| 1 | 201(A) 0102 |
CLEARING AND GRUBBING | 1 | LSUM |
$15,000.00 |
$18,000.00 |
$18,000.00 |
$47,000.00 |
$45,000.00 |
| 2 | 202(A) 0183 |
UNCLASSIFIED EXCAVATION | 50,927 | CY |
$7.00 |
$5.25 |
$5.25 |
$7.55 |
$8.50 |
| 3 | 202(C) 0182 |
ROCK EXCAVATION | 9,332 | CY |
$20.00 |
$13.50 |
$13.50 |
$16.00 |
$16.00 |
| 4 | 205(A) 4229 |
TYPE A-SALVAGED TOPSOIL | 1 | LSUM |
$5,000.00 |
$16,000.00 |
$16,000.00 |
$33,600.00 |
$16,000.00 |
| 5 | 210 0121 |
OBLITERATING ABANDONED ROAD | 2,038 | LF |
$6.00 |
$3.00 |
$3.00 |
$4.26 |
$5.00 |
| 6 | 221(C) 2801 |
TEMPORARY SILT FENCE | 6,732 | LF |
$1.50 |
$1.00 |
$1.29 |
$1.45 |
$1.50 |
| 7 | 221(F) 0100 |
TEMPORARY SILT DIKE | 630 | LF |
$5.00 |
$6.95 |
$6.95 |
$7.50 |
$7.50 |
| 8 | 230(A) 2806 |
SOLID SLAB SODDING | 49,360 | SY |
$1.80 |
$1.34 |
$1.34 |
$1.60 |
$1.40 |
| 9 | 233(A) 2817 |
VEGETATIVE MULCHING | 13.23 | AC |
$390.00 |
$99.00 |
$99.00 |
$150.00 |
$103.00 |
| 10 | 303(A) 2100 |
AGGREGATE BASE TYPE A | 1,740 | CY |
$55.00 |
$39.38 |
$39.38 |
$44.15 |
$41.00 |
| 11 | 307(D) 4230 |
LIME | 13 | TON |
$150.00 |
$162.48 |
$162.48 |
$175.00 |
$400.00 |
| 12 | 307(H) 4270 |
LIME STABILIZED SUBGRADE | 9,693 | SY |
$4.00 |
$3.00 |
$3.00 |
$2.65 |
$3.50 |
| 13 | 402(E) 0225 |
TRAFFIC BOUND SURFACE COURSE TYPE E | 497 | TON |
$25.00 |
$19.99 |
$19.99 |
$20.00 |
$21.00 |
| 14 | 411(B) 5945 |
SUPERPAVE, TYPE S3(PG 64-22 OK) | 1,475 | TON |
$80.00 |
$84.01 |
$84.01 |
$88.50 |
$86.50 |
| 15 | 411(C) 5960 |
SUPERPAVE, TYPE S4(PG 64-22 OK) | 1,182 | TON |
$90.00 |
$99.73 |
$99.73 |
$93.50 |
$103.00 |
| 16 | 509(D) 0325 |
CLASS C CONCRETE | 10 | CY |
$225.00 |
$150.00 |
$200.00 |
$300.00 |
$395.00 |
| 17 | 601(B) 0536 |
TYPE I-A PLAIN RIPRAP | 369 | TON |
$53.80 |
$37.13 |
$37.13 |
$38.00 |
$39.00 |
| 18 | 601(C) 0538 |
TYPE I-A FILTER BLANKET | 159 | TON |
$46.00 |
$24.29 |
$24.29 |
$36.00 |
$26.00 |
| 19 | 613(A) 0492 |
24" R.C.PIPE CLASS III | 56 | LF |
$63.00 |
$69.00 |
$69.00 |
$64.00 |
$72.00 |
| 20 | 613(B) 0689 |
18" CORR. GALV. STEEL PIPE | 272 | LF |
$27.00 |
$27.20 |
$27.20 |
$28.50 |
$29.00 |
| 21 | 613(L) 5730 |
24" PREFAB. CULVERT END SECTION, ROUND | 2 | EA |
$712.00 |
$871.70 |
$871.70 |
$1,485.00 |
$906.00 |
| 22 | 613(M) 7186 |
TYPE A4 CULVERT END TREATMENT | 8 | EA |
$883.00 |
$400.00 |
$1,500.00 |
$1,500.00 |
$590.00 |
| 23 | 613(T) 1187 |
STANDARD BEDDING MATERIAL, CLASS C | 22 | CY |
$48.00 |
$49.22 |
$49.22 |
$48.15 |
$51.00 |
| 24 | 613(V) 1180 |
TRENCH EXCAVATION | 32 | CY |
$14.00 |
$15.00 |
$15.00 |
$20.00 |
$16.00 |
| 25 | 619(A) 0920 |
REMOVAL OF STRUCTURES & OBSTRUCTIONS | 1 | LSUM |
$5,000.00 |
$7,200.00 |
$7,200.00 |
$8,000.00 |
$7,500.00 |
| 26 | 619(B) 4728 |
REMOVAL OF ASPHALT PAVEMENT | 1,266 | SY |
$3.00 |
$3.25 |
$3.25 |
$3.20 |
$4.00 |
| 27 | 624(C) 4459 |
FENCE-STYLE SWF (5 BARBED WIRE) | 3,184 | LF |
$8.00 |
$8.00 |
$3.85 |
$5.25 |
$5.00 |
| 28 | 501(B) 1307 |
SUBSTRUCTURE EXCAVATION COMMON | 100 | CY |
$14.00 |
$25.00 |
$25.00 |
$15.00 |
$100.00 |
| 29 | 501(G) 6309 |
CLSM BACKFILL | 46 | CY |
$168.00 |
$250.00 |
$100.00 |
$65.00 |
$190.00 |
| 30 | 503(A) 1311 |
PRESTRESSED CONCRETE BEAMS (TYPE II) | 537 | LF |
$195.00 |
$250.00 |
$250.00 |
$182.20 |
$245.00 |
| 31 | 504(A) 1304 |
APPROACH SLAB | 115 | SY |
$170.00 |
$200.00 |
$185.00 |
$175.00 |
$180.00 |
| 32 | 504(B) 1305 |
SAW-CUT GROOVING | 521 | SY |
$10.00 |
$7.40 |
$5.80 |
$8.15 |
$6.00 |
| 33 | 504(D) 6239 |
CONCRETE RAIL (TR3) | 413 | LF |
$50.00 |
$200.00 |
$85.00 |
$78.00 |
$70.00 |
| 34 | 506(A) 1322 |
STRUCTURAL STEEL | 660 | LB |
$5.00 |
$1.00 |
$5.00 |
$3.20 |
$2.00 |
| 35 | 507(A) 6172 |
WEATHERING STEEL FIXED BEARING ASSEMBLY | 6 | EA |
$900.00 |
$1,000.00 |
$1,500.00 |
$415.00 |
$1,250.00 |
| 36 | 507(B) 6176 |
WEATHERING STEEL EXPANSION BEARING ASSEMBLY | 12 | EA |
$900.00 |
$1,000.00 |
$1,500.00 |
$760.00 |
$1,250.00 |
| 37 | 507(C) 6282 |
ELASTOMERIC BEARING PADS | 12 | EA |
$500.00 |
$1,000.00 |
$1,000.00 |
$160.00 |
$150.00 |
| 38 | 509(A) 1326 |
CLASS AA CONCRETE | 152 | CY |
$550.00 |
$200.00 |
$800.00 |
$575.00 |
$950.00 |
| 39 | 509(B) 1328 |
CLASS A CONCRETE | 67.8 | CY |
$570.00 |
$200.00 |
$800.00 |
$575.00 |
$2,500.00 |
| 40 | 511(A) 1332 |
REINFORCING STEEL | 52,301 | LB |
$0.9500 |
$1.50 |
$0.8500 |
$1.00 |
$1.25 |
| 41 | 514(A) 6010 |
PILES, FURNISHED (HP 10X42) | 223 | LF |
$30.00 |
$27.40 |
$55.00 |
$34.25 |
$60.00 |
| 42 | 514(B) 6292 |
PILES, DRIVEN (HP 10X42) | 223 | LF |
$13.00 |
$8.00 |
$55.00 |
$25.00 |
$30.00 |
| 43 | 514(L) 6220 |
PILE SPLICE, H-PILE (NON-BIDDABLE) | 1 | EA |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
$400.00 |
| 44 | 516(A) 6093 |
DRILLED SHAFTS 42" DIAMETER | 94 | LF |
$670.00 |
$800.00 |
$800.00 |
$752.00 |
$2,835.00 |
| 45 | 601(B) 1353 |
TYPE I-A PLAIN RIPRAP | 1,963 | TON |
$35.00 |
$33.33 |
$33.00 |
$37.00 |
$38.00 |
| 46 | 601(C) 1355 |
TYPE I-A FILTER BLANKET | 331 | TON |
$25.00 |
$21.29 |
$21.00 |
$35.00 |
$35.00 |
| 47 | 613(H) 6204 |
6" PERFORATED PIPE UNDERDRAIN ROUND | 52 | LF |
$25.00 |
$60.00 |
$40.00 |
$75.00 |
$20.00 |
| 48 | 613(I) 6207 |
6" NON-PERF.PIPE UNDERDRAIN RND. | 40 | LF |
$20.00 |
$60.00 |
$40.00 |
$30.00 |
$20.00 |
| 49 | 619(D) 1397 |
REMOVAL OF EXISTING BRIDGE STRUCTURE | 1 | LSUM |
$6,000.00 |
$9,000.00 |
$9,000.00 |
$7,500.00 |
$10,000.00 |
| 50 | 623(F) 5686 |
GUARDRAIL ANCHOR UNIT (TYPE D-BF) | 4 | EA |
$1,400.00 |
$1,000.00 |
$1,000.00 |
$1,550.00 |
$1,025.00 |
| 51 | 623(G) 8571 |
GUARDRAIL END TREATMENT (GET) | 4 | EA |
$2,250.00 |
$1,750.00 |
$1,750.00 |
$2,450.00 |
$1,825.00 |
| 52 | 855(A) 8812 |
TRAFFIC STRIPE(PLASTIC)(4" WIDE) | 14,200 | LF |
$0.6000 |
$0.5200 |
$0.5200 |
$0.6000 |
$0.5500 |
| 53 | 880(J) 8905 |
CONSTRUCTION TRAFFIC CONTROL | 1 | LSUM |
$8,000.00 |
$2,600.00 |
$2,600.00 |
$3,600.00 |
$3,500.00 |
| 54 | 642(B) 0096 |
CONSTRUCTION STAKING LEVEL II | 1 | LSUM |
$50,000.00 |
$6,500.00 |
$11,500.00 |
$23,100.00 |
$16,000.00 |
| 55 | 220 2800 |
SWPPP DOCUMENTATION AND MANAGEMENT | 1 | LSUM |
$2,000.00 |
$1,000.00 |
$4,000.00 |
$4,000.00 |
$1,971.00 |
| 56 | 641 1399 |
MOBILIZATION | 1 | LSUM |
$92,000.00 |
$37,000.00 |
$89,750.00 |
$84,000.00 |
$143,000.00 |