.) | 2 | EA |
$150.00 |
$500.00 |
| 45 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$40,000.00 |
$20,000.00 |
| 46 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 640 | CY |
$10.00 |
$9.50 |
| 47 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 49 | CY |
$18.00 |
$27.50 |
| 48 | 509(A) 1326 |
CLASS AA CONCRETE | 110.31 | CY |
$550.00 |
$547.50 |
| 49 | 511(A) 1332 |
REINFORCING STEEL | 10,377.31 | LB |
$1.00 |
$0.8300 |
| 50 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 312 | TON |
$50.00 |
$39.50 |
| 51 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 95 | TON |
$38.00 |
$30.50 |
| 52 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$9,550.00 |
| 53 | 202(A) 1301 |
UNCLASSIFIED EXCAVATION | 720 | CY |
$10.00 |
$9.50 |
| 54 | 501(A) 1306 |
STRUCTURAL EXCAVATION UNCLASSIFIED | 41 | CY |
$18.00 |
$32.50 |
| 55 | 509(A) 1326 |
CLASS AA CONCRETE | 96.66 | CY |
$550.00 |
$685.00 |
| 56 | 511(A) 1332 |
REINFORCING STEEL | 8,029 | LB |
$1.00 |
$0.8600 |
| 57 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 141 | TON |
$50.00 |
$39.50 |
| 58 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 43 | TON |
$38.00 |
$30.50 |
| 59 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$7,500.00 |
$7,250.00 |
| 60 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$80,000.00 |
$90,000.00 |
| 61 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$10,000.00 |
$16,000.00 |
| 62 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$500,000.00 |
$199,000.00 |