| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$50,000.00 |
$160,000.00 |
$144,200.00 |
| 2 | 202(D) 0184 |
UNCLASSIFIED BORROW | 4,415 | CY |
$7.00 |
$16.55 |
$29.00 |
| 3 | 221(C) 2801 |
TEMPORARY SILT FENCE | 166,734 | LF |
$1.25 |
$1.03 |
$0.9700 |
| 4 | 221(F) 0100 |
TEMPORARY SILT DIKE | 4,956 | LF |
$5.00 |
$6.30 |
$6.17 |
| 5 | 230(A) 2806 |
SOLID SLAB SODDING | 1,000 | SY |
$1.50 |
$8.11 |
$2.64 |
| 6 | 232(B) 2814 |
SEEDING METHOD B | 19.81 | AC |
$425.00 |
$194.20 |
$257.50 |
| 7 | 233(A) 2817 |
VEGETATIVE MULCHING | 19.81 | AC |
$300.00 |
$405.00 |
$283.25 |
| 8 | 241 2832 |
MOWING | 39.62 | AC |
$40.00 |
$77.00 |
$62.32 |
| 9 | 407(B) 0250 |
TACK COAT | 70,621 | GAL |
$2.50 |
$2.00 |
$3.00 |
| 10 | 411(B) 5935 |
SUPERPAVE, TYPE S3(PG 76-28 OK) | 76,941 | TON |
$75.00 |
$55.00 |
$71.50 |
| 11 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 23,971 | TON |
$65.00 |
$53.00 |
$64.20 |
| 12 | 411(C) 5950 |
SUPERPAVE, TYPE S4(PG 76-28 OK) | 29,743 | TON |
$80.00 |
$66.00 |
$80.55 |
| 13 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 13,422 | TON |
$70.00 |
$52.00 |
$65.40 |
| 14 | 412 5267 |
COLD MILLING PAVEMENT | 367,737 | SY |
$2.50 |
$1.98 |
$1.42 |
| 15 | 611(G) 6002 |
INLET (SMD-TYPE 2) | 4 | EA |
$2,700.00 |
$3,043.08 |
$3,811.00 |
| 16 | 613(M) 7187 |
TYPE B4 CULVERT END TREATMENT | 5 | EA |
$1,000.00 |
$2,261.99 |
$2,060.00 |
| 17 | 613(M) 7188 |
TYPE C4 CULVERT END TREATMENT | 2 | EA |
$1,400.00 |
$2,682.57 |
$2,884.00 |
| 18 | 613(W) 4502 |
30" JACKED CONDUIT | 539 | LF |
$400.00 |
$328.19 |
$643.75 |
| 19 | 613(W) 4504 |
36" JACKED CONDUIT | 85 | LF |
$700.00 |
$722.53 |
$721.00 |
| 20 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$25,000.00 |
$49,487.89 |
$130,000.00 |
| 21 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 4,545 | SY |
$2.75 |
$4.62 |
$6.40 |
| 22 | 619(B) 4780 |
REMOVAL OF GUARDRAIL | 5,943 | LF |
$3.00 |
$4.21 |
$2.68 |
| 23 | 623(A) 0932 |
BEAM GUARDRAIL W-BEAM SINGLE | 5,675 | LF |
$17.00 |
$19.83 |
$14.94 |
| 24 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$2,000.00 |
$1,742.45 |
$2,266.00 |
| 25 | 623(F) 8300 |
GUARDRAIL TRAIL END TURNDOWN (31") | 1 | EA |
$895.00 |
$540.76 |
$772.50 |
| 26 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,150.00 |
$2,643.71 |
$2,317.50 |
| 27 | 623(G) 8590 |
GUARDRAIL END TREATMENT (31") | 13 | EA |
$2,500.00 |
$2,643.71 |
$2,163.00 |
| 28 | 623(I) 8700 |
GUARDRAIL BRIDGE CONN-THRIE BEAM (31") | 4 | EA |
$1,900.00 |
$1,982.78 |
$1,751.00 |
| 29 | 624(A) 4281 |
FENCE-STYLE WWF | 90,577 | LF |
$4.25 |
$6.31 |
$7.50 |
| 30 | 853 9066 |
GUARDRAIL DELINEATORS(TYPE 1, CODE 1) | 124 | EA |
$10.00 |
$15.02 |
$15.45 |
| 31 | 857(A) 8839 |
CONSTRUCTION TRAFFIC STRIPE(PAINT)(4" WIDE) | 290,000 | LF |
$0.1500 |
$0.0200 |
$0.0700 |
| 32 | 857(E) 8887 |
(PL)CONSTRUCTION ZONE PAVEMENT MARKERS(FLEX TAB)TYPE 2-1 | 11,210 | EA |
$0.5000 |
$0.4200 |
$0.5700 |
| 33 | 857(F) 8006 |
PAVEMENT MARKING REMOVAL(TRAFFIC STRIPE) | 1,500 | LF |
$1.25 |
$1.20 |
$1.03 |
| 34 | 871(B) 8705 |
(SP)CONST.ZONE IMPACT ATTEN. | 210 | SD |
$9.00 |
$18.03 |
$10.30 |
| 35 | 876(A) 8482 |
(PL)TRUCK MOUNTED ATTENUATOR | 210 | SD |
$16.00 |
$12.02 |
$51.50 |
| 36 | 877(B) 8484 |
DELIVER PORTABLE LONGITUDINAL BARRIER | 42,437.5 | LF |
$24.00 |
$26.00 |
$12.00 |
| 37 | 877(C) 8486 |
RELOCATION OF PORTABLE LONGITUDINAL BARRIER | 126,812.5 | LF |
$4.00 |
$1.33 |
$1.00 |
| 38 | 880(A) 8812 |
ARROW DISPLAY(TYPE C) | 210 | SD |
$16.00 |
$3.61 |
$5.15 |
| 39 | 880(B) 8818 |
CONSTRUCTION SIGNS 0 TO 6.25 SF | 4,200 | SD |
$0.7000 |
$0.6000 |
$3.09 |
| 40 | 880(B) 8821 |
CONSTRUCTION SIGNS 6.26 SF TO 15.99 SF | 18,480 | SD |
$1.50 |
$0.0200 |
$0.1000 |
| 41 | 880(B) 8824 |
CONSTRUCTION SIGNS 16.0 SF TO 32.99 SF | 24,780 | SD |
$2.00 |
$0.0200 |
$0.1000 |
| 42 | 880(C) 8842 |
CONSTRUCTION BARRICADES(TYPE III) | 2,100 | SD |
$0.5000 |
$0.0200 |
$5.15 |
| 43 | 880(C) 8848 |
WING BARRICADES | 840 | SD |
$1.00 |
$1.20 |
$2.06 |
| 44 | 880(E) 8860 |
WARNING LIGHTS(TYPE A) | 7,560 | SD |
$0.2000 |
$0.1200 |
$3.09 |
| 45 | 880(F) 8878 |
DRUMS | 5,460 | SD |
$0.2000 |
$0.9000 |
$2.06 |
| 46 | 880(G) 8890 |
CHANNELIZER CONES | 5,250 | SD |
$0.2500 |
$0.9000 |
$2.06 |
| 47 | 880(L) 8911 |
TRAFFIC SURVEILLANCE, POLICE | 500 | HOUR |
$55.00 |
$30.00 |
$110.00 |
| 48 | 882(A) 8306 |
PORT.CHANGEABLE MESSAGE SIGN | 896 | SD |
$16.00 |
$12.02 |
$15.45 |
| 49 | 413(A) 4861 |
RUMBLE STRIP-METHOD HMA-CON | 164,660 | LF |
$0.2000 |
$0.1100 |
$0.0800 |
| 50 | 804(A) 2915 |
STRUCTURAL CONCRETE | 24.36 | CY |
$515.00 |
$420.59 |
$257.50 |
| 51 | 804(B) 2916 |
REINFORCING STEEL | 3,914 | LB |
$1.60 |
$2.40 |
$1.29 |
| 52 | 805(A) 8722 |
(PL)REMOVAL OF EXISTING SIGNS | 1 | LSUM |
$4,000.00 |
$15,621.93 |
$2,575.00 |
| 53 | 850(A) 8110 |
SHEET ALUMINUM SIGNS | 625.16 | SF |
$15.00 |
$24.03 |
$12.88 |
| 54 | 850(B) 8112 |
EXTRUDED ALUMINUM PANEL SIGNS | 1,145.75 | SF |
$25.00 |
$36.05 |
$20.60 |
| 55 | 851(A) 3206 |
4"@13 GALV.STEEL WIDE FLANGE BEAM POST | 72 | LF |
$21.00 |
$36.05 |
$20.60 |
| 56 | 851(A) 3207 |
6"@15 GALV.STEEL WIDE FLANGE BEAM POST | 395.3 | LF |
$22.00 |
$48.07 |
$22.66 |
| 57 | 851(A) 3208 |
6"@20 GALV.STEEL WIDE FLANGE BEAM POST | 91.2 | LF |
$24.00 |
$54.08 |
$24.72 |
| 58 | 851(B) 3217 |
2 1/2"@5.79 GALV.STEEL PIPE POST | 264 | LF |
$20.00 |
$24.03 |
$14.42 |
| 59 | 851(B) 3218 |
3"@7.58 GALV.STEEL PIPE POST | 72 | LF |
$21.00 |
$30.04 |
$15.45 |
| 60 | 851(B) 3219 |
3 1/2"@9.11 GALV.STEEL PIPE POST | 176 | LF |
$22.00 |
$36.05 |
$16.48 |
| 61 | 851(C) 8324 |
2" SQUARE TUBE POST | 615 | LF |
$6.00 |
$12.02 |
$8.24 |
| 62 | 853 9024 |
DELINEATORS(TYPE 1, CODE 1) | 160 | EA |
$14.00 |
$30.04 |
$17.05 |
| 63 | 856(A) 8535 |
TRAFFIC STRIPE(MULTI-POLY.)(6" WIDE) | 192,000 | LF |
$0.5500 |
$0.8200 |
$0.4300 |
| 64 | 856(A) 8540 |
TRAFFIC STRIPE(MULTI-POLY.)(8" WIDE) | 3,000 | LF |
$2.00 |
$2.40 |
$1.29 |
| 65 | 856(A) 8548 |
TRAFFIC STRIPE(MULTI-POLY)(12" WIDE) | 1,320 | LF |
$2.50 |
$6.01 |
$2.58 |
| 66 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$30,000.00 |
$41,000.00 |
$37,286.00 |
| 67 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$3,500.00 |
$2,000.00 |
$24,720.00 |
| 68 | 641 1552 |
MOBILIZATION | 1 | LSUM |
$675,000.00 |
$745,000.00 |
$742,000.00 |